trinityboringsolutions.com

Carlton Texas Directional Boring: Pidcoke Gravelly Clay Loam, FM 219 and Walnut Clay

Quick Answer: The water provider for a Carlton address needs confirmation before a bore is planned, and Hamilton County electric service reports include Texas-New Mexico Power and three cooperatives. We do directional boring, also called horizontal directional drilling (HDD), for crossings such as FM 219 in Carlton, Texas. Carlton is 303 road miles from our Yukon, Oklahoma main office, with Hico 9.5 miles northeast as a nearby route reference. Pidcoke soil is commonly mapped to bedrock at about 40 inches, so the bore plan must account for shallow rock.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Carlton bores at a glance

  • Unincorporated community in Hamilton County, Texas. Population 102 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 303 miles, about 6.2 hours of driving.
  • Ground: Pidcoke soil is mapped on 69 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 69 percent of the area.
  • Highways inside the boundary: FM 219, FM 1744 and FM 2823. State permit office: TxDOT Waco District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near FM 219 in Carlton?

We take directional boring work in Carlton, an unincorporated community in Hamilton County with a 2020 Census count of 102 people. Our crews install water, sewer, gas, electric conduit and fiber, including service routes that need to pass beneath FM 219 or FM 1744. The electric line owner and the water provider for the specific address need to be confirmed before we plan a bore.

Our main office is in Yukon, Oklahoma, and Carlton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have bored since 1982. Four decades of drilling means we plan for mapped conditions like Pidcoke gravelly clay loam and shallow bedrock rather than treating every Carlton route as ordinary soil.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Pidcoke soil map in Carlton?

The USDA soil survey maps Pidcoke soil across 69 percent of Carlton, mainly as gravelly clay loam with 1 to 3 percent slopes. Krum silty clay covers 16 percent, and Nuff very stony silty clay loam covers 13 percent. At about 40 inches below the surface, the survey maps bedrock across 69 percent of the area and silty clay across 16 percent. Heavy clay accounts for 29 percent at that depth, while sandy ground is not mapped there. These are mapped patterns, not test borings, so a route still needs site specific planning.

USDA soil survey, inside the Carlton mapped community boundaryWhat is mapped
Soil series mappedPidcoke 69 percent, Krum 16 percent and Nuff 13 percent
Texture at the surfacegravelly clay loam 71 percent, silty clay 16 percent and very stony silty clay loam 13 percent
Texture about 40 inches downbedrock 69 percent, silty clay 16 percent and clay 13 percent
Engineering class about 40 inches downfat clay (CH) 16 percent and elastic silt (MH) 13 percent
Average clay content about 40 inches down46 percent
Bedrock mapped within 60 inches69 percent of the area (69 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel29 percent of the area

The USDA soil survey maps bedrock at a typical depth of 18 inches in Carlton, which can call for slower drilling and a rock capable tool where the route meets hard material. Seasonal water tables and flood prone soils are not mapped in the survey area. High steel corrosion risk is mapped across 29 percent, so the line owner should consider casing and tracer wire materials; HDPE avoids that concern. The mapped Walnut Clay unit is Albian age and includes clay, limestone and shale, so subsurface conditions can change along a bore.

How do crews handle Carlton bedrock?

Pidcoke soil and the Walnut Clay map unit point to a route where clay, limestone and shale may affect the bore. We check the site conditions and choose the drilling approach before setting the path.

  1. Pidcoke soil maps gravelly clay loam at the surface and bedrock commonly near 18 inches, so we verify the route and tool needs before drilling.
  2. Where Carlton’s heavy clay is present, we control fluid returns and ream in stages to limit sticky cuttings and pressure beneath pavement.
  3. Near FM 219, we track the drill head from the surface and log depth and pitch as the bore advances beneath the highway.
  4. Before a bore near FM 1744, we hydrovac pothole each marked utility along the path because locate paint does not show burial depth.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

Where might a Carlton line have to go under FM 219?

FM 219 has 1.4 mapped roadway miles inside the Carlton community boundary, while FM 1744 has 1.1 and FM 2823 has 0.1. These are state highways, so a route beneath pavement needs a bore or tunnel rather than open trenching. For a highway right of way crossing, TxDOT cover requirements depend on the line: electric and communication lines and water lines need 60 inches below the lowest crossed grade, while the permit may set another depth. Rural highway bores must extend below all travel lanes.

CrossingTypeMapped extentWho has a say
FM 219State highway1.4 roadway miles insideState highway office
FM 1744State highway1.1 roadway miles insideState highway office
FM 2823State highway0.1 roadway miles insideState highway office
Rocky CreekStream nearby0.8 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Carlton or within one mile outside the community boundary, so there is no mapped track crossing to plan around. Rocky Creek is 0.8 miles outside the boundary; no named stream crossing is mapped inside. The community has 1.17 miles of unnamed drainage, which can affect a route even without a named creek crossing. No lakes or ponds are mapped within one mile, and no street crossing of a named stream is mapped inside Carlton.

Who approves Carlton work along Hamilton County roads?

Carlton has no city government, so its streets are not city streets; a local street bore must be coordinated with the county, while FM 219, FM 1744 and FM 2823 are state highways. Work in those highway rights of way needs a TxDOT utility permit reviewed by the Waco District. The utility that owns the line files through TxDOT RULIS, and we prepare the bore plan and profile for that filing. For a water crossing near Rocky Creek, planning checks whether the U.S. Army Corps of Engineers has jurisdiction. No railroad is mapped near the community.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already in the ground in Hamilton County in Carlton?

A public water system could not be matched to Carlton by name in the available EPA drinking water records, so confirm the water provider for the specific address with the county or local water district before planning a bore. Utilities reporting electric service in Hamilton County include Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service. We confirm which company owns the line at the route before planning an electric conduit bore near FM 219.

Line ownerWhat it isSourceSize
Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative ServiceElectric utilities reporting service in Hamilton CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates report that Carlton housing dates to 1939 or earlier at the median, with all housing units built before 1960. That age makes a replacement bore different from a new service route, but it does not establish when any buried line was installed. Before drilling near FM 219, we hydrovac pothole every marked utility on the bore path; paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Where is Carlton in relation to Stephenville?

Carlton is an unincorporated community in Hamilton County, at an elevation of 1,333 feet and covering 0.78 square miles. Its ZIP code is 76436. Lamkin is 8.5 miles southwest, Hico is 9.5 miles northeast, Gustine is 14.5 miles west, Dublin is 15.2 miles northwest and Hamilton is 15.5 miles south. Hamilton is the county seat, and Stephenville is 20.6 miles north. From our Yukon, Oklahoma main office, the route is 303 road miles and a 6.2 hour drive, which affects mobilization for a Carlton bore.

Places near Carlton

What would we bore near Rocky Creek in Carlton?

  • Highway crossing: A bore beneath FM 219 keeps the route below the paved travel lanes and follows the TxDOT permit plan.
  • Water service: A service route near FM 1744 needs the address water provider confirmed before we choose the connection path.
  • Fiber conduit: A route beneath FM 2823 can carry fiber without cutting the mapped state highway pavement.
  • Drainage crossing: Near Carlton’s 1.17 miles of unnamed drainage, the route needs enough depth and room for entry and exit pits.
  • Creek approach: Rocky Creek lies 0.8 miles beyond the mapped community boundary, so a nearby route can require crossing specific planning.
  • Replacement bore: Carlton housing dates to 1939 or earlier at the median, making an older service route a possible replacement project.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Carlton bore near Rocky Creek?

For a quote, send the Carlton address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help. A route near Rocky Creek or one of the FM roads is useful to identify because crossings and access change the drilling plan. We can then review the scope with you before quoting.

The mapped Pidcoke bedrock is the first price factor because it can require rock capable tooling and slower progress. Next, the route under FM 219 or another paved highway affects crossing design and permit planning. The number of marked utilities to expose, pavement or concrete, and any drainage crossing such as the area near Rocky Creek also change the scope. Pits, excavator time, sand backfill, pipe size and footage matter too. Carlton’s 303 road miles from Yukon affect mobilization.

Questions people ask about boring in Carlton

Does Trinity take directional boring jobs in Carlton, Hamilton County, and who staffs them?

Yes. We take work in Carlton and staff it with our crews or vetted partner contractor crews operating from satellite yards. Our main office is in Yukon, Oklahoma, and you work with Trinity through the bore log regardless of which crew is on site. The route and utility owner still need to be confirmed for the Carlton address.

Can a line be bored beneath Rocky Creek near Carlton?

A bore beneath or near Rocky Creek can be considered after the route and site conditions are reviewed. The creek is 0.8 miles outside Carlton’s mapped community boundary, and planning checks for U.S. Army Corps of Engineers jurisdiction. The channel route, access and required depth determine whether a bore is workable.

Which company owns the electric line in Carlton, Hamilton County, and who confirms conduit details?

The specific electric line owner must be confirmed for the Carlton address before a conduit bore. Hamilton County service reporters include Texas-New Mexico Power, Hamilton County Electric Cooperative Association, Heart of Texas Electric Cooperative and United Electric Cooperative Service. The owner can confirm its conduit specifications for a route near FM 219.

Who is in charge of Carlton streets in Hamilton County, and does a bore require cutting them?

Carlton is unincorporated and has no city government, so local street coordination is with the county rather than a city. A directional bore can pass below a street without cutting its surface. FM 219 and the other farm to market roads are state highways, where TxDOT permitting applies to work in the right of way.

Are buried lines in Carlton, Hamilton County as old as its housing, and what does that mean for a replacement bore?

The American Community Survey 2019 to 2023 estimates put Carlton housing at a median build year of 1939 or earlier, but that does not date buried utilities. A replacement bore may follow an older service route or avoid it, depending on the plans and exposed lines. We pothole marked utilities near FM 1744 before drilling close to them.

Does Pidcoke soil in Carlton corrode steel, and what pipe should a bore use?

The USDA soil survey maps high steel corrosion risk across 29 percent of Carlton, including areas with Pidcoke soil. The line owner selects suitable casing and tracer wire materials for the specific route. HDPE is not affected by that soil corrosion concern, but the pipe choice depends on what the utility owner requires.

How far is Carlton from Trinity’s Yukon office, and does Stephenville change the job plan?

Carlton is 303 road miles and a 6.2 hour drive from our Yukon, Oklahoma main office. Stephenville is 20.6 miles north of Carlton and can help orient a route, but the Yukon distance affects mobilization. Soil conditions such as the mapped shallow bedrock and the actual crossing scope also shape the plan.

How much Texas811 notice does a Carlton, Hamilton County bore need, and what happens to the marks?

Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If a Carlton start moves more than 14 days past the original notice, make a new request. Worn or moved marks must be refreshed through Texas811 before work continues.

What affects the cost of directional boring beneath FM 219 in Carlton?

The main drivers are the Pidcoke ground and shallow bedrock, the FM 219 crossing and pavement, the number of utilities to expose, and any drainage crossing. Pipe size, bore length, pits and excavator time also matter. Carlton’s 303 road miles from Yukon affect mobilization, so the route and scope shape the quote.

Where the Carlton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Carlton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Carlton, Texas

Type the address of your job in Carlton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Carlton

Same county: Evant. All counties: Texas county list.