Gustine Texas Directional Boring: Purves Clay, Texas State Highway 36 and Holmsley Creek
Quick Answer: Can a line pass below Texas State Highway 36 without opening the pavement? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for Gustine, Texas crossings. From our Yukon, Oklahoma main office, Gustine is 318 road miles away, and Holmsley Creek is a nearby crossing consideration. Purves clay is mapped across 21 percent of the town, so sticky cuttings and clay grip can shape reaming and pull timing. That ground makes staged reaming and fluid control useful around Main Street pavement.
Gustine bores at a glance
- Incorporated city in Comanche County, Texas. Population 420 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 318 miles, about 6.5 hours of driving.
- Ground: Purves soil is mapped on 22 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 45 percent of the area.
- Highways inside the boundary: Texas State Highway 36 and Loop 130. State permit office: TxDOT Brownwood District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Gustine, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Gustine, Comanche County?
Can a line pass beneath Main Street without cutting the pavement? Yes. We take directional boring jobs in Gustine, in Comanche County, where the Census Bureau Vintage 2024 estimate puts the population at 420. We install water, sewer, gas, electric conduit and fiber; on Leon Street or Lucy Bertram, a bore can carry a replacement or new service below the surface.
Our main office is in Yukon, Oklahoma, and Gustine work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to account for ground such as Purves clay when choosing a drilling approach. Our family business began in 1965, and we stay involved from the first call through the bore log.

What does the soil survey show beneath Gustine and Purves soil?
The USDA soil survey maps Purves as 22 percent of Gustine’s soil series and Purves clay, 1 to 3 percent slopes, across 21 percent of the mapped area. Menard accounts for 21 percent and Pedernales for 19 percent. Surface textures include fine sandy loam at 37 percent and clay at 21 percent, while loamy sand covers 14 percent. At about 40 inches below the surface, the survey maps bedrock under 37 percent of the area, sandy clay under 32 percent and sandy clay loam under 24 percent. We treat mapped Purves patterns as planning references, not test borings, before setting a Gustine bore route.
| USDA soil survey, inside the Gustine city limits | What is mapped |
|---|---|
| Soil series mapped | Purves 22 percent, Menard 21 percent, Pedernales 19 percent, Bolar 13 percent and Chaney 8 percent |
| Texture at the surface | fine sandy loam 37 percent, clay 21 percent and loamy sand 14 percent |
| Texture about 40 inches down | bedrock 37 percent, sandy clay 32 percent and sandy clay loam 24 percent |
| Engineering class about 40 inches down | clayey sand (SC) 46 percent, lean clay (CL) 10 percent and fat clay (CH) 6 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | 45 percent of the area (35 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 6 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 36 percent of the area |
Bedrock is mapped within 60 inches across 45 percent of Gustine; hard bedrock accounts for 35 percent and weathered bedrock for 10 percent. The typical mapped depth is 26 inches, so a route near Purves soil may meet rock sooner than a surface view suggests. Seasonal water table is mapped within 60 inches across 6 percent, while flood prone soils are not mapped. High steel corrosion risk covers 36 percent, a concern for uncoated steel casing or tracer wire; the line owner selects any coating, while HDPE is not affected. The mapped Twin Mountains Formation is Aptian and includes sandstone, claystone and conglomerate, so field conditions can change along a bore.
How do we drill Gustine ground with mapped bedrock?
Purves clay, sandy clay and shallow mapped bedrock call for a bore plan that can adjust as the ground changes. On Main Street or near Texas State Highway 36, we check marked lines before drilling and track the head as it advances.
- Purves clay can cling to the reamer and grip pipe, so we control fluid, enlarge the hole in stages and plan the pull around the mapped clay.
- Where Gustine’s sandy clay loam or loamy sand appears, staged reaming and drilling fluid help keep the hole supported while pipe is readied for the pull.
- With bedrock mapped within 60 inches in parts of Gustine, we adjust the drilling approach if the bit meets hard or weathered rock along the route.
- Before a bore near Leon Street, we expose marked utilities with hydrovac potholing; a walkover locator tracks the drill head and records depth and pitch.

Which roads, tracks or creeks could a Gustine bore cross near Holmsley Creek?
Texas State Highway 36 has 1.2 mapped roadway miles inside Gustine, and Loop 130 has 0.5. Those state routes may call for a bore that stays below pavement and within the route’s right of way limits. Main Street is the longest named street at 1.04 miles in town, followed by Lucy Bertram at 0.83 miles and Leon Street at 0.8 miles. Commerce Street adds another possible route for a service or utility bore. A plan tied to the actual address shows which street or highway is involved.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 36 | State highway | 1.2 roadway miles inside | State highway office |
| Loop 130 | State highway | 0.5 roadway miles inside | State highway office |
| Holmsley Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| South Leon River | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Gustine or within 1 mile outside its limits, and public records show no mapped street and rail crossings in town. Holmsley Creek runs along or touches the town boundary, while the South Leon River is 0.3 miles away. No streams are mapped inside Gustine, and no street crossings of named streams are mapped within the town. We account for the mapped absence of lakes or ponds within 1 mile when planning underground work around Main Street in Gustine. If a planned route reaches Holmsley Creek, we check during planning for U.S. Army Corps of Engineers jurisdiction.
Whose permission does a Gustine bore near Texas State Highway 36 need?
Texas State Highway 36 and Loop 130 are state routes, so work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Brownwood District. The utility owner files in RULIS; we prepare a bore plan and profile and work under its permit. At Texas State Highway 36, electric and communication crossings need 60 inches of cover, water crossings need 60 inches, and pressurized sewer crossings need 60 inches; the district can set a different depth. Existing pavement is bored or tunneled, with casing. Gustine handles city streets such as Commerce Street. A Holmsley Creek crossing is checked for Corps jurisdiction; no railroad is mapped in town.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near the City of Gustine water system?
The City of Gustine public water system uses groundwater wells and serves 392 people through 234 service connections. That means a proposed water bore may need to fit around existing local water lines. Utilities reporting electric service in Comanche County include Oncor Electric Delivery Company, Texas-New Mexico Power, Comanche County Electric Cooperative Association, Hamilton County Electric Cooperative Association and United Electric Cooperative Service. We confirm the line owner for the address before planning a conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Gustine | Public water system | Groundwater wells | 234 connections, 392 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, Comanche County Electric Cooperative Association, Hamilton County Electric Cooperative Association and United Electric Cooperative Service | Electric utilities reporting service in Comanche County | EIA Form 861 | Confirm the line owner by address |
We use Gustine’s 1966 median housing year from the American Community Survey 2019 to 2023 five year estimates as context when planning underground work along Main Street. The survey says 42 percent of homes were built before 1960, while 1 percent were built in 2000 or later. A replacement line along Lucy Bertram may have to share a crowded route with older buried service; a new service may take a different path. We use hydrovac potholing to expose each marked utility on the bore path, since paint does not show depth.

How far is Gustine from Lamkin and our Yukon office?
Gustine is in Comanche County, at an elevation of 1,191 feet, and covers 0.92 square miles. Its ZIP code is 76455. Lamkin is 8.4 miles east, Proctor is 9.9 miles north, and Comanche, the county seat, is 12.4 miles west. Stephenville is the nearest larger city, 27.6 miles northeast. Our Yukon, Oklahoma main office is 318 road miles away, a drive of 6.5 hours. That distance is part of planning mobilization for work around Gustine and nearby rural addresses.
Places near Gustine
- Directional boring in Lamkin: 8.4 miles east
- Directional boring in Proctor: 9.9 miles north
- Directional boring in Comanche: 12.4 miles west
- Directional boring in Priddy: 13.4 miles southwest
- Directional boring in Carlton: 14.5 miles east
- Directional boring in Stephenville: 27.6 miles northeast
What boring work comes up near Gustine’s Main Street?
- Highway crossing: A bore beneath Texas State Highway 36 keeps the line below the paved route, with the permit and cover planned for the utility type.
- Water service: A route near the City of Gustine system can carry a replacement water line without opening Main Street pavement.
- Fiber conduit: A conduit bore along Lucy Bertram gives the route a way below the street surface, with marked utilities exposed first.
- Creek crossing: A planned route near Holmsley Creek needs a profile that accounts for the channel and a jurisdiction check during planning.
- Street replacement: A bore near Leon Street can place a new sewer or water line beneath the road while avoiding an open cut.
- Rural service: Work toward Lamkin can involve longer access and mobilization planning than a short bore inside Gustine.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of boring near Gustine’s Commerce Street?
Start with the address or map pin, such as a route on Commerce Street, then tell us what goes in the ground. Give the pipe or conduit size and the footage, whether the work is a water line near the City of Gustine system or conduit near Texas State Highway 36. A sketch or plans help us see the route, access and crossings before we put the scope together.
The price follows the work, not a standard rate. Purves clay and mapped bedrock affect drilling time; pipe size and bore length change the equipment and reaming plan. Crossings matter too: a route beneath Texas State Highway 36 or near Holmsley Creek brings different planning needs than a clear run along Commerce Street. Concrete or pavement, exposed utilities, pits, excavator time and sand backfill also shape the scope. Mobilization from Yukon matters at 318 road miles, and emergency or high profile work can add demands.
Questions people ask about boring in Gustine
Does Trinity take directional boring jobs in Gustine and Comanche County, and who does the work?
Yes. We take directional boring work in Gustine and across Comanche County. Our own crews handle the work, with support from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, whether the crew is working near Main Street or outside town.
Can a Gustine bore under Leon Street avoid cutting the street, and who is in charge?
Yes, directional boring can place a line beneath Leon Street without cutting the pavement. Because Gustine is an incorporated town in Comanche County, we treat Main Street as a city street for boring coordination. Texas State Highway 36 is different: work in its right of way is handled through TxDOT. The route determines which approval applies.
What do Gustine’s Lucy Bertram housing ages mean for a replacement bore?
The American Community Survey 2019 to 2023 five year estimates give Gustine a median housing year of 1966, with 42 percent of homes built before 1960. Older housing can mean a replacement line needs to work around existing services along Lucy Bertram. We expose marked utilities before drilling near them because surface marks do not show burial depth.
Can Purves soil in Gustine corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk across 36 percent of Gustine. For a crossing on Texas State Highway 36, we leave steel casing or tracer wire coating selection to the line owner. With fine sandy loam at the surface in Gustine, we distinguish HDPE from steel because the stated soil corrosion concern does not affect HDPE. Purves clay is one part of the mapped ground, so the route and the owner’s material choice both matter.
What ground will a bore through Gustine Purves soil encounter?
Purves is mapped as 22 percent of Gustine’s soil series. At about 40 inches below the surface, bedrock is mapped under 37 percent of the area, sandy clay under 32 percent and sandy clay loam under 24 percent. Those are USDA soil survey patterns, not test borings, so the actual route can vary.
How much bedrock is mapped within five feet of the surface in Gustine?
The USDA soil survey maps bedrock within 60 inches across 45 percent of Gustine. Hard bedrock accounts for 35 percent of the area and weathered bedrock for 10 percent. That mapping signals that a bore may meet rock at a shallow depth, but it does not mean every route has the same profile.
Does Trinity cover Gustine, Lamkin and rural sites outside town?
Yes. We take work in Gustine, nearby Lamkin and rural locations outside town, with the route and access shaping the plan. Lamkin is 8.4 miles east of Gustine. For each site, we review the address, ground, line crossings and distance from our Yukon, Oklahoma main office.
How much 811 notice does a bore on Gustine’s Main Street need, and what if marks move?
The person requesting the locate for a Main Street bore must contact Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If a start in Gustine slips more than 14 days past the original notice, we submit a new request before boring near Loop 130. If marks shift near Leon Street in Gustine, we have them refreshed through Texas811 before we continue work.
What affects the cost of a Gustine bore near Texas State Highway 36?
For boring work near the South Leon River in Gustine, we base pricing on the defined job scope. Length, pipe or conduit size, Purves clay or bedrock, exposed utilities, pavement, pits and creek crossings can all affect the work. A Texas State Highway 36 crossing adds permit planning, while a route 318 road miles from Yukon also affects mobilization. Emergency or high profile work can change the requirements.
Where the Gustine facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Gustine
- U.S. Census Bureau, TIGER/Line 2024: Gustine boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Gustine
- U.S. Census Bureau, American Community Survey 2019 to 2023: Gustine housing units and year built
- Macrostrat geologic map compilation: map units under Gustine
- U.S. EPA Safe Drinking Water Information System: public water systems serving Gustine
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Comanche County
- U.S. Geological Survey, Elevation Point Query Service: Gustine elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Gustine
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Gustine
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Gustine, Texas
Type the address of your job in Gustine. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Gustine
Same county: De Leon. All counties: Texas county list.
