Streetman Texas Directional Boring: Crockett Soil, Interstate 45, Sloan Creek

Quick Answer: The City of Streetman draws water from groundwater wells, while Oncor Electric Delivery Company and three cooperatives report service in Freestone County, so we confirm line owners before a bore. Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for crossings such as Interstate 45 in Streetman. Our Yukon, Oklahoma main office is 292 road miles away, and the BNSF Railway track is another local crossing to plan around. Crockett soil makes up 69 percent of the mapped area, and clay at depth can cling to the reamer and grip pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Streetman bores at a glance

  • Incorporated city in Freestone County and Navarro County, Texas. Population 271 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 292 miles, about 5.7 hours of driving.
  • Ground: Crockett soil is mapped on 69 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 70 percent of the area.
  • Highways inside the boundary: Interstate 45, FM 80, Texas State Highway 75, FM 416 and Loop 262. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: BNSF Railway, with 6 mapped street and rail crossings.
  • Named streams inside the boundary: Sloan Creek and Elm Creek.
  • Public water: City of Streetman, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Sloan Creek in Streetman?

The City of Streetman operates groundwater wells, and electric service in Freestone County is reported by Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. We confirm the line owner before planning a crossing. The Census Bureau Vintage 2024 estimate puts Streetman at 271 people. We install water, sewer, gas, electric conduit and fiber along streets such as Ross Street and Houston Street or on routes crossing Sloan Creek.

Our main office is in Yukon, Oklahoma, and Streetman work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line on Hubbard Street and 48 inch casing beneath Interstate 45 show the range we handle. We are a family business started in 1965, with directional boring work dating to 1982, including jobs shaped by ground like Streetman’s Crockett soil.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Streetman and Crockett soil?

The USDA soil survey maps Crockett soil series across 69 percent of Streetman, with Wilson at 19 percent and Gasil at 3 percent. Fine sandy loam covers 64 percent of the mapped surface, but the profile changes with depth: at about 40 inches, 92 percent is mapped as clay and the average clay content is 44 percent. Heavy clay is mapped at that depth across 93 percent of the area. These are mapped patterns, not test borings. For a bore, the clay can stick to a reamer and swell around pipe, so we plan fluid and reaming for the deeper material rather than judging by the surface texture alone.

USDA soil survey, inside the Streetman city limitsWhat is mapped
Soil series mappedCrockett 69 percent, Wilson 19 percent and Gasil 3 percent
Texture at the surfacefine sandy loam 64 percent, clay loam 21 percent and loam 10 percent
Texture about 40 inches downclay 92 percent, sandy clay loam 3 percent and clay loam 3 percent
Engineering class about 40 inches downfat clay (CH) 88 percent and lean clay (CL) 11 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inches70 percent of the area (0 percent hard rock, 70 percent weathered rock)
Seasonal water table within 60 inches14 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel95 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across 70 percent of Streetman, with typical bedrock depth at 53 inches; hard bedrock is not mapped at that depth. Seasonal water table is mapped within 60 inches across 14 percent, while flood prone soils cover 4 percent. High steel corrosion risk is mapped across 95 percent, a concern for steel casing and tracer wire that the line owner addresses through material or coating choices. The Cenozoic smectitic clay decomposition residuum includes clay and sand; its swelling clay calls for careful fluid control.

How do we drill through Streetman clay?

Crockett soil gives Streetman a sandy loam surface over clay at about 40 inches. We plan the bore for that change, watching fluid returns and keeping the hole stable without building pressure beneath pavement on Interstate 45.

  1. Crockett soil has clay below its fine sandy loam surface, so we use a thinner drilling mix and polymer, then open the hole in stages to manage sticky cuttings.
  2. Where heavy clay lies along a route near Ross Street, we watch fluid returns closely; excess pressure can lift pavement, so the bore plan controls fluid delivery.
  3. With weathered bedrock mapped within 60 inches in parts of Streetman, we track depth and pitch as the head advances and allow for slower cutting through that material.
  4. Before drilling near a marked utility on Hubbard Street, we expose it with hydrovac; locator paint shows its position, not its depth, so the pothole verifies clearance.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

Which roads, tracks or creeks might a Streetman bore cross near Interstate 45?

Interstate 45 has 10.9 mapped roadway miles inside Streetman, with FM 80, Texas State Highway 75 and FM 416 also within town limits. A highway crossing needs a bore plan that accounts for pavement and the required depth, rather than an open cut through the road. The named streets include Southeast 1240 at 0.91 miles, Ross Street at 0.74 miles and Houston Street at 0.62 miles. Hubbard Street adds another route to check when a service line must pass beneath a street instead of disturbing its surface.

CrossingTypeMapped extentWho has a say
Interstate 45Interstate10.9 roadway miles insideState highway office
FM 80State highway1 roadway miles insideState highway office
Texas State Highway 75State highway0.9 roadway miles insideState highway office
FM 416State highway0.9 roadway miles insideState highway office
Loop 262State highway0.5 roadway miles insideState highway office
Spur 114State highway0.5 roadway miles insideState highway office
FM 246State highway0.1 roadway miles insideState highway office
BNSF RailwayRailroad2.69 track miles insideThe railroad
Sloan CreekStream0.85 channel miles insideChecked for Corps of Engineers jurisdiction
Elm CreekStream0.07 channel miles insideChecked for Corps of Engineers jurisdiction
Mesquite CreekStream nearby0.6 miles outsideChecked for Corps of Engineers jurisdiction
Tehuacana CreekStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 2.69 track miles inside Streetman, and the mapped street and rail crossing count is 6. Sloan Creek runs 0.85 channel miles through town, with Elm Creek at 0.07 miles; 3 mapped street crossings intersect named streams. Mesquite Creek and Tehuacana Creek are also near the limits. A creek route needs depth planning beneath the channel, and the water crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Who approves a Streetman bore under BNSF Railway or a highway?

Streetman is incorporated, so its city streets belong to the city itself; we do not name a city permit or department. Work in the right of way of Interstate 45, FM 80, Texas State Highway 75 or another state road needs a TxDOT utility permit. For an electric or communication line crossing, the cover depth is at least 60 inches below the lowest point of the crossed grade; water crossings also need 60 inches, and pressurized sewer crossings need 60 inches. The utility owner files through TxDOT’s online RULIS system, reviewed by the Bryan District, using our bore plan and profile.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near the City of Streetman system?

The City of Streetman public water system uses groundwater wells and reports 191 service connections serving 573 people. That ownership matters when a new water line or a crossing is planned along Hubbard Street. Electric service reported in the county includes Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative. The provider at a particular address is not established by that county list, so we confirm the line owner before an electric conduit bore.

Line ownerWhat it isSourceSize
City of StreetmanPublic water systemGroundwater wells191 connections, 573 people served
Oncor Electric Delivery Company, Houston County Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric CooperativeElectric utilities reporting service in Freestone County and Navarro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Streetman’s median housing year at 1976: 35 percent of units were built before 1960, 42 percent from 1960 to 1999 and 23 percent in 2000 or later. That mix can mean a route for replacement pipe as well as new service near Ross Street. We hydrovac expose each marked utility on the bore path before drilling near it. For a line planned beneath Hubbard Street, paint shows position, not depth, so potholing verifies the actual crossing.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

Do you cover Kirvin and other areas around Streetman?

Streetman covers 1.4 square miles across Freestone County and Navarro County, at an elevation of 387 feet, and uses ZIP code 75859. Richland is 6.1 miles northwest, Kirvin is 7.9 miles south and Navarro is 8.7 miles north. Corsicana, the nearest larger city, is 15.9 miles northwest; Fairfield, the county seat, is 14.8 miles southeast. Our Yukon, Oklahoma yard is 292 road miles away, a 5.7 hour drive, so distance to a Streetman site is part of planning mobilization for work near Interstate 45 or outside town.

Places near Streetman

What kinds of bores come up around Streetman and Southeast 1240?

  • Highway crossing: A route beneath Interstate 45 keeps the pavement intact and accounts for the required cover and casing.
  • Water service: A new connection near Hubbard Street must be planned around the City of Streetman groundwater system and existing marked lines.
  • Fiber conduit: A route along Southeast 1240 can pass beneath the street surface, with each marked utility exposed before drilling nearby.
  • Creek crossing: A bore beneath Sloan Creek needs a route and depth plan that accounts for the channel and jurisdiction review.
  • Rail crossing: A line beneath BNSF Railway needs a crossing agreement that sets the site conditions for casing, depth and flagging.
  • Street crossing: A bore beneath Ross Street can avoid cutting the roadway while connecting a service route across the street.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Streetman bore near Hubbard Street?

For a quote, send the Streetman address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help. A route beneath Hubbard Street may be straightforward if it avoids other lines, but a map pin lets us check the street, nearby utilities and the planned path before setting the scope.

A short service route on Southeast 1240 with clear access is simpler to plan than a crossing beneath Interstate 45 or BNSF Railway. Length, pipe size, Crockett clay, exposed utilities, pavement, creek crossings, pits, excavator time and backfill all affect the work. Creek or drainage crossings near Sloan Creek need added route planning, and mobilization reflects the 292 road miles from Yukon. Emergency timing or a high profile route can also change crew and equipment needs.

Questions people ask about boring in Streetman

Does Trinity take directional boring work in Streetman and Freestone County, and who staffs it?

Yes. We take directional boring work in Streetman and across Texas, including sites in Freestone County. Our crews handle the work, with support from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including for a route near Interstate 45.

Does Crockett soil in Streetman corrode steel, and what pipe should we use?

The USDA soil survey maps high steel corrosion risk across 95 percent of Streetman, where Crockett soil is common. That is a concern for uncoated steel casing and tracer wire. HDPE does not share the same soil corrosion concern; the line owner chooses materials and any coating for steel on a route such as one beneath Hubbard Street.

What ground will a Crockett soil bore in Streetman pass through?

The USDA soil survey maps Crockett across 69 percent of Streetman, with fine sandy loam common at the surface. At about 40 inches, 92 percent of the mapped area is clay and average clay content is 44 percent. Those patterns are not test borings, but they warn us that a route near Southeast 1240 may encounter sticky, swelling clay at depth.

Is there rock under Streetman, and how much is mapped within five feet?

Weathered bedrock is mapped within 60 inches across 70 percent of Streetman, with typical depth at 53 inches. Hard bedrock is not mapped within that depth. A bore near Sloan Creek may still encounter weathered material, so the drilling plan allows for slower progress and tracking the head through changing ground.

Who approves a Streetman bore beneath Interstate 45?

For work in Interstate 45 right of way, the utility owner applies for the TxDOT utility permit through RULIS, and the TxDOT Bryan District reviews it. We prepare the bore plan and profile and work under the owner’s permit. A crossing route must account for required cover and boring beneath existing highway pavement.

Who owns the Streetman track at BNSF Railway, and what does a bore need?

BNSF Railway owns the 2.69 track miles mapped inside Streetman. A bore beneath the track needs an agreement from BNSF Railway. That agreement sets crossing conditions such as casing, depth and flagging. If the route also occupies highway right of way, TxDOT asks for a copy of the railroad agreement.

Does Trinity serve Richland and rural sites outside Streetman?

Yes. We take work beyond Streetman, including Richland, which is 6.1 miles northwest, and rural sites outside town limits. Each route needs its own scope: a location near Sloan Creek, for example, raises different crossing and access questions from a service line along a street in town.

How much 811 notice does a Streetman bore near Southeast 1240 need?

Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If a bore planned near Southeast 1240 starts more than 14 days after the original notice, submit a new request. Marks that wear off or move must be refreshed through Texas811 before work continues.

What affects the cost of a directional bore under Interstate 45 in Streetman?

The route, length, pipe or conduit size, Crockett clay, utilities to expose, pavement and access all affect the scope. A crossing beneath Interstate 45 or BNSF Railway requires added planning, while Sloan Creek can bring channel considerations. Pits, equipment time, backfill, schedule demands and mobilization from Yukon also shape the job.

Where the Streetman facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Streetman

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Streetman, Texas

Type the address of your job in Streetman. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Streetman

Same county: Teague · Fairfield · Wortham · Oakwood. All counties: Texas county list.