trinityboringsolutions.com

Hart Texas Directional Boring: Olton Clay Loam, FM 168 and Lubbock and Western Railway

Quick Answer: Olton clay loam covers most of Hart, and its sticky cuttings can load a reamer. We take directional boring, also called horizontal directional drilling (HDD), across Hart, including under FM 168 and its street approaches. The Yukon main office is 337 road miles away, and the Lubbock and Western Railway also shapes crossing plans. Clay loam holds an open hole, but its clay can grip pipe, so staged reaming and a same day pull matter around 1st Street.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hart bores at a glance

  • Incorporated city in Castro County, Texas. Population 881 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 337 miles, about 6.3 hours of driving.
  • Ground: Olton soil is mapped on 95 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 168, Texas State Highway 194 and FM 145. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: Lubbock and Western Railway, with 4 mapped street and rail crossings.
  • Public water: Hart Municipal Water System, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near 1st Street in Hart?

Hart is in Castro County, where the Census Bureau Vintage 2024 estimate puts the population at 881. We take directional boring work for water, sewer, gas, electric conduit and fiber lines along streets such as 1st Street and Broadway, and beneath FM 168 where a route needs to pass without opening the pavement. We handle the bore from planning through the bore log.

Our longest bore ran roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa, Oklahoma. Our main office is in Yukon, Oklahoma, and Hart work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A Hart bore is typically a shorter utility crossing under 1st Street or FM 168, planned for the local clay loam.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What does the Olton soil survey show in Hart?

The USDA soil survey maps Olton soil across 95 percent of Hart. Olton clay loam with 0 to 1 percent slopes covers 74 percent of the mapped area, while the 1 to 3 percent slope unit covers 20 percent. At about 40 inches below the surface, clay loam is mapped under 98 percent of Hart, with an average clay content of 38 percent. At Hart, our mapped information shows no sandy area at that depth. Across Hart, we treat these mapped patterns as planning information, not as test borings. For a bore near 1st Street, expect sticky cuttings that can ball on the reamer.

USDA soil survey, inside the Hart city limitsWhat is mapped
Soil series mappedOlton 95 percent
Texture at the surfaceclay loam 98 percent
Texture about 40 inches downclay loam 98 percent
Engineering class about 40 inches downlean clay (CL) 98 percent
Average clay content about 40 inches down38 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches2 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

From Hart’s mapping, we see no bedrock in the top five feet, though deeper rock remains possible. Seasonal water table conditions are mapped within 60 inches in 2 percent of the area, and flood prone soils are not mapped. High steel corrosion risk is mapped across the area, so the line owner should choose any coating for steel casing or tracer wire; HDPE avoids that steel concern. The USDA geology map shows the Blackwater Draw Formation, a Cenozoic unit of sand, silt and locally clayey material, over Cenozoic sedimentary rocks of Paleocene age. That mix calls for attention to changing cuttings along FM 168.

How do we bore Hart’s clay loam?

Hart’s clay loam can stay open yet cling to the reamer and pipe. Around 1st Street, we adjust the fluid and reaming sequence to the sticky ground, then keep the pull close to the final ream.

  1. We use a thinner drilling fluid and polymer in Hart’s sticky Olton clay loam, then ream in stages to limit clay buildup on the tooling.
  2. Because Hart’s mapped soil has 38 percent average clay at about 40 inches, we watch fluid returns so pressure does not lift pavement near Broadway.
  3. We plan to pull pipe the same day the hole is opened, since the clay around 1st Street can swell and grip the pipe.
  4. Before the drill nears marked utilities along FM 168, we hydrovac pothole them; a walkover locator tracks the head and we log depth and pitch.
Drilling fluid returns at the entry as the Vermeer D24x40 S3 drills a 385 foot sandstone rock bore in Guthrie, Oklahoma
Drilling fluid coming back to the entry pit as our Vermeer D24x40 drills a 385 foot bore in Guthrie, Oklahoma.

Which roads and tracks does a Hart bore cross near the Lubbock and Western Railway?

FM 168 has 2.1 mapped roadway miles inside Hart, Texas State Highway 194 has 1.3, and FM 145 has 0.5. Those state routes can put a utility bore in TxDOT right of way, so the route and required depth matter before drilling. Within the city, 1st Street runs 1.13 miles, Broadway 1.02 miles and 2nd Street 0.95 miles. A crossing beneath any of them can keep the pavement intact, with entry and exit pits placed off the traveled surface where space allows.

CrossingTypeMapped extentWho has a say
FM 168State highway2.1 roadway miles insideState highway office
Texas State Highway 194State highway1.3 roadway miles insideState highway office
FM 145State highway0.5 roadway miles insideState highway office
Lubbock and Western RailwayRailroad1.92 track miles insideThe railroad
Swipe the table sideways to see every column.

The Lubbock and Western Railway has 1.92 track miles in Hart, with four mapped street and rail crossings. A crossing there needs an agreement from the railroad that owns the track, which determines casing, depth and flagging. No streams are mapped inside Hart or within 1 mile, and no lakes or ponds are mapped within 1 mile. So the local crossing plan centers on roads and rail, rather than a mapped creek channel.

Who approves a Hart bore in Castro County?

Hart is an incorporated city, so its city streets, including Broadway and 1st Street, belong to the city. A bore in the right of way of FM 168, FM 145 or Texas State Highway 194 needs a TxDOT utility permit. The utility that owns the line submits the application through TxDOT’s online RULIS system, and the TxDOT Lubbock District reviews it. For Hart work, we provide the bore plan and profile and work under the permit issued to the utility owner. TxDOT cover rules set the depth: electric and communication lines need 60 inches below the lowest crossed grade, while water lines need 60 inches at a crossing. The district may set another depth in the permit. A crossing of the Lubbock and Western Railway also needs an agreement with the track owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are in Hart near Hart Municipal Water System?

Hart Municipal Water System is a local government system using groundwater wells. It serves 1,000 people through 365 service connections, so a water service bore on Broadway may connect to a network supplied by local wells. Electric service reported in Castro County includes Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric Cooperative. We confirm the line owner before planning a conduit bore along FM 168, since the countywide reporting does not identify the provider at every address.

Line ownerWhat it isSourceSize
Hart Municipal Water SystemPublic water systemGroundwater wells365 connections, 1,000 people served
Southwestern Public Service, Bailey County Electric Cooperative Association, Deaf Smith Electric Cooperative and Lamb County Electric CooperativeElectric utilities reporting service in Castro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

For underground planning in Hart, we consider the American Community Survey 2019 to 2023 five year estimates, which put the median housing year at 1972. Of 402 housing units, 25 percent were built before 1960, 56 percent from 1960 to 1999, and 19 percent in 2000 or later. That mix means a bore along Broadway could serve either a replacement line or a newer service. Before drilling near 1st Street, we hydrovac pothole marked utilities because paint shows their position, not their depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Hart from Nazareth and our Yukon yard?

Hart is an incorporated city in Castro County, at an elevation of 3,672 feet and covering 0.74 square miles. Its ZIP code is 79043. Nazareth is 10.8 miles north, while Olton is 14.3 miles south and Edmonson is 14.5 miles southeast. Dimmitt, the county seat, is 15.7 miles northwest; Plainview is 26.1 miles southeast. From our Yukon, Oklahoma main office, the road trip is 337 miles and 6.3 hours. That distance is part of planning a bore along FM 168, especially when equipment and crew mobilization are needed.

Places near Hart

What boring work comes up near 2nd Street in Hart?

  • Street crossing: A bore under 2nd Street can carry water, sewer or conduit below the pavement, with pits set beyond the travel path.
  • Highway crossing: A utility route beneath FM 168 needs a TxDOT reviewed plan and the cover required for that line type.
  • Rail crossing: The 1.92 track miles of the Lubbock and Western Railway in Hart make railroad agreement and crossing details part of the route plan.
  • Water service: A connection near Hart Municipal Water System can extend a groundwater supplied service without opening the street along Broadway.
  • Fiber route: Fiber conduit along Texas State Highway 194 needs the line owner identified before a right of way application is prepared.
  • Replacement bore: Older housing near 1st Street may call for a replacement service route, with marked lines exposed before the drill approaches.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Hart bore near FM 168?

A map pin matters near FM 168 because the exact right of way can determine who reviews a crossing and where the bore can run. Send the Hart address or pin, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see the route around 1st Street, pavement and the Lubbock and Western Railway.

For Hart projects, we set the price according to the job scope. Ground conditions matter: Hart’s Olton clay loam can cling to tooling, affecting reaming and pull time. Crossings matter too, including TxDOT routes such as FM 168 and the Lubbock and Western Railway. We also consider footage, pipe size, utilities to expose, pavement, pits and excavator time. At 337 road miles from Yukon, mobilization is part of the logistics, along with any high profile or emergency work.

Questions people ask about boring in Hart

Does Trinity take directional boring work in Hart and Castro County, and who staffs it?

Yes. We take work in Hart and across Castro County, with our own crews or partner contractor crews from vetted satellite yards. Trinity stays your contact through the bore log, regardless of which crew is on site. A project near 1st Street is planned around its specific route, line and crossings.

How old are Hart’s buried lines near Broadway, and does that affect replacement bores?

Housing age offers context, but it does not date each buried line. The American Community Survey 2019 to 2023 estimates give Hart a median housing year of 1972, with 25 percent of units built before 1960. A replacement bore near Broadway starts with locating and exposing marked utilities before the drill approaches.

Can Hart’s Olton soil corrode steel, and what pipe should a bore use?

The USDA soil survey maps high steel corrosion risk across Hart, including Olton clay loam. That matters for uncoated steel casing and tracer wire. HDPE does not share that steel corrosion concern, while the line owner chooses any coating for steel components. We review the material with the line owner for a route near FM 168.

What ground does a bore pass through in Hart’s Olton soil?

The USDA soil survey maps Olton soil across 95 percent of Hart, and clay loam across 98 percent at about 40 inches below the surface. The average clay content there is 38 percent. That sticky ground can ball on the reamer and grip pipe, so staged reaming and a prompt pull matter near 2nd Street.

Could a directional bore in Hart encounter rock below the mapped top five feet?

Bedrock is not mapped in Hart’s top five feet, but that does not rule out rock deeper down. The geology map shows the Blackwater Draw Formation, with sand, silt and locally clayey material, above Cenozoic sedimentary rocks of Paleocene age. A bore near 1st Street still needs its depth and ground conditions checked as it advances.

Who approves a bore under FM 168 in Hart?

For work in FM 168 right of way, the line owning utility applies for a TxDOT utility permit through RULIS, and the TxDOT Lubbock District reviews it. We supply the plan and profile and work under the utility owner’s permit. The required cover depends on the line type and the approved crossing plan.

Does Trinity cover Nazareth and rural sites outside Hart?

Yes. We take Texas work around Hart, including routes toward Nazareth, 10.8 miles north, and Olton, 14.3 miles south. Rural sites outside city limits can also be considered. A map pin near FM 168 or a nearby road helps us understand the route, access and distance from the Yukon yard.

How much notice does Texas811 need for a bore near 1st Street in Hart?

For a bore along 1st Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For Hart scheduling, we follow Texas811’s description of that notice as at least two working days. If the start slips more than 14 days past the original notice, request a new ticket; worn or moved marks need refreshing through Texas811 before work continues.

What affects the cost of a directional bore near FM 168 in Hart?

The scope drives the price, not one factor alone. Hart’s Olton clay loam affects drilling and reaming; FM 168 or a Lubbock and Western Railway crossing adds planning and exposure needs. Footage, pipe size, pavement, pits, excavator time and utilities to cross also matter. Mobilization from Yukon is another job specific consideration.

Where the Hart facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hart

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hart, Texas

Type the address of your job in Hart. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hart

Same county: Summerfield. All counties: Texas county list.