trinityboringsolutions.com

Navarro Texas Directional Boring: Crockett Soil, FM 3243 and BNSF Railway

Quick Answer: Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Navarro, including routes beneath BNSF Railway tracks. Navarro is 282 road miles from our Yukon, Oklahoma main office, and FM 3243 is one local route to plan around. Crockett soil has fine sandy loam at the surface and heavy clay below, which can cling to tooling and grip pipe. For a Grape Creek crossing, the route and ground need to be reviewed before the bore is planned.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Navarro bores at a glance

  • Incorporated city in Navarro County, Texas. Population 244 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 282 miles, about 5.6 hours of driving.
  • Ground: Crockett soil is mapped on 100 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 100 percent of the area.
  • Highways inside the boundary: FM 3243. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Grape Creek in Navarro?

Trinity Boring Solutions takes directional boring work in Navarro, Navarro County, including routes beneath Grape Creek near town. Can we get a line beneath a Navarro road, track, or creek without cutting it? In Navarro, we plan a bore to leave the surface intact. The Census Bureau Vintage 2024 estimate puts the town population at 244. We install water, sewer, gas, electric conduit and fiber lines along routes such as Main Street.

Our main office is in Yukon, Oklahoma, and Navarro work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For proposed routes near FM 3243, our record of no utility strike in over 25 years matters where Oncor Electric Delivery Company and Navarro County Electric Cooperative report county service. For work in Navarro, our family business began in 1965, and we have done directional boring since 1982.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Crockett soil like to bore in Navarro?

Crockett soil is the mapped soil series across Navarro, with fine sandy loam at the surface and clay under about 40 inches. The USDA soil survey maps Crockett fine sandy loam on 55 percent of the area at 0 to 1 percent slopes and 40 percent at 1 to 3 percent slopes. At about 40 inches, the soil is mapped as clay across the area, with an average clay content of 44 percent. That deep, heavy clay can stick to a reamer and tighten around pipe.

USDA soil survey, inside the Navarro city limitsWhat is mapped
Soil series mappedCrockett 100 percent
Texture at the surfacefine sandy loam 100 percent
Texture about 40 inches downclay 100 percent
Engineering class about 40 inches downfat clay (CH) 100 percent
Average clay content about 40 inches down44 percent
Bedrock mapped within 60 inches100 percent of the area (0 percent hard rock, 100 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel100 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches across Navarro, with a typical depth of 53 inches, so a bore may slow as it approaches harder material. No seasonal water table or flood prone soils are mapped. High steel corrosion risk is mapped across the area, a concern for uncoated casing or tracer wire that the line owner should consider. The geologic map includes Smectitic Clay Decomposition Residuum of Cenozoic age; its clay can swell when wet and crack when dry.

What does it take to bore clay in Navarro?

In Navarro, Crockett clay calls for controlled fluid and staged reaming so sticky cuttings do not build up on the tool. We plan the pull around the local soil and the route, whether it follows Main Street or approaches FM 3243.

  1. Crockett soil changes from fine sandy loam to heavy clay below about 40 inches, so we use a thinner fluid mix with polymer and ream in stages.
  2. Because Navarro’s mapped clay is heavy and sticky, we watch fluid returns near pavement and pull the pipe the same day the open hole is made.
  3. The USDA map places weathered bedrock within 60 inches across Navarro, so we track depth and pitch as the bore approaches the harder layer.
  4. For an East 1080 route, we hydrovac pothole marked utilities before drilling close by, then track the drill head from the surface and log its depth and pitch.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What is in the way of a new line near 1080 Road in Navarro?

Navarro has one mapped mile of FM 3243 inside town limits, so a route in its right of way needs state highway planning. Among the longer named streets, 1080 Road runs 1.14 miles in town, Main Street runs 1.12 miles, and SE County Road 1090 runs 1.04 miles. East 1080 adds another 0.97 miles. A bore beneath an existing highway keeps pavement intact, while the precise route and required cover depend on the line and permit.

CrossingTypeMapped extentWho has a say
FM 3243State highway1 roadway miles insideState highway office
BNSF RailwayRailroad1.39 track miles insideThe railroad
Grape CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Crab CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

BNSF Railway owns 1.39 track miles inside Navarro, and public records map 2 street and rail crossings in town. A crossing beneath that track needs an agreement with BNSF Railway before the route is set. Grape Creek is 0.3 miles from the town limits and Crab Creek is 0.5 miles away; neither is mapped inside town. No street crossings of named streams are mapped in town, and no lakes or ponds are mapped within one mile.

Who has to sign off on a bore near FM 3243 in Navarro?

For work in FM 3243 right of way, the utility that owns the line files the TxDOT permit through RULIS, and the TxDOT Dallas District reviews it; we prepare the bore plan and profile for the owner. TxDOT cover rules call for at least 60 inches at a highway crossing for electric and communication lines, 60 inches for water, and 60 inches for pressurized sewer. Along the right of way, electric and communication lines need 48 inches and water needs 36 inches. The district may set other depth in its permit. BNSF Railway must agree to a track crossing, and a planned Grape Creek crossing is checked for Corps jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Navarro County?

The water provider for a specific Navarro address has to be confirmed with the city, Navarro County or the local water district before a bore is planned; available records do not match a provider to the town. Oncor Electric Delivery Company and Navarro County Electric Cooperative report electric service in Navarro County, but the line owner for the address must be confirmed before planning a conduit bore. That check is especially useful on a route along Main Street, where existing lines may affect the path.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company and Navarro County Electric CooperativeElectric utilities reporting service in Navarro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Navarro’s median housing year at 1994; 10 percent of homes were built before 1960, 51 percent from 1960 to 1999, and 39 percent in 2000 or later. A Main Street project could replace older pipe or serve newer construction, so the route needs checking either way. We hydrovac pothole each marked utility on the bore path before drilling near it; paint shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

What is near Navarro, including Angus?

Navarro is an incorporated town in Navarro County at an elevation of 419 feet, covering 0.67 square miles, with ZIP code 75109. Angus is 2.6 miles west, Mustang is 3.0 miles west, and Mildred is 4.6 miles northeast. Richland is 5.8 miles southwest and Retreat is 6.4 miles northwest. Corsicana, the county seat and nearest larger city, is 7.5 miles northwest. Our Yukon, Oklahoma main office is 282 road miles away, a 5.6 hour drive, which affects mobilization for a job near FM 3243.

Places near Navarro

What boring work comes up near Main Street in Navarro?

  • Street crossing: A bore under 1080 Road can keep the street surface intact while connecting a service on either side.
  • Highway crossing: Work beneath FM 3243 uses a bore or tunnel, with the utility owner handling the TxDOT right of way permit.
  • Rail crossing: A route beneath BNSF Railway needs the railroad’s agreement, with crossing details settled before the bore is set.
  • Water or sewer service: A line along Main Street needs the address specific water provider and existing utilities confirmed before drilling.
  • Creek crossing: Grape Creek lies 0.3 miles from Navarro’s limits, so a proposed route there needs channel and jurisdiction review.
  • Fiber or electric conduit: A bore along SE County Road 1090 starts with confirming the line owner and exposing marked utilities on the path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near East 1080 in Navarro?

A map pin for the East 1080 route shows where the bore sits in relation to Navarro’s streets and nearby utilities. Send what will go underground, the pipe or conduit size, and the footage; a sketch or plans can clarify the entry and exit pits. For a route near BNSF Railway, include the crossing location so we can assess the track requirements.

The job scope sets the price, with Navarro’s 282 road miles from Yukon affecting mobilization. Crockett clay, possible weathered bedrock, and the pipe or conduit size can change the drilling plan. Other factors include length, utilities to expose, pavement or concrete, and any creek or drainage crossing. A route under FM 3243 or BNSF Railway also brings specific crossing work, while pits, excavator time, sand backfill, high profile work or emergency response affect the job details.

Questions people ask about boring in Navarro

Does Trinity Boring Solutions take directional boring work in Navarro County, and who staffs it?

Yes, we take directional boring jobs in Navarro County and keep the customer working with Trinity from the first call through the bore log. Our own crews and partner contractor crews support the work, coordinated from the Yukon main office and vetted satellite yards. For a Main Street route, the crew plan follows the specific access and bore scope.

Who owns the Navarro track, and what does a bore under BNSF Railway need?

BNSF Railway owns 1.39 track miles inside Navarro, and a bore beneath that track needs the railroad’s agreement. The agreement establishes the crossing conditions, including casing, depth and flagging. If a proposed route also occupies FM 3243 right of way, TxDOT needs the railroad agreement copy as part of its review.

Can a line be bored under Grape Creek near Navarro?

A line can be planned beneath Grape Creek, which is mapped 0.3 miles from Navarro’s limits, but the route needs site specific review. During planning, the creek crossing is checked for U.S. Army Corps of Engineers jurisdiction. The channel route, entry and exit pits, and nearby utilities shape the bore plan.

Who owns electric lines in Navarro County, and who confirms conduit specifications?

Oncor Electric Delivery Company and Navarro County Electric Cooperative report service in Navarro County, but that does not establish which company serves a particular Main Street address. Confirm the line owner before setting conduit specifications or planning the bore. The owner can verify its requirements for the proposed electric route.

Who is in charge of SE County Road 1090 in Navarro, and does it have to be cut?

Navarro is incorporated, so its city streets belong to the city itself; SE County Road 1090 is one of the named streets within town limits. A directional bore can pass beneath the street without cutting its surface. The exact path still depends on access, marked utilities and the line being installed.

Do older buried lines near Main Street in Navarro mean replacement bores are needed?

They can be a reason to consider a replacement bore, but housing age alone does not establish the age of buried lines. The American Community Survey estimates Navarro’s median housing year at 1994, with 10 percent of homes built before 1960. Along Main Street, the existing line must be located and exposed before the drill approaches it.

What bore sizes and lengths can Trinity handle for a job near East 1080 in Navarro?

For planned Navarro crossings, we handle lines from 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet. For an East 1080 job, the planned line size, footage and route determine the equipment and bore setup. A sketch or plans help show the entry and exit locations.

How early should I call 811 for a Navarro bore along 1080 Road, and what if marks move?

For a bore along 1080 Road, submit the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. Texas811 describes this as at least two working days. If the start slips more than 14 days past the original notice, make a new request; refresh worn or moved marks through Texas811 before work continues.

What affects directional boring costs near FM 3243 in Navarro?

The job scope determines the cost, not the highway name alone. Factors include bore length, pipe or conduit size, Crockett clay or weathered bedrock, utilities that must be exposed, pavement, pits and equipment time. Work in FM 3243 right of way and mobilization from the Yukon office, 282 road miles away, also affect planning and price.

Where the Navarro facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Navarro

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Navarro, Texas

Type the address of your job in Navarro. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Navarro

Same county: Kerens · Rice · Blooming Grove · Dawson · Frost · Oak Valley · Eureka · Barry · Emhouse · Goodlow · Powell. All counties: Texas county list.