Midway North Texas Directional Boring: Hidalgo Soil, Interstate 2, Rio Valley Rail
Quick Answer: We handle directional boring, also called horizontal directional drilling (HDD), in Midway North, Texas, including utility routes beneath Interstate 2. Our Yukon, Oklahoma main office is 711 road miles away, and work near Mile 9 Road is staffed by our crews and vetted partner contractor crews. Hidalgo soil maps to clay loam about 40 inches down, so sticky cuttings and fluid control shape the bore. Victoria Road is one local route where we can plan a bore to avoid cutting pavement.
Midway North bores at a glance
- Unincorporated community in Hidalgo County, Texas. Population 4,232 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 711 miles, about 13.9 hours of driving.
- Ground: Hidalgo soil is mapped on 89 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Interstate 2 and US 83. State permit office: TxDOT Pharr District.
- Railroad track inside the boundary: none mapped.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring near the Rio Valley Switching Company track in Midway North?
The 2020 Census counted 4,232 people in Midway North, an unincorporated community in Hidalgo County. We install water, sewer, gas, electric conduit and fiber lines, including routes beneath Victoria Road or Mile 6 1/2. The line type, size and route determine the drilling setup, especially where a proposed path approaches the Rio Valley Switching Company track outside the mapped community boundary.
Our main office is in Yukon, Oklahoma, and Midway North work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A small service line near Mile 9 Road and a larger casing beneath Interstate 2 fit our range, from 3/4 inch service lines to 48 inch casing and 10 feet to 5,000 feet in length. Our family business started in 1965, and we have done directional boring since 1982 for proposed work serving Midway North’s ZIP codes, 78599 and 78537.

What is Hidalgo soil like to bore in Midway North?
The USDA soil survey maps Hidalgo soil series across 89 percent of Midway North. Hidalgo sandy clay loam at 0 to 1 percent slopes covers 56 percent of the mapped area, while Hidalgo fine sandy loam covers 31 percent. At about 40 inches below the surface, clay loam is mapped under 91 percent of the area, and the average clay content at that depth is 30 percent. Sandy clay loam and fine sandy loam make up much of the mapped surface texture. These are mapped patterns, not test borings, so the actual bore route still needs field checks.
| USDA soil survey, inside the Midway North mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Hidalgo 89 percent and Willacy 3 percent |
| Texture at the surface | sandy clay loam 60 percent and fine sandy loam 36 percent |
| Texture about 40 inches down | clay loam 91 percent and sandy clay loam 6 percent |
| Engineering class about 40 inches down | lean clay (CL) 97 percent |
| Average clay content about 40 inches down | 30 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 3 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 4 percent of the area |
The USDA soil survey does not map bedrock within the top five feet in Midway North, but that map does not rule out deeper rock. A seasonal water table is mapped within 60 inches across 3 percent of the area, and flood prone soils cover 2 percent. Across Midway North, mapped high steel corrosion risk covers 4 percent, so we recommend the line owner consider casing and tracer wire materials. The geologic map identifies Holocene stabilized sand dunes, mostly sand, which can affect how the bore hole stays open.
How do we bore through clay loam in Midway North?
Hidalgo clay loam about 40 inches down calls for controlled fluid and staged reaming. We adjust the bore plan to the route, since mapped soil patterns around Victoria Road are not a substitute for checking the actual ground.
- With Hidalgo clay loam mapped about 40 inches down, we use controlled drilling fluid and staged reaming to manage sticky cuttings.
- Near Interstate 2 pavement, we keep fluid pressure controlled so the ground does not lift, and plan a bore rather than an open cut.
- At a marked crossing along Victoria Road, we hydrovac expose each utility on the bore path before the drill approaches it.
- Where the route approaches the Rio Valley Switching Company track, we plan for the railroad agreement and track specific crossing conditions.

Where might a line go under Rio Valley Switching Company near Midway North?
Interstate 2 and US 83 each run through the mapped Midway North community boundary, with 1.8 roadway miles of each mapped inside it. US 83 Business is 0.6 miles outside the boundary. Victoria Road is the longest named street at 1.6 miles, followed by Mile 6 1/2 at 1.47 miles and Mile 9 Road at 1.26 miles. A bore beneath a highway or one of these streets can keep pavement intact, with the route and access points planned around the specific crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 2 | Interstate | 1.8 roadway miles inside | State highway office |
| US 83 | US highway | 1.8 roadway miles inside | State highway office |
| US 83 Business | Highway nearby | 0.6 miles outside | State highway office |
| Rio Valley Switching Company | Railroad nearby | 0.6 miles outside | The railroad |
No railroad is mapped inside the Midway North boundary. Rio Valley Switching Company owns the track mapped 0.6 miles outside it, so a route that reaches that track needs the railroad’s crossing agreement. No street and rail crossing is mapped inside the community. No named stream or lake is mapped inside or within one mile, though the survey maps 2.66 miles of unnamed drainage in the community. A drainage route needs site review before its bore path is set.
Who approves a Midway North bore in Hidalgo County?
Midway North has no city government, so street approvals fall to the county or state rather than a city department. Interstate 2 and US 83 are state highways, and work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Pharr District. The utility owner, not the drilling contractor, submits the application through TxDOT’s RULIS system; we prepare the bore plan and profile for that filing. If a route crosses the Rio Valley Switching Company track, the railroad’s agreement is needed. The mapped unnamed drainage also needs to be considered during route planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Hidalgo County near Midway North?
The water provider for a specific Midway North address has to be confirmed with Hidalgo County or the local water district before a bore is planned. EPA drinking water records for Texas do not match a system to this community, so the provider must be checked for the job address. AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report electric service in Hidalgo County. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative | Electric utilities reporting service in Hidalgo County | EIA Form 861 | Confirm the line owner by address |
We use the American Community Survey 2019 to 2023 five year estimates, which put Midway North’s median housing year at 1995, as context when planning underground work. The estimates show 1 percent of homes built before 1960, 59 percent from 1960 to 1999 and 40 percent in 2000 or later. That mix can mean either replacement lines or new services along Mile 6 1/2. Before drilling near a marked utility, we hydrovac pothole to expose it; paint shows a line’s position, not its depth.

Where is Midway North in relation to Midway South?
Midway North is an unincorporated community in Hidalgo County, with 1.73 square miles of mapped land at an elevation of 80 feet. For underground planning, we check whether a Midway North address is in ZIP code 78599 or 78537. Midway South is 2.1 miles south, while Donna is 2.2 miles southwest and Weslaco is 2.7 miles southeast. Edinburg, the county seat, is 12.3 miles northwest. From our Yukon, Oklahoma main office, the road distance is 711 miles and the drive is 13.9 hours, which matters when planning crew mobilization for work near Interstate 2.
Places near Midway North
- Midway South: 2.1 miles south
- Directional boring in Donna: 2.2 miles southwest
- Directional boring in Weslaco: 2.7 miles southeast
- Olivarez: 3.3 miles northeast
- Scissors: 4.1 miles southwest
What boring work comes up along Victoria Road in Midway North?
- Highway crossing: A route beneath Interstate 2 or US 83 needs a bore plan that accounts for the highway right of way and pavement.
- Street service: A water or sewer line beneath Victoria Road can avoid an open cut across the pavement when the route and access allow.
- Fiber conduit: A conduit route along Mile 6 1/2 needs marked utilities exposed before drilling near existing services.
- Rail crossing: A proposed path to the Rio Valley Switching Company track needs the railroad’s agreement before the crossing plan is settled.
- Drainage route: A bore near the mapped unnamed drainage should account for the channel and the actual ground along the proposed path.
- Utility replacement: A line near Mile 9 Road may need potholing to identify the depth and position of marked lines before the bore.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Interstate 2 in Midway North?
Start with the address or map pin, such as a location near Interstate 2 or Victoria Road. Tell us what goes in the ground, then give the pipe or conduit size and the planned footage. A sketch or plans help show how the route meets Mile 9 Road, nearby utilities or a drainage path.
Length, pipe size and the Hidalgo clay loam matter because they shape the drilling time and reaming plan. The number of utilities to expose and any pavement along Interstate 2 also change the work. A route near the Rio Valley Switching Company track may need added crossing coordination, while pits, excavator time, sand backfill and drainage crossings affect the scope. The 711 road miles from Yukon can also affect mobilization.
Questions people ask about boring in Midway North
Does Trinity Boring Solutions take directional boring work in Midway North, Hidalgo County?
Yes. We take directional boring work in Midway North, and our own crews or vetted partner contractor crews can handle the job. The required staffing sentence covers how we serve the area; you work with Trinity through the bore log. A route near Victoria Road or Interstate 2 helps us understand the local site.
Who approves a bore under Interstate 2 in Midway North?
TxDOT reviews work in the Interstate 2 right of way through its Pharr District. The utility owner submits the application in TxDOT’s RULIS system, and we prepare the bore plan and profile for that owner. A route beneath Interstate 2 must be planned around the highway crossing requirements and the permit issued to the utility owner.
What does a bore under Rio Valley Switching Company track near Midway North need?
It needs an agreement from Rio Valley Switching Company, the railroad owner of the track mapped 0.6 miles outside the Midway North boundary. The railroad sets the crossing conditions, including casing, depth and flagging. If the line is also on highway right of way, TxDOT asks for a copy of the agreement.
Who owns electric lines in Hidalgo County near Midway North, and who confirms conduit specs?
AEP Texas Central, Oncor Electric Delivery Company and Magic Valley Electric Cooperative report electric service in Hidalgo County. We cannot use ZIP codes 78599 and 78537 to identify the provider at every Midway North address. We confirm the owner for the specific line before planning a conduit bore, and the line owner confirms its conduit specifications.
Who is in charge of Mile 9 Road in Midway North, and does it need to be cut?
Midway North is unincorporated and has no city government, so street responsibility belongs to the county or state rather than a city. A bore under Mile 9 Road can avoid cutting the pavement, subject to the route and the responsible authority’s approval. The street is mapped for 1.26 miles inside the community.
How old are the homes and buried lines near Mile 6 1/2 in Midway North?
The American Community Survey 2019 to 2023 estimates put the median housing year at 1995, with 59 percent of homes built from 1960 to 1999. A Mile 6 1/2 project could involve replacement lines or a new service, so we expose marked utilities with hydrovac before drilling near them.
Does Midway North’s distance from Yukon change a bore job near Donna?
Midway North is 711 road miles and a 13.9 hour drive from our Yukon, Oklahoma main office; Donna is 2.2 miles southwest of the community. That distance can affect mobilization planning and the job scope. We discuss the route, work length and site conditions before setting the plan.
How much notice does Texas811 need for a bore along Victoria Road in Midway North?
The excavator requests a Texas811 locate at least 48 hours before work starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. For a bore along Victoria Road, describe the planned path. If the start slips more than 14 days past the original notice, submit a new request; refresh worn or moved marks through Texas811 before work continues.
What affects the cost of directional boring near Interstate 2 in Midway North?
The job’s length, pipe or conduit size and Hidalgo clay loam affect the plan first. Price also reflects utilities to expose, pavement near Interstate 2, drainage crossings, pits, excavator time and backfill. A route involving the Rio Valley Switching Company track or mobilization from Yukon can add planning and travel needs. We need the job details to assess the scope.
Where the Midway North facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Midway North
- U.S. Census Bureau, TIGER/Line 2024: Midway North boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Midway North population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Midway North housing units and year built
- Macrostrat geologic map compilation: map units under Midway North
- U.S. Department of Transportation, North American Rail Network: track owners in Hidalgo County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hidalgo County
- U.S. Geological Survey, Elevation Point Query Service: Midway North elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Midway North
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Midway North
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Midway North, Texas
Type the address of your job in Midway North. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
