McAllen Texas Directional Boring: Hidalgo Clay Loam, Edinburg Main Canal, Rio Valley Track
Quick Answer: Interstate 2 and Rio Valley Switching Company tracks are major crossings; Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in McAllen, Texas. From our Yukon, Oklahoma main office, McAllen is 703 road miles away, and an Edinburg Main Canal route needs a crossing plan. The USDA soil survey maps clay loam under about 40 inches across 57 percent of the area, where sticky cuttings can load a reamer. In Hidalgo clay loam, staged reaming and a same day pull help limit how long the open hole can grip pipe.
McAllen bores at a glance
- Incorporated city in Hidalgo County, Texas. Population 148,782 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 703 miles, about 13.7 hours of driving.
- Ground: Hidalgo soil is mapped on 54 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 2, US 83, US 83 Business, Texas State Highway 336 and Texas State Highway 107. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: Rio Valley Switching Company, with 52 mapped street and rail crossings.
- Named streams inside the boundary: Edinburg Main Canal, Mc Allen Mountain Irrigation Canal, Mission Branch Pilot Channel and Pharr Main Canal.
- Public water: McAllen Public Utility, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can bore near Rio Valley Switching Company in McAllen?
The Rio Valley Switching Company track and Interstate 2 shape routes for directional boring in McAllen, Hidalgo County. The Census Bureau Vintage 2024 estimate puts the city population at 148,782. We install water, sewer, gas, electric conduit and fiber, routing those lines beneath streets such as Col Rowe Boulevard or around track and highway crossings where the alignment requires it.
Our main office is in Yukon, Oklahoma, and McAllen work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught our family crew to manage sticky cuttings in McAllen’s mapped clay. We stage the ream and keep the pipe ready so the ground has less time to grip it.

What does the USDA soil survey show beneath McAllen in Hidalgo?
The USDA soil survey maps Hidalgo soil across 54 percent of McAllen, including Hidalgo sandy clay loam and Hidalgo Urban land complex. At about 40 inches below the surface, clay loam is mapped under 57 percent of the area, while sandy clay loam is mapped under 13 percent. The survey also estimates an average clay content of 33 percent at that depth. In McAllen, mapped soil patterns guide planning, but they are not test borings, so we verify conditions during the work. On a route near 23rd Street, the actual cut can still vary, so the bore plan should account for sticky material rather than assume uniform ground.
| USDA soil survey, inside the McAllen city limits | What is mapped |
|---|---|
| Soil series mapped | Hidalgo 54 percent, Brennan 11 percent, Runn 11 percent and Harlingen 7 percent |
| Texture at the surface | sandy clay loam 51 percent, fine sandy loam 16 percent and silty clay 12 percent |
| Texture about 40 inches down | clay loam 57 percent, sandy clay loam 13 percent and silty clay 11 percent |
| Engineering class about 40 inches down | lean clay (CL) 63 percent, fat clay (CH) 20 percent and clayey sand (SC) 11 percent |
| Average clay content about 40 inches down | 33 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 3 percent of the area |
| High corrosion risk for uncoated steel | 25 percent of the area |
| Mapped as urban land (disturbed fill) | 2 percent of the area |
The geologic map identifies the Pleistocene Beaumont Formation, mostly clay and mud; bedrock is not mapped in the top five feet, which does not rule out deeper rock. Seasonal water tables are mapped within 60 inches across 2 percent of the area, and flood prone soils across 3 percent, so pits near a canal need site checks and may need pumping. High steel corrosion risk is mapped under 25 percent of McAllen. The line owner should consider casing and tracer wire materials; HDPE avoids that steel concern.
How do we bore McAllen clay loam?
McAllen’s mapped clay loam can hold an open hole, then stick to the reamer and grip pipe. We choose the fluid and reaming sequence around that ground and the route, whether it follows 10th Street or crosses a canal.
- Hidalgo clay loam can cling to the reamer, so we use thinner fluid with polymer and open the hole in stages before pulling pipe along a route near Ware Road.
- At an Edinburg Main Canal crossing, we plan the bore to stay beneath the channel and check Corps jurisdiction; mapped flood prone soils make the crossing location worth checking.
- McAllen’s shallow seasonal water table is mapped under a small share of the area, but pits near wet ground can fill, so we keep them small and pump as needed.
- Before drilling near a marked line on 23rd Street, we hydrovac pothole it; a walkover locator tracks the head while we log depth and pitch.

What does a bore have to cross near Edinburg Main Canal in McAllen?
Interstate 2, US 83 and Texas State Highway 336 are among the main highway routes through McAllen. US 83 Business and Texas State Highway 107 also cross the city, so a bore beside those corridors needs a route that accounts for pavement and right of way. The longest named streets include 23rd Street at 14.72 miles, Col Rowe Boulevard at 12.45 miles and Ware Road at 12.32 miles within the city. A bore can pass below pavement without cutting it, with pits kept in the dirt on either side.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 2 | Interstate | 10.1 roadway miles inside | State highway office |
| US 83 | US highway | 10.1 roadway miles inside | State highway office |
| US 83 Business | US highway | 9.4 roadway miles inside | State highway office |
| Texas State Highway 336 | State highway | 12.6 roadway miles inside | State highway office |
| Texas State Highway 107 | State highway | 11.7 roadway miles inside | State highway office |
| FM 2220 | State highway | 11 roadway miles inside | State highway office |
| FM 2061 | State highway | 9.7 roadway miles inside | State highway office |
| Spur 115 | State highway | 9.5 roadway miles inside | State highway office |
| FM 1926 | State highway | 9.3 roadway miles inside | State highway office |
| Texas State Highway 495 | State highway | 4.7 roadway miles inside | State highway office |
| FM 1016 | State highway | 3.6 roadway miles inside | State highway office |
| FM 1925 | State highway | 3 roadway miles inside | State highway office |
| FM 494 | State highway | 2.6 roadway miles inside | State highway office |
| FM 681 | State highway | 1.3 roadway miles inside | State highway office |
Rio Valley Switching Company has 15.13 track miles in McAllen, and public mapping shows 52 street and rail crossings. Edinburg Main Canal has 6.97 channel miles in the city; Mc Allen Mountain Irrigation Canal and Mission Branch Pilot Channel are also mapped routes. Public mapping shows 74 street crossings of named streams. Río Grande and Boeye Reservoir are among the mapped water features, so a water crossing needs review during planning.
Who has to sign off on an Interstate 2 bore in McAllen?
For work on Interstate 2, US 83, Texas State Highway 336 or another state highway right of way, the line owner files the utility application in TxDOT’s RULIS system. We prepare the bore plan and profile for that filing, and the TxDOT Pharr District reviews it; the permit is issued to the line owner. For a TxDOT crossing in McAllen, rules call for boring or tunneling beneath existing highway pavement. Electric and communication lines need 60 inches of cover at a crossing and 48 inches along the right of way. Water needs 60 inches at a crossing and 36 inches along it; pressurized sewer needs 60 inches at a crossing. A Rio Valley Switching Company track crossing needs an agreement with the railroad, and an Edinburg Main Canal crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are already buried in Hidalgo County near McAllen?
McAllen Public Utility uses surface water and reports 145,096 service connections serving 145,050 people. That network matters when a proposed bore follows Ware Road or crosses a water main. AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report electric service in Hidalgo County. Those records do not establish the provider at every address, so we confirm the line owner before setting conduit bore details.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| McAllen Public Utility | Public water system | Surface water | 145,096 connections, 145,050 people served |
| AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative | Electric utilities reporting service in Hidalgo County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put McAllen’s median housing year at 1993; 5 percent of homes were built before 1960, 56 percent from 1960 to 1999 and 39 percent in 2000 or later. Housing age does not date the buried lines, but it helps frame replacement work versus new service along Col Rowe Boulevard. Before drilling near marked utilities on a McAllen bore path, we hydrovac pothole each one to confirm its location. A line beneath 10th Street must be exposed because locate paint shows position, not depth.

Where is McAllen in relation to Palmhurst and our Yukon yard?
McAllen is an incorporated city in Hidalgo County, covers 62.37 square miles and sits at 120 feet elevation. Its ZIP codes include 78503, 78504, 78501, 78573, 78557 and 78541. Palmhurst is 3.8 miles northwest, Mission is 5.1 miles west and Pharr is 5.3 miles southeast. Edinburg, the county seat, is 8.6 miles northeast. The Yukon, Oklahoma main office is 703 road miles away, a 13.7 hour drive, which affects mobilization for work near Interstate 2.
Places near McAllen
- Palmhurst: 3.8 miles northwest
- Directional boring in Mission: 5.1 miles west
- Directional boring in Pharr: 5.3 miles southeast
- Directional boring in Lopezville: 5.9 miles east
- Directional boring in Alton: 6 miles northwest
Which jobs call for a bore near Col Rowe Boulevard in McAllen?
- Highway crossing: A bore beneath Interstate 2 avoids cutting existing pavement, with the line owner handling the TxDOT utility permit.
- Water service: A connection near Ware Road may need a route that clears McAllen Public Utility lines and keeps pits out of the paved roadway.
- Fiber conduit: A run along 23rd Street can pass below driveways and sidewalks, with marked utilities exposed before the drill approaches them.
- Canal crossing: An Edinburg Main Canal bore needs a depth plan under the channel and a check for Corps jurisdiction.
- Rail crossing: A route beneath Rio Valley Switching Company track needs the railroad’s crossing agreement and its conditions for casing, depth and flagging.
- Street replacement: A sewer or water line near Col Rowe Boulevard can be installed by bore to avoid opening a long stretch of pavement.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near 10th Street in McAllen?
For a bore along 10th Street, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the entry and exit pits, nearby utilities and the route around pavement. A plan showing an Edinburg Main Canal crossing also helps us identify what needs review.
In McAllen, soil and crossing count lead the pricing review: Hidalgo clay loam can slow reaming, and each marked utility on the route needs exposure before drilling nearby. Pipe size and footage also matter, as do pavement, canal crossings, pits, excavator time and sand backfill. An Interstate 2 or Rio Valley Switching Company crossing adds planning details. Mobilization is another factor because McAllen is 703 road miles from Yukon.
Questions people ask about boring in McAllen
Does Trinity take directional boring work in Hidalgo County near McAllen, and how is it staffed?
Yes. We take directional boring work in McAllen and across Texas, planning each crossing around the conditions at the site. Our own crews handle jobs, with partner drilling contractors at satellite yards when needed; Trinity vets those partners. From the first call through the bore log, we work with Trinity on McAllen projects, regardless of which crew is on site. Routes near Rio Valley Switching Company track are planned around the actual crossing.
Who runs McAllen’s public water system, and where does its water come from?
McAllen Public Utility owns the public water system, which uses surface water. It reports 145,096 service connections and 145,050 people served. For a bore near Ware Road, the system’s nearby lines still need to be located and exposed so the route can avoid a conflict.
Which electric companies report service in Hidalgo County near McAllen, and who confirms conduit needs?
AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report electric service in Hidalgo County. That information does not identify the provider serving every McAllen address, so we confirm service details before planning underground work. The line owner needs to be confirmed before conduit details are planned for a bore near Interstate 2 or another route.
Who is responsible for Ware Road in McAllen, and does a bore require cutting it?
McAllen is incorporated, so Ware Road is a city street. A directional bore can pass beneath pavement without opening the street, with entry and exit pits placed in dirt where the site allows. We expose marked utilities along the bore path before drilling near them.
What does McAllen housing age mean for replacement bores near Col Rowe Boulevard?
The American Community Survey 2019 to 2023 estimates put the median housing year at 1993, but that does not date the buried pipes. Older homes may be part of replacement work, while newer development can call for service extensions. Near Col Rowe Boulevard, we pothole marked lines before crossing them.
Does Hidalgo soil in McAllen corrode steel, and what pipe can be used?
The USDA soil survey maps high steel corrosion risk under 25 percent of McAllen. The line owner chooses coatings for steel casing or tracer wire; HDPE is not affected by that soil concern. The survey’s Hidalgo sandy clay loam mapping helps guide planning, but it is not a test of a particular bore location.
How far is McAllen from Trinity’s Yukon, Oklahoma main office, and does distance affect a job?
McAllen is 703 road miles and a 13.7 hour drive from our Yukon, Oklahoma main office, so we plan travel accordingly. That distance can affect mobilization for a job near Interstate 2. The route, ground and crossings still determine the equipment and crew time required.
How much 811 notice does a McAllen bore near 23rd Street need, and what if marks move?
The Texas811 request for a bore near 23rd Street must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For McAllen work, if the start slips more than 14 days past the original notice, we make a new request. On McAllen jobs, we refresh worn or moved utility marks through Texas811 before work continues.
What affects the cost of a directional bore near Interstate 2 in McAllen?
The price depends on the job’s length, pipe or conduit size, Hidalgo clay, exposed utilities, pavement and crossing conditions. A route under Interstate 2 or Rio Valley Switching Company track can add planning demands. Canal crossings, pits, excavator time, sand backfill, emergency timing and mobilization from Yukon also affect the scope.
Where the McAllen facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside McAllen
- U.S. Census Bureau, TIGER/Line 2024: McAllen boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: McAllen
- U.S. Census Bureau, American Community Survey 2019 to 2023: McAllen housing units and year built
- Macrostrat geologic map compilation: map units under McAllen
- U.S. EPA Safe Drinking Water Information System: public water systems serving McAllen
- U.S. Department of Transportation, North American Rail Network: track owners in Hidalgo County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hidalgo County
- U.S. Geological Survey, Elevation Point Query Service: McAllen elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to McAllen
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in McAllen
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in McAllen, Texas
Type the address of your job in McAllen. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
