Seguin Texas Directional Boring: Branyon Clay, Union Pacific, Geronimo Creek
Quick Answer: Seguin is an incorporated city and Guadalupe County seat, so Court Street is a city street; our directional boring, also called horizontal directional drilling (HDD), can route beneath Interstate 10. The Yukon, Oklahoma main office is 461 road miles away, with Seguin’s Union Pacific tracks among the local crossing conditions to plan around. Branyon soil covers 34% of the city, and its heavy clay can cling to tooling and pipe. We plan the bore path and drilling fluid for that ground.
Seguin bores at a glance
- County seat of Guadalupe County, Texas. Population 38,789 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 461 miles, about 8.6 hours of driving.
- Ground: Branyon soil is mapped on 34 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 11 percent of the area.
- Highways inside the boundary: Interstate 10, US 90, US 90 Alternate, Texas State Highway 123 and Texas State Highway 130. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: Union Pacific, with 14 mapped street and rail crossings.
- Named streams inside the boundary: Geronimo Creek, Guadalupe River, Walnut Branch and Mill Creek.
- Public water: City of Seguin, surface water.
- Electric: City of Seguin municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring near Interstate 10 in Seguin?
Seguin is a city in Guadalupe County with a Census Bureau Vintage 2024 estimate of 38,789 people. We take directional boring work across Texas, including routes along Austin Street or beneath Interstate 10. We install water, sewer, gas, electric conduit and fiber lines, with the route and crossing plan set for the specific site.
Our main office is in Yukon, Oklahoma, and Seguin work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet under the Arkansas River in Tulsa, Oklahoma. A proposed Seguin bore near Union Pacific track calls for a site specific plan, not a copy of that river crossing.

What does Branyon soil mean for drilling in Seguin?
The USDA soil survey maps Branyon as the leading soil series in Seguin, covering 34% of the city. Branyon clay, 0 to 1 percent slopes, accounts for 29% of mapped area, and another 5% is Branyon clay, 1 to 3 percent slopes. At about 40 inches below the surface, clay is mapped across 57% and silty clay across 25%; the average clay content there is 47%. Those mapped patterns point to sticky cuttings that can ball on a reamer and grip pipe.
| USDA soil survey, inside the Seguin city limits | What is mapped |
|---|---|
| Soil series mapped | Branyon 34 percent, Barbarosa 23 percent, Crockett 12 percent, Queeny 6 percent and Lewisville 4 percent |
| Texture at the surface | clay 40 percent, silty clay 27 percent and loam 13 percent |
| Texture about 40 inches down | clay 57 percent, silty clay 25 percent and variable 6 percent |
| Engineering class about 40 inches down | fat clay (CH) 79 percent and lean clay (CL) 14 percent |
| Average clay content about 40 inches down | 47 percent |
| Bedrock mapped within 60 inches | 11 percent of the area (0 percent hard rock, 11 percent weathered rock) |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 7 percent of the area |
| High corrosion risk for uncoated steel | 84 percent of the area |
USDA mapping places weathered bedrock within 60 inches in 11% of Seguin, while hard bedrock is not mapped within that depth. A seasonal water table within 60 inches is mapped in 2%, and flood prone soils in 7%, so a route near Geronimo Creek needs attention to channel depth and wet ground. High steel corrosion risk covers 84%, a concern for uncoated casing or tracer wire that the line owner should address. The Leona Formation is Cenozoic alluvium of gravel, sand, silt and clay; Paleocene sedimentary units are also mapped.
How do we drill Seguin clay without lifting pavement?
Branyon clay makes cuttings sticky and can tighten around pipe. Along Seguin streets, we adjust fluid and reaming to the ground, then track the drill head and expose marked utilities before approaching them.
- Branyon clay can ball on the reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe the same day.
- With heavy clay mapped under Seguin, we watch fluid returns near pavement and keep pressure controlled to avoid lifting a street or slab.
- Before a route near Austin Street reaches a marked utility, we hydrovac pothole to see its depth; paint alone gives its surface position.
- We use a walkover locator to follow the drill head and log depth and pitch as a bore approaches Geronimo Creek or a road crossing.

Where might a Seguin bore pass under Union Pacific tracks?
Interstate 10, US 90 and Texas State Highway 123 are among the major routes inside Seguin; FM 78 and FM 725 are also mapped in the city. A highway crossing needs room beneath the pavement and travel lanes, while a route along the right of way has different cover requirements. Court Street, Guadalupe Street and Kingsbury Street are long named local routes where access and existing utilities shape the bore path. Boring keeps the pavement and driveways intact, with work pits placed off the traveled surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 10 | Interstate | 28.5 roadway miles inside | State highway office |
| US 90 | US highway | 17.9 roadway miles inside | State highway office |
| US 90 Alternate | US highway | 4.7 roadway miles inside | State highway office |
| Texas State Highway 123 | State highway | 13.2 roadway miles inside | State highway office |
| Texas State Highway 130 | State highway | 10.4 roadway miles inside | State highway office |
| Texas State Highway 46 | State highway | 9.4 roadway miles inside | State highway office |
| Texas State Highway 123 Business | State highway | 6.7 roadway miles inside | State highway office |
| FM 78 | State highway | 3.9 roadway miles inside | State highway office |
| FM 725 | State highway | 3.6 roadway miles inside | State highway office |
| Texas State Highway 123 Bypass | State highway | 2.4 roadway miles inside | State highway office |
| FM 20 | State highway | 1.6 roadway miles inside | State highway office |
| FM 464 | State highway | 1.5 roadway miles inside | State highway office |
| FM 1620 | State highway | 1.4 roadway miles inside | State highway office |
| FM 467 | State highway | 1.2 roadway miles inside | State highway office |
Union Pacific has 8.2 track miles inside Seguin on its Glidden Subdivision, and the city has 14 mapped street and rail crossings. Any proposed route intersecting those tracks needs the railroad owner’s crossing agreement, which governs casing, depth and flagging. Geronimo Creek runs 5.95 channel miles in the city, and the Guadalupe River runs 5.71; 41 street crossings of named streams are mapped. Creek routes need channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
Who permits a Seguin bore in Guadalupe County?
Court Street and other city streets are under the City of Seguin, while work in the right of way of Interstate 10, US 90, Texas State Highway 123 or an FM road needs a TxDOT utility permit. The TxDOT San Antonio District reviews those state road applications. The utility owner files through TxDOT’s RULIS system; we prepare the bore plan and profile and work under the owner’s permit. If a route crosses Union Pacific track, the railroad’s agreement sets its crossing conditions. Geronimo Creek or Guadalupe River routes are checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried near City of Seguin water mains?
The City of Seguin public water system uses surface water and reports 10,912 service connections serving 32,736 people. A proposed tie in near Guadalupe Street still needs a route check against existing water lines. Seguin owns its municipal electric system, so we plan boring around that city owned infrastructure. We confirm the line owner and its conduit specifications for the particular Austin Street address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Seguin | Public water system | Surface water | 10,912 connections, 32,736 people served |
| City of Seguin municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 9,104 customers reported |
| AEP Texas Central, City of New Braunfels, City of San Antonio, City of Seguin, Bluebonnet Electric Cooperative, Guadalupe Valley Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Guadalupe County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Seguin’s median housing year at 1984: 22% of homes were built before 1960, 45% from 1960 to 1999 and 33% in 2000 or later. A replacement bore near Kingsbury Street may encounter older buried services alongside newer connections. We hydrovac pothole marked utilities on the route before drilling near them, since surface marks show position but not depth.

Where is Seguin in relation to Geronimo and New Braunfels?
Seguin is the county seat of Guadalupe County, covering 40.03 square miles at an elevation of 559 feet. Its ZIP code is 78155. McQueeney is 4.8 miles west, Geronimo is 5.7 miles north, Lake Dunlap is 8.5 miles northwest, Kingsbury is 9.9 miles northeast and Marion is 10.5 miles west. New Braunfels is the nearest larger city, 11.6 miles northwest. The Yukon yard is 461 road miles away, an 8.6 hour drive, which is part of planning mobilization for a Seguin job.
Places near Seguin
- Directional boring in McQueeney: 4.8 miles west
- Directional boring in Geronimo: 5.7 miles north
- Directional boring in Lake Dunlap: 8.5 miles northwest
- Directional boring in Kingsbury: 9.9 miles northeast
- Directional boring in Marion: 10.5 miles west
- Directional boring in New Braunfels: 11.6 miles northwest
What kinds of bores come up near Geronimo Creek in Seguin?
- Highway crossing: A route beneath Interstate 10 is planned for the required cover and the pavement crossing, rather than an open cut through the road.
- Water service: A connection near the City of Seguin system needs a route checked against existing mains and nearby services.
- Fiber route: A conduit bore along Austin Street can keep the street surface intact while pits stay off the paved route.
- Creek crossing: A proposed line beneath Geronimo Creek needs depth planning and a jurisdiction check during the crossing review.
- Rail crossing: A route meeting Union Pacific track needs the owner’s agreement for casing, depth and flagging.
- Street replacement: A replacement line near Kingsbury Street can be bored past marked services after they are exposed by hydrovac.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a directional boring quote for Court Street in Seguin?
Start with the address or map pin, such as a proposed route on Court Street. Tell us what will go underground, such as water or fiber, then give the pipe or conduit size and the footage. A sketch or plans showing a crossing of Interstate 10 or Geronimo Creek helps us understand the route before we prepare the scope.
Branyon clay is the first pricing consideration because sticky cuttings can call for staged reaming and careful fluid control. Length and pipe size set the basic scale; marked utilities to expose, pavement, creek crossings and pit or excavator needs add work. A Union Pacific crossing brings its own planning conditions. Seguin’s 461 road miles from Yukon also affect mobilization, while emergency timing or a high profile route changes the work plan.
Questions people ask about boring in Seguin
Does Trinity Boring Solutions take directional boring jobs in Guadalupe County near Seguin, and who staffs them?
Yes. We take work in Seguin and across Texas. Our own crews and crews from satellite yards operated by drilling contractors we have vetted can staff the work. You work with Trinity from the initial call through the bore log, whether the route is near Guadalupe Street or another part of Guadalupe County.
Can a line be bored under Geronimo Creek in Seguin?
A bore can be planned for a Geronimo Creek crossing, subject to the route, ground and access. We plan depth to stay beneath the channel and check the crossing for U.S. Army Corps of Engineers jurisdiction. The Guadalupe River is another named waterway in Seguin where those planning checks apply.
Who owns Seguin’s public water system, and does it use surface water as we plan boring nearby?
The City of Seguin owns the public water system and uses surface water, so we plan boring with that source in mind. It reports 10,912 service connections and serves 32,736 people. A proposed connection near Court Street still needs a route review to identify existing mains and services.
Who owns electric lines in Guadalupe County near Seguin, and who confirms conduit specifications?
The City of Seguin owns its municipal electric system. For a conduit bore near Kingsbury Street, we confirm the line owner for that address and its conduit specifications before planning the route. The system’s reported customer count does not identify which lines serve a particular property.
Does Seguin control Guadalupe Street, and can we bore without cutting it?
Guadalupe Street is a city street because Seguin is incorporated. Directional boring can pass beneath the street without cutting its pavement; the entry and exit pits go in the ground on either side. The route still has to account for marked utilities and access at the site.
How old are buried lines near Kingsbury Street in Seguin, and what does that mean for replacement bores?
The American Community Survey estimates a median housing year of 1984 in Seguin. Since 22% of homes were built before 1960 and 33% in 2000 or later, a Kingsbury Street route may involve older services or newer connections. Near Seguin’s municipal electric system, we expose marked utilities before drilling close to them.
Can I reach Trinity after hours for an urgent bore near Guadalupe Street in Seguin?
Yes. A person answers our phone at (405) 409-7423 24 hours a day, and we provide emergency response. For an urgent job near Guadalupe Street, describe the location and crossing so we can understand the work being requested.
How early should I request Texas811 marks for a Seguin bore along Austin Street?
Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it begins. If the Austin Street start slips more than 14 days past the original notice, make a new request. In Seguin, we have worn or moved utility marks refreshed through Texas811 before boring work continues.
What affects the cost of a directional bore under Interstate 10 in Seguin?
The route, length and pipe size matter, as do Seguin’s Branyon clay, utilities to expose, pavement, pits and any creek or rail crossing. An Interstate 10 crossing requires specific depth and pavement planning. Mobilization from the Yukon office is also part of the job scope.
Where the Seguin facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Seguin
- U.S. Census Bureau, TIGER/Line 2024: Seguin boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Seguin
- U.S. Census Bureau, American Community Survey 2019 to 2023: Seguin housing units and year built
- Macrostrat geologic map compilation: map units under Seguin
- U.S. EPA Safe Drinking Water Information System: public water systems serving Seguin
- U.S. Department of Transportation, North American Rail Network: track owners in Guadalupe County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Guadalupe County
- U.S. Geological Survey, Elevation Point Query Service: Seguin elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Seguin
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Seguin
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Seguin, Texas
Type the address of your job in Seguin. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Seguin
Same county: Cibolo · Schertz · Redwood · Selma · Santa Clara · New Berlin · Zuehl · Staples. All counties: Texas county list.
