Alton Texas Directional Boring: Hidalgo Soil, Highway 107, Mission Main Canal
Quick Answer: Alton is 704 road miles from our Yukon, Oklahoma main office, and work near Main Avenue is staffed by our crews or vetted partner crews. Along Texas State Highway 107, Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for Alton utility crossings. USDA mapping shows Hidalgo sandy clay loam, so we plan the bore for ground that can grip the pipe. That matters for service lines along Mile 6 Road and other streets.
Alton bores at a glance
- Incorporated city in Hidalgo County, Texas. Population 22,907 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 704 miles, about 13.8 hours of driving.
- Ground: Hidalgo soil is mapped on 57 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 107, FM 676, FM 494 and FM 492. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Mission Main Canal.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Main Avenue in Alton?
Alton is 704 road miles from our Yukon, Oklahoma main office, and work near Main Avenue is staffed by our crews or crews from vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts Alton at 22,907 people in Hidalgo County. We install water, sewer, gas, electric conduit and fiber, including service lines routed beneath Alton streets where open trenching would disrupt access.
Our main office is in Yukon, Oklahoma, and Alton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965 and began directional boring in 1982. For a Main Avenue service, our work ranges from 3/4 inch lines to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

How does Hidalgo soil affect a bore in Alton?
The USDA soil survey maps Hidalgo fine sandy loam across 31 percent of Alton and Hidalgo sandy clay loam across 21 percent. Brennan fine sandy loam covers 34 percent. At about 40 inches below the surface, clay loam is mapped under 59 percent of the city and sandy clay loam under 36 percent. For a Main Avenue bore, we account for the reported 27 percent average clay content at that depth when planning our work. These are mapped soil patterns, not test borings, so the exact ground along Main Avenue still needs to be checked as the bore is planned.
| USDA soil survey, inside the Alton city limits | What is mapped |
|---|---|
| Soil series mapped | Hidalgo 57 percent, Brennan 34 percent and Pits (miscellaneous area) 3 percent |
| Texture at the surface | fine sandy loam 67 percent, sandy clay loam 28 percent and variable 3 percent |
| Texture about 40 inches down | clay loam 59 percent, sandy clay loam 36 percent and variable 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 61 percent and clayey sand (SC) 34 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 4 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 5 percent of the area |
Bedrock is not mapped within the top five feet across Alton, though that does not rule out rock at greater depth. A seasonal water table within 60 inches is mapped in 4 percent of the area, so pits may need pumping if a bore near Mission Main Canal encounters wet ground. When planning near Mission Main Canal, we account for the fact that flood prone soils are not mapped in Alton. High steel corrosion risk covers 5 percent of the area, which can affect casing or tracer wire choices. The geologic map shows Holocene stabilized sand dunes, where loose sand can cave behind the drill head.
How do crews handle Alton clay loam?
Alton soil mapping shows both fine sandy loam and clay loam at depth. We adjust the fluid and reaming plan to the ground along each route, whether the bore is near Main Avenue or Mission Main Canal.
- Hidalgo soil includes sandy clay loam, so we ream in stages and keep pipe ready before the final pass to limit the time an open hole sits.
- Where Alton’s mapped sand dunes meet a bore route, we use drilling fluid to support the hole and stage the reaming before pulling pipe.
- If a pit near Mission Main Canal reaches seasonal water, we plan compact pits and pumping so wet ground does not disrupt the setup.
- On routes near Main Avenue, we expose each marked utility with hydrovac before drilling close, then track the drill head and log depth and pitch.

What is in the way of a new line in Alton near Texas State Highway 107?
Texas State Highway 107 runs 4.5 mapped roadway miles inside Alton, while FM 676 accounts for 4.4 miles. FM 494 and FM 492 also run inside the limits. Texas State Highway 364 is 0.5 miles outside the city limits. A route along Main Avenue, which runs 4.43 miles in the city, may also involve Mile 6 Road at 3.93 miles or Saint Jude Avenue at 2.91 miles. These streets and highways help define where pits can fit and where a bore can avoid cutting pavement.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 107 | State highway | 4.5 roadway miles inside | State highway office |
| FM 676 | State highway | 4.4 roadway miles inside | State highway office |
| FM 494 | State highway | 1 roadway miles inside | State highway office |
| FM 492 | State highway | 0.1 roadway miles inside | State highway office |
| Texas State Highway 364 | Highway nearby | 0.5 miles outside | State highway office |
| Mission Main Canal | Stream | 1.69 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Palm Lake | Lake or pond | 2 acres, inside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Alton or within one mile outside its limits, so the mapped route does not show a track crossing. Mission Main Canal runs 1.69 channel miles through the city and has three mapped street crossings. Palm Lake is a 2 acre lake inside the limits. For a canal or lake route, we plan the bore path and check during planning whether the crossing falls under U.S. Army Corps of Engineers jurisdiction.
Who approves a bore in Alton and Hidalgo County?
A bore beneath Texas State Highway 107 or another state highway, farm to market road, or ranch to market road needs a TxDOT utility permit for work in the right of way. For a Texas State Highway 107 crossing, we schedule around the TxDOT Pharr District review of our permit request. The utility that owns the line files through RULIS, while we prepare the bore plan and profile and work under that owner’s permit. TxDOT requires boring or tunneling under existing highway pavement, with casing and required cover. Alton is incorporated, so its city streets, including Main Avenue, belong to the city. A Mission Main Canal crossing is checked for federal jurisdiction during planning. No railroad is mapped in or near Alton.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities are in the ground in Alton and Hidalgo County?
The water provider for the specific Alton address has to be confirmed with the city, the county or the local water district before a bore is planned. For electric service in Hidalgo County, AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report service. Those reports do not identify the owner at every address, so we confirm the line owner before planning an electric conduit bore near Saint Jude Avenue.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative | Electric utilities reporting service in Hidalgo County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Alton’s median housing year at 2004; we plan underground work from site conditions. The estimates place 1 percent of homes before 1960, 38 percent from 1960 to 1999 and 61 percent in 2000 or later. Along Mile 6 Road, a replacement bore may meet older buried lines, while newer building areas can call for new services. We hydrovac pothole marked utilities on the route before drilling near them because surface marks show position, not depth.

What is near Alton and Palmhurst?
Alton is an incorporated city in Hidalgo County, covers 7.6 square miles and sits at an elevation of 161 feet. Its ZIP code is 78573. West Sharyland is 2.2 miles southwest, Palmhurst is 2.3 miles southeast, and La Homa is 3.0 miles west. Doffing is 4.7 miles west and Citrus City is 5.7 miles northwest. Mission, the nearest larger city, is 5.9 miles south; county seat Edinburg is 9.9 miles east. From our Yukon yard, the drive is 704 road miles and 13.8 hours, which affects mobilization for work near Texas State Highway 107.
Places near Alton
- West Sharyland: 2.2 miles southwest
- Palmhurst: 2.3 miles southeast
- Directional boring in La Homa: 3 miles west
- Directional boring in Doffing: 4.7 miles west
- Citrus City: 5.7 miles northwest
- Directional boring in Mission: 5.9 miles south
What boring work comes up in Alton near Saint Jude Avenue?
- Highway crossing: A bore beneath Texas State Highway 107 keeps the roadway uncut and follows the cover and casing terms in the TxDOT permit.
- Street service: A water or sewer service beneath Main Avenue can avoid an open cut across pavement and driveway access.
- Fiber route: A fiber conduit along Saint Jude Avenue can pass beneath street pavement while pits sit off the traveled surface.
- Canal crossing: A route beneath Mission Main Canal needs a planned profile and a jurisdiction check before the bore is laid out.
- Lake side route: Work near Palm Lake calls for a route that places entry and exit pits outside the water crossing.
- Electric conduit: Before a conduit bore near Mile 6 Road, we confirm the line owner and expose marked utilities along the path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore in Alton near Mission Main Canal?
Send the address or map pin first. The exact location matters near Mission Main Canal and Texas State Highway 107 because it shows which crossings and access points shape the route. We also need what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us work out where the bore pits and utility exposures fit.
The drive from Yukon is 704 road miles, so mobilization matters for an Alton job. Hidalgo sandy clay loam and the clay loam mapped below it affect drilling and reaming. Crossings of Texas State Highway 107 or Mission Main Canal can add planning and exposure work. Price also reflects the bore length and size, soil and rock, utilities crossed, pavement, pits, excavator time, sand backfill and any high profile or emergency work.
Questions people ask about boring in Alton
Does Trinity take directional boring jobs in Alton and Hidalgo County, and how are crews assigned?
Yes. We take directional boring work in Alton, and jobs near Main Avenue are handled by our own crews or by partner drilling contractors we have vetted. You work with Trinity through planning and the bore log, regardless of which crew is on site.
Can a line be bored beneath Mission Main Canal in Alton?
A bore can be planned beneath Mission Main Canal, which runs 1.69 channel miles through Alton. The route needs a profile that fits the ground and canal crossing, and planning checks whether the crossing is within U.S. Army Corps of Engineers jurisdiction.
Who owns electric lines in Alton and Hidalgo County, and who confirms conduit specs?
The specific owner must be confirmed for the Alton address before a conduit bore is planned. AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report electric service in Hidalgo County, but those reports do not establish which one serves a particular property.
Does the city or county control Saint Jude Avenue in Alton, and must it be cut?
Alton is incorporated, so Saint Jude Avenue is a city street. A directional bore can pass beneath pavement without cutting the street; pits are placed on either side of the crossing where access allows. The route still needs to account for marked utilities.
How old are Alton homes and buried lines near Mile 6 Road, and what does that mean for a replacement bore?
Alton’s median housing year is 2004 in the American Community Survey 2019 to 2023 estimates. Near Mile 6 Road, a replacement route may meet older buried utilities, so marked lines need exposure before drilling nearby. Newer homes can also require service bores.
What ground should I expect for an Alton bore in Hidalgo soil?
The USDA soil survey maps Hidalgo fine sandy loam and Hidalgo sandy clay loam in Alton. At about 40 inches below the surface, clay loam is mapped under 59 percent of the city. That ground can grip pipe, so the reaming and fluid plan should suit the route.
How far is Alton from the Yukon office, and does Mission affect the job?
Alton is 704 road miles from our Yukon, Oklahoma main office, with a drive of 13.8 hours. Mission is 5.9 miles south of Alton. The Yukon distance can affect mobilization, while the planned route near Mission or Texas State Highway 107 helps define the equipment and access needed.
How much 811 notice is needed for an Alton bore near Main Avenue, and what if marks move?
For a bore near Main Avenue, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If our Mile 6 Road start slips more than 14 days past the original notice, we submit a new request. Before we continue boring on Alton Boulevard, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring in Alton near Texas State Highway 107?
The job details set the price, with the 704 road miles from Yukon affecting mobilization. Length, pipe or conduit size, Hidalgo soil, exposed utilities and pavement all matter. A crossing of Texas State Highway 107 or Mission Main Canal can add planning and access needs, as can pits, excavator time, sand backfill or emergency work.
Where the Alton facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Alton
- U.S. Census Bureau, TIGER/Line 2024: Alton boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Alton
- U.S. Census Bureau, American Community Survey 2019 to 2023: Alton housing units and year built
- Macrostrat geologic map compilation: map units under Alton
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hidalgo County
- U.S. Geological Survey, Elevation Point Query Service: Alton elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Alton
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Alton
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Alton, Texas
Type the address of your job in Alton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
