trinityboringsolutions.com

Richland Texas Directional Boring: Crockett Soil, Interstate 45 and Little Pin Oak Creek

Quick Answer: Interstate 45 is a major route to get beneath in Richland, and Trinity Boring Solutions performs directional boring, also called horizontal directional drilling (HDD), for Texas projects. The Yukon, Oklahoma main office is 286 road miles away, so a bore near FM 1394 needs mobilization planned around its access and crossing scope. Crockett soil covers 41 percent of mapped town area. Clay at about 40 inches can stick to the reamer and grip the pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Richland bores at a glance

  • Incorporated city in Navarro County, Texas. Population 273 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 286 miles, about 5.6 hours of driving.
  • Ground: Crockett soil is mapped on 41 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 45 percent of the area.
  • Highways inside the boundary: Interstate 45, Texas State Highway 14 and FM 1394. State permit office: TxDOT Dallas District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Little Pin Oak Creek, Mesquite Creek, Richland Creek and Cedar Creek.
  • Public water: City of Richland, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who handles directional boring near FM 1394 in Richland?

Trinity Boring Solutions takes directional boring work in Richland, Navarro County, including routes near FM 1394 and Interstate 45. The Census Bureau Vintage 2024 estimate puts the town population at 273. Our crews install water, sewer, gas, electric conduit and fiber for runs along streets such as Main Street or connections that need to pass beneath a Richland road.

Our main office is in Yukon, Oklahoma, and Richland work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965 and has drilled directionally since 1982; for a utility run along Main Street, we handle 3/4 inch service lines through 48 inch casing and bore lengths from 10 feet to 5,000 feet.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What ground should a Richland bore expect in Crockett soil?

Richland is mapped mainly as Crockett soil, which shapes how a bore holds open and how the reamer behaves. The USDA soil survey maps Crockett across 41 percent of town area, including Crockett fine sandy loam map units. At about 40 inches below the surface, clay makes up 89 percent of mapped texture, and the average clay content there is 45 percent. Surface texture is split among fine sandy loam at 37 percent, clay loam at 33 percent and clay at 21 percent. We treat Richland’s mapped patterns as planning context, not test borings, before choosing a bore path. The clay can cling to tooling and grip the pipe.

USDA soil survey, inside the Richland city limitsWhat is mapped
Soil series mappedCrockett 41 percent, Wilson 22 percent, Gowen 9 percent, Heiden 6 percent and Burleson 5 percent
Texture at the surfacefine sandy loam 37 percent, clay loam 33 percent and clay 21 percent
Texture about 40 inches downclay 89 percent and clay loam 10 percent
Engineering class about 40 inches downfat clay (CH) 82 percent and lean clay (CL) 17 percent
Average clay content about 40 inches down45 percent
Bedrock mapped within 60 inches45 percent of the area (0 percent hard rock, 45 percent weathered rock)
Seasonal water table within 60 inches9 percent of the area
Flood prone soils13 percent of the area
High corrosion risk for uncoated steel89 percent of the area

Weathered bedrock is mapped within 60 inches across 45 percent of Richland, with typical bedrock depth at 53 inches, so the bore plan should allow for changing ground. Seasonal water table is mapped within 60 inches across 9 percent, while flood prone soils cover 13 percent; creek approaches may need depth planning and water checks at the pits. High steel corrosion risk is mapped across 89 percent, a concern for steel casing and tracer wire that the line owner should address. The Cenozoic Smectitic Clay Decomposition Residuum includes clay and sand, and its smectitic clay expands wet and shrinks dry.

What do we need to bore Richland clay?

In Richland, we manage Crockett clay with controlled fluid and staged reaming, then pull the line while the hole is ready. Little Pin Oak Creek and the mapped wet ground also shape route and pit planning.

  1. Along Main Street, we expose each marked utility on the bore path with hydrovac before drilling near it; locator paint shows position, not depth.
  2. Crockett clay can be sticky and swell around pipe, so we use thinner fluid with polymer and watch returns to keep pressure from lifting pavement.
  3. Where Richland’s heavy clay balls up on the reamer, we open the hole in stages and pull the pipe the same day the final hole is made.
  4. At a Little Pin Oak Creek approach, we track the drill head from the surface with a walkover locator, log depth and pitch, and place pits in the dirt on each side.
Rod box on the Vermeer D24x40 S3 Navigator with the bore path heading toward the trees on a rock bore in Guthrie, OK
Rod box on our Vermeer D24x40 with the bore path heading toward the trees on a rock bore in Guthrie, Oklahoma.

Where might a Richland line pass under Interstate 45?

Richland bores may need to pass beneath Interstate 45, Texas State Highway 14 or FM 1394, all mapped inside town limits. The mapped roadway lengths are 8.7 miles for Interstate 45, 8.8 miles for Texas State Highway 14 and 4.2 miles for FM 1394. Main Street runs 1.48 miles in town, Memorial Drive 0.86 miles and Lamar Street 0.78 miles. Those routes help define the approach and pit locations. Under existing highway pavement, the crossing is bored or tunneled rather than open cut; rural highway bores extend beneath all travel lanes.

CrossingTypeMapped extentWho has a say
Interstate 45Interstate8.7 roadway miles insideState highway office
Texas State Highway 14State highway8.8 roadway miles insideState highway office
FM 1394State highway4.2 roadway miles insideState highway office
Union PacificRailroad0.88 track miles insideThe railroad
private or unidentified track (line shown as out of service)Railroad nearby0 miles outsideThe railroad
Little Pin Oak CreekStream1.34 channel miles insideChecked for Corps of Engineers jurisdiction
Mesquite CreekStream0.06 channel miles insideChecked for Corps of Engineers jurisdiction
Richland CreekStream0.04 channel miles insideChecked for Corps of Engineers jurisdiction
Cedar CreekStream0.03 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track in Richland totals 0.88 miles and belongs to the Ennis Subdivision; three street and rail crossings are mapped in town. Little Pin Oak Creek runs 1.34 channel miles, with Mesquite Creek, Richland Creek and Cedar Creek also present. Seven mapped street crossings cross named streams in town. A route near a creek needs a channel crossing plan, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. A bore can keep the road, track or creek bank uncut while pits sit in the ground on each side.

Who approves a Richland bore near Union Pacific track?

For Interstate 45, Texas State Highway 14 and FM 1394, TxDOT handles utility permits for work in state right of way, with the Dallas District reviewing Richland applications. The utility owner files through TxDOT’s online RULIS system; we prepare the bore plan and profile and work under the owner’s permit. Richland is incorporated, so its city streets, including Main Street, belong to the city. A crossing of Union Pacific track needs an agreement from the railroad, which sets crossing conditions such as casing, depth and flagging. TxDOT asks for a copy when a line also occupies highway right of way. Little Pin Oak Creek crossings are checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities may have lines in Richland, Navarro County?

The City of Richland public water system uses purchased surface water and reports 340 service connections serving a population of 1,020. Around Main Street, the water system is one line owner to account for before choosing a bore path. Oncor Electric Delivery Company and Navarro County Electric Cooperative report electric service in the county; the owner for a specific Richland address is confirmed before planning a conduit bore.

Line ownerWhat it isSourceSize
City of RichlandPublic water systemSurface water bought from another system340 connections, 1,020 people served
Oncor Electric Delivery Company and Navarro County Electric CooperativeElectric utilities reporting service in Navarro CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use the American Community Survey 2019 to 2023 five year estimate of Richland’s 1967 median housing year as context for underground planning. We consider the survey’s 36 percent of homes built before 1960, 53 percent from 1960 to 1999 and 11 percent in 2000 or later when planning underground work. That mix can mean replacement work beside newer service connections, but it does not establish the age of any buried line. On a Main Street route, hydrovac potholing exposes marked utilities before the drill approaches; paint shows position, not depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

What is near Richland and Navarro?

Richland is in Navarro County at an elevation of 358 feet, with 2.41 square miles inside its town limits. The listed ZIP codes are 76681, 75859, 76693 and 75109. Angus is 5.2 miles north and Navarro is 5.8 miles northeast; Streetman is 6.1 miles southeast. Corsicana, the county seat and nearest larger city, is 11.2 miles north. From the Yukon, Oklahoma yard, Richland is 286 road miles and a 5.6 hour drive, so distance is part of planning a job near FM 1394 or Little Pin Oak Creek.

Places near Richland

What would we bore near Little Pin Oak Creek in Richland?

  • Highway crossing: A bore beneath Interstate 45 keeps the travel lanes intact, with the route and bore depth set for the crossing plan.
  • Street service: A water or sewer run along Main Street can pass beneath pavement, with pits placed in dirt beside the route.
  • Creek crossing: A line beneath Little Pin Oak Creek needs a planned channel depth and a check for federal jurisdiction during planning.
  • Rail crossing: A route beneath Union Pacific track needs the railroad’s agreement to set crossing details for casing, depth and flagging.
  • Electric conduit: Near FM 1394, we confirm the line owner and expose marked utilities before drilling close to the conduit route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a Richland bore near Lamar Street?

A map pin near Lamar Street matters because the exact route can change which streets, utilities or creek approaches a Richland bore must cross. For a Richland bore, we need the address or pin, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route and choose the right equipment and crew.

Price follows the scope, starting with the 286 road miles from Yukon and the mobilization that distance requires. Crockett clay and possible weathered bedrock affect drilling time; pipe size and bore length affect equipment and reaming. A route beneath Interstate 45 or Union Pacific track brings crossing details into the plan, while a Little Pin Oak Creek approach, pavement, exposed utilities, pits, excavator time, sand backfill or emergency scheduling can add work. We review those parts together before quoting.

Questions people ask about boring in Richland

Does Trinity take directional boring work in Richland, Navarro County, and how is it staffed?

Yes. Trinity takes directional boring work in Richland, Navarro County, using our own crews and partner drilling contractors vetted by Trinity. The Yukon main office stays involved from the first call through the bore log, whether the route is near FM 1394 or another town street.

Can a line be bored under Little Pin Oak Creek in Richland?

A bore can be planned beneath Little Pin Oak Creek, which runs 1.34 channel miles within Richland. The route needs a channel depth plan, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The final path depends on the site and line requirements.

Who owns Richland’s public water system, and does it use purchased surface water?

We account for Richland’s public water system, owned by the City of Richland and using purchased surface water, when planning underground work. Public records list 340 service connections and a population served of 1,020. For a bore near Main Street, we account for water lines in the route and expose marked utilities before drilling near them.

Which electric utilities report service in Richland, Navarro County, and who confirms conduit details?

Oncor Electric Delivery Company and Navarro County Electric Cooperative report electric service in the county, but that does not identify the provider at every Richland address. The line owner is confirmed before planning a conduit bore near FM 1394, and that owner can confirm the conduit specifications for its line.

Are Richland streets such as Memorial Drive cut for a bore?

Richland is incorporated, so Memorial Drive is a city street. Directional boring can pass beneath pavement without cutting across the street, with entry and exit pits in the dirt on each side. The route still has to account for marked utilities and access along Memorial Drive.

How old are Richland homes and buried lines near Main Street?

Richland’s median housing year is 1967, according to the American Community Survey 2019 to 2023 five year estimates. The survey puts 36 percent of homes before 1960, 53 percent from 1960 to 1999 and 11 percent from 2000 or later. Those ages do not date buried lines, so a Main Street replacement bore needs potholing to verify marked utilities.

Does Trinity cover Angus and rural sites outside Richland?

Yes. Trinity takes work across Texas, including jobs in Angus and rural sites outside Richland town limits. Angus is 5.2 miles north of Richland, and the exact address helps us plan access, the route and mobilization from the Yukon main office.

How much notice does Texas811 need for a Richland bore near FM 1394, and what if marks move?

For a bore near FM 1394, Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as at least two working days. Request it no earlier than 14 days before work. If the Richland start slips more than 14 days past the original notice, we make a new request. On Richland jobs, we have worn or moved marks refreshed through Texas811 before we continue work.

What affects the cost of a directional bore in Richland near Interstate 45?

The job scope sets the price: mobilization from the Yukon office 286 road miles away, bore length and line size, Crockett clay or weathered bedrock, and crossings all matter. A route beneath Interstate 45 may involve pavement and highway planning; creek or rail crossings, exposed utilities, pits, equipment time and emergency work also affect the job.

Where the Richland facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Richland

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Richland, Texas

Type the address of your job in Richland. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Richland

Same county: Kerens · Rice · Blooming Grove · Dawson · Frost · Mildred · Retreat · Eureka · Barry · Emhouse · Goodlow · Powell. All counties: Texas county list.