trinityboringsolutions.com

Nixon Texas Directional Boring: Luling Clay, US 87 and Willow Creek

Quick Answer: US 87 is a key route for utility crossings in Nixon, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), here in Texas. The 474 road miles from our Yukon, Oklahoma main office matter for a bore near Willow Creek when we plan mobilization. Luling clay is common in Nixon and can grip the pipe or build up on the reamer. We adjust fluid and ream in stages to manage that ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Nixon bores at a glance

  • Incorporated city in Gonzales County and Wilson County, Texas. Population 2,389 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 474 miles, about 9 hours of driving.
  • Ground: Luling soil is mapped on 59 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 17 percent of the area.
  • Highways inside the boundary: US 87, Texas State Highway 97, Texas State Highway 80 and FM 1681. State permit office: TxDOT Yoakum District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Willow Creek and Clear Fork.
  • Public water: City of Nixon, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring under US 87 in Nixon?

We take directional boring work in Nixon, Gonzales County, where the Census Bureau Vintage 2024 estimate puts the population at 2,389. Along US 87 or a named street, our crews can install water, sewer, gas, electric conduit and fiber. The route and line size shape the bore plan, so we check the path before choosing equipment.

Our main office is in Yukon, Oklahoma, and Nixon work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have drilled directionally since 1982. The range from 3/4 inch service lines to 48 inch casing fits work from a Central Avenue service run to a larger US 87 crossing.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Nixon’s Luling soil bring to a bore?

The USDA soil survey maps Luling soil across 59 percent of Nixon, with Luling clay map units covering 39 percent and another 15 percent mapped as Luling clay on gentle slopes. Clay makes up 61 percent of surface texture. About 40 inches down, clay is mapped across 95 percent of the area, and average clay content at that depth is 45 percent. Luling, Benchley, Normangee, and Rosanky soils map patterns, not test borings, so we verify ground conditions before planning Nixon work. The sticky material can cling to a reamer and grip pipe, so the bore needs controlled fluid and staged reaming.

USDA soil survey, inside the Nixon city limitsWhat is mapped
Soil series mappedLuling 59 percent, Benchley 17 percent, Normangee 11 percent, Rosanky 3 percent and Tabor 3 percent
Texture at the surfaceclay 61 percent, clay loam 17 percent and sandy clay loam 11 percent
Texture about 40 inches downclay 95 percent and clay loam 3 percent
Engineering class about 40 inches downfat clay (CH) 95 percent and lean clay (CL) 5 percent
Average clay content about 40 inches down45 percent
Bedrock mapped within 60 inches17 percent of the area (0 percent hard rock, 17 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel95 percent of the area

The soil survey maps weathered bedrock within 60 inches in 17 percent of Nixon; typical bedrock depth is 54 inches. Seasonal water tables are not mapped within 60 inches, and flood prone soils cover 2 percent. High steel corrosion risk is mapped across 95 percent, so the line owner should consider casing and tracer wire materials; HDPE does not have the same steel concern. The Cook Mountain Formation, of Bartonian age, includes claystone, sandstone, siltstone, lignite and marlstone. That mix calls for watching the cut and the returns as the bore advances.

How do we bore Nixon’s clay?

Nixon’s mapped clay can hold an open hole but may swell and stick to the pipe. We plan the bore around Luling clay, watch returns near pavement and have the product ready before opening the final ream.

  1. In Nixon’s heavy clay, we use a thinner drilling fluid with polymer and open the hole in stages so sticky cuttings do not load the reamer.
  2. Where a route passes beneath US 87 pavement, we watch fluid returns closely and manage pressure to reduce the risk of lifting the surface.
  3. Before drilling near a marked utility on Central Avenue, we hydrovac expose it; paint shows its route, not its depth.
  4. We track the drill head from the surface and log depth and pitch as it advances toward a Willow Creek crossing.
Trinity Boring Solutions water trailer supplying water for bentonite drilling fluid on a sleeve bore in northeast OKC
Our water trailer feeding the bentonite drilling fluid mix on a sleeve bore in northeast Oklahoma City.

Where might a Nixon line go under 2nd Street?

US 87, Texas State Highway 97, Texas State Highway 80 and FM 1681 run inside Nixon. A utility crossing beneath existing highway pavement is bored or tunneled rather than cut open. TxDOT rules also call for the bore to extend beneath all travel lanes on rural highways. For local routes, 2nd Street is mapped for 1.32 miles, Central Avenue for 1.23 miles and 3rd Street for 1.11 miles within the city. Their pavement and driveways can stay intact while the pits sit off the travel surface.

CrossingTypeMapped extentWho has a say
US 87US highway2.4 roadway miles insideState highway office
Texas State Highway 97State highway3 roadway miles insideState highway office
Texas State Highway 80State highway2.3 roadway miles insideState highway office
FM 1681State highway0.4 roadway miles insideState highway office
Willow CreekStream0.23 channel miles insideChecked for Corps of Engineers jurisdiction
Clear ForkStream0.13 channel miles insideChecked for Corps of Engineers jurisdiction
Tally BranchStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Nixon or within 1 mile outside the limits, so there is no local track route to plan around. Willow Creek runs 0.23 channel miles in the city and Clear Fork 0.13; Tally Branch is 0.9 miles from the limits. One mapped street crosses a named stream. We plan a creek bore to stay below the channel, and check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. Our route review around Willow Creek accounts for no mapped lakes or ponds within 1 mile in Nixon.

Who approves a Nixon bore in Gonzales County?

Nixon is incorporated, so its city streets, including Central Avenue, belong to the city. For work in the right of way of US 87, Texas State Highway 97, Texas State Highway 80 or FM 1681, TxDOT utility permitting applies. The utility owner files through RULIS, and the TxDOT Yoakum District reviews the application; we prepare the bore plan and profile for that filing. At a highway crossing, electric and communication lines need 60 inches of cover below the lowest crossed grade, and water and pressurized sewer lines need 60 inches. Willow Creek crossings are checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Nixon system?

The City of Nixon public water system draws from groundwater wells and reports 960 service connections serving 2,378 people. That network matters when a new water service or a crossing is planned near a city line. Utilities reporting electric service in Gonzales County include AEP Texas Central, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and Guadalupe Valley Electric Cooperative. We confirm the line owner for the specific address before planning an electric conduit bore, rather than assuming which provider serves a Central Avenue property.

Line ownerWhat it isSourceSize
City of NixonPublic water systemGroundwater wells960 connections, 2,378 people served
AEP Texas Central, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and Guadalupe Valley Electric CooperativeElectric utilities reporting service in Gonzales County and Wilson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Nixon’s median housing year at 1976; 28 percent of homes were built before 1960 and 11 percent in 2000 or later. On an older street such as 2nd Street, a replacement bore may meet buried services of different ages and locations. We use hydrovac potholing to expose marked utilities on the path before drilling near them, since locate paint shows position but not depth.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

What is near Nixon, including Stockdale?

Nixon lies mainly in Gonzales County, with 15 percent of the city in Wilson County. It covers 1.56 square miles at an elevation of 390 feet, and ZIP code 78140 serves the city. Smiley is 7.7 miles east, while Stockdale is 12.2 miles west. La Vernia is 22.4 miles west, and Seguin, the nearest larger city, is 25.3 miles northwest. Gonzales, the county seat, is 25.5 miles northeast. The Yukon yard is 474 road miles away, a 9.0 hour drive, which affects mobilization for Nixon work.

Places near Nixon

What would we bore near Central Avenue in Nixon?

  • Highway crossing: A bore beneath US 87 keeps the utility route below the pavement, with the plan shaped by TxDOT cover requirements.
  • Water service: A new service near the City of Nixon system needs a route checked against existing groundwater well connections.
  • Fiber route: A run along Central Avenue can stay below the street surface instead of opening a trench through pavement.
  • Creek crossing: A line beneath Willow Creek needs a path planned below the channel and a jurisdiction check during planning.
  • Street replacement: A sewer or water replacement near 2nd Street can use a bore to avoid cutting across the street.
  • Electric conduit: A conduit route near 3rd Street starts with confirming which Gonzales County reporting utility owns the line.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Nixon bore near Roosevelt Avenue?

Send a map pin for the exact spot near Roosevelt Avenue or Willow Creek. The location matters because a route approaching US 87 or a creek changes the path and access plan. For work along 2nd Street, we specify the installed pipe or conduit, its size, and footage before planning the bore. A sketch or plans help us see nearby crossings before we build the bore scope.

The 474 road miles from Yukon affect mobilization for Nixon work. We also account for Luling clay, pipe or conduit size, bore length, utilities to expose and pavement or concrete on the route. A crossing of US 87 or Willow Creek adds planning and site conditions to review. Pit space, excavator time, sand backfill and emergency timing can also change the scope. The map pin helps us identify which of those details applies.

Questions people ask about boring in Nixon

Does Trinity take directional boring jobs in Nixon and Gonzales County?

Yes. We take directional boring work in Nixon, and our own crews or crews from vetted partner contractors can staff the job. Our main office is in Yukon, Oklahoma, so a job near US 87 is planned and coordinated from there. We coordinate with you from the first call through the bore log for crossings near US 87 in Nixon.

Which electric company owns lines in Nixon, Gonzales County, and who confirms conduit specs?

Several utilities report electric service in Gonzales County: AEP Texas Central, Bluebonnet Electric Cooperative, Fayette Electric Cooperative and Guadalupe Valley Electric Cooperative. A location on Central Avenue does not identify the provider at every Nixon address, so we verify the specific work location. We confirm the specific line owner before planning conduit near Central Avenue and check the conduit requirements with that owner.

Who controls 3rd Street in Nixon, and can we bore without cutting it?

Nixon is incorporated, so 3rd Street is a city street. A directional bore can pass beneath its pavement with pits placed in the dirt on either side, avoiding an open cut across the street. We first check the route and expose marked utilities near the bore path.

What does Nixon housing age near Central Avenue mean for a replacement bore?

The American Community Survey 2019 to 2023 estimates give Nixon a median housing year of 1976, with 28 percent of homes built before 1960. A replacement line near Central Avenue may meet buried services of different ages, so we expose marked utilities before drilling close to them.

Does Luling soil in Nixon corrode steel, and what pipe can be used?

The USDA soil survey maps high steel corrosion risk across 95 percent of Nixon. The line owner should consider materials for steel casing and tracer wire; HDPE is not subject to that steel corrosion concern. We can plan the bore around the selected material near Luling clay areas.

What ground does a bore pass through in Nixon’s Luling soil?

Luling is the leading mapped soil series in Nixon, covering 59 percent of the area. At about 40 inches below the surface, the survey maps clay across 95 percent of the city, with average clay content of 45 percent. That sticky ground can cling to the reamer, so we stage the reaming and manage drilling fluid.

Can I reach Trinity after hours about an urgent bore near 3rd Street in Nixon?

Yes. Whether your Nixon project is in Gonzales County, we answer Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent bore near 3rd Street, call with the location and what line needs to go in so we can understand the immediate scope and response needed.

How much notice does Texas811 need for a Nixon bore near 2nd Street?

The locate request for a bore near 2nd Street must be made at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For a TxDOT Yoakum District notice, if our start moves more than 14 days past the original notice, we submit a new request. Before work continues near Texas State Highway 97, we have worn or moved marks refreshed through Texas811.

What affects the cost of directional boring under US 87 in Nixon?

The price depends on the job details, including bore length, pipe or conduit size, soil, utilities to expose, pavement, pits and equipment time. Luling clay can affect drilling pace, and a US 87 crossing adds route and cover planning. The 474 road miles from Yukon also affect mobilization; we review the scope before pricing.

Where the Nixon facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Nixon

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Nixon, Texas

Type the address of your job in Nixon. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Nixon

Same county: Gonzales · Waelder. All counties: Texas county list.