Lometa Texas Directional Boring: Walnut Clay, BNSF Railway and Salt Creek
Quick Answer: BNSF Railway tracks are a major crossing to plan around, and we take directional boring, also called horizontal directional drilling (HDD), work in Lometa, Texas. The Yukon main office is 360 road miles away, with US 183 running through Lometa. USDA soil mapping shows bedrock within 40 inches across much of the city, so the route and depth need a close look. Walnut Clay also includes clay and limestone, which can slow drilling.
Lometa bores at a glance
- Incorporated city in Lampasas County, Texas. Population 801 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 360 miles, about 7.4 hours of driving.
- Ground: Lampasas soil is mapped on 26 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 78 percent of the area.
- Highways inside the boundary: US 183, US 190 and FM 581. State permit office: TxDOT Brownwood District.
- Railroad track inside the boundary: BNSF Railway, with 6 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Salt Creek in Lometa?
Lometa is in Lampasas County, where the Census Bureau Vintage 2024 estimate puts the population at 801. We install water and sewer lines, gas lines, electric conduit and fiber, including routes beneath Railway Street or US 183 when a cut would disrupt the road. Our crews can also bore under the BNSF Railway tracks with the required crossing arrangements.
Our main office is in Yukon, Oklahoma, and Lometa work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. Our work ranges from 3/4 inch service lines to 48 inch casing, a useful range for Lometa’s street services and larger crossings.

What kind of ground should we expect in Lometa near Lampasas soil?
The USDA soil survey maps Lampasas soil across 26 percent of Lometa, Topsey across 21 percent and Nuff across 20 percent. Surface textures include clay loam across 36 percent, gravelly clay across 26 percent and silty clay across 26 percent. At about 40 inches below the surface, the survey maps bedrock across 56 percent, silty clay loam across 21 percent and clay across 20 percent. Average clay content at that depth is 42 percent. These are mapped patterns, not test borings, so the actual bore route still needs site review.
| USDA soil survey, inside the Lometa city limits | What is mapped |
|---|---|
| Soil series mapped | Lampasas 26 percent, Topsey 21 percent, Nuff 20 percent, Brackett 16 percent and Bolar 9 percent |
| Texture at the surface | clay loam 36 percent, gravelly clay 26 percent and silty clay 26 percent |
| Texture about 40 inches down | bedrock 56 percent, silty clay loam 21 percent and clay 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 21 percent, elastic silt (MH) 20 percent and fat clay (CH) 3 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 78 percent of the area (38 percent hard rock, 39 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 51 percent of the area |
The soil survey maps bedrock within 40 inches across 78 percent of Lometa, with a typical depth of 20 inches. The mapped Walnut Clay unit is Albian and includes clay, limestone and shale, so a route may shift from sticky ground to slower rock. For Lometa boring, we treat seasonal water table and flood prone soils as unmapped and verify conditions before setting a depth. High steel corrosion risk covers 51 percent of the mapped area, so the line owner should consider casing and tracer wire materials; HDPE avoids that steel concern.
How do we drill Lometa ground where bedrock is mapped?
In Lometa, clay and shallow mapped bedrock call for a measured approach. We track the drill head from the surface, keep the hole stable and adjust tooling if the route meets rock.
- Lampasas soil has clay loam and gravelly clay at the surface; we manage sticky cuttings and ream in stages so the hole stays workable.
- With bedrock mapped within 40 inches across 78 percent of Lometa, we check the route and use rock capable tooling if the bore meets harder material.
- Where Walnut Clay turns from clay to limestone or shale, we log depth and pitch as the head advances to keep the route on line.
- Before a bore near Railway Street, we hydrovac pothole marked utilities along the path; paint locates a line horizontally, not vertically.

Which roads, tracks or creeks can a Lometa bore cross near Railway Street?
US 183 and US 190 each have 0.8 mapped roadway miles inside Lometa, while FM 581 has 1.6. A bore beneath one of those highways needs a plan that respects its right of way and pavement. Railway Street is the longest named street at 1.44 miles, followed by Main Street at 1.1 miles and Lampasas Street at 1.04 miles. The city has 21.19 public road centerline miles, so the route and the streets it meets shape the work.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 183 | US highway | 0.8 roadway miles inside | State highway office |
| US 190 | US highway | 0.8 roadway miles inside | State highway office |
| FM 581 | State highway | 1.6 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 2.26 track miles inside | The railroad |
| Central Texas and Colorado River Railway | Railroad nearby | 0.3 miles outside | The railroad |
| Salt Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Kirby Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Barkley Creek | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Lometa Reservoir | Lake or pond | 85 acres, nearby | Checked for Corps of Engineers jurisdiction |
BNSF Railway has 2.26 track miles inside Lometa, and public mapping shows 6 street and rail crossings. Salt Creek, Kirby Creek and Barkley Creek are each 0.6 miles outside the city limits; none of the named streams is mapped inside the city. Lometa Reservoir, an 85 acre water body, is also outside the limits. A route toward one of those water features needs its crossing conditions checked during planning.
Who approves a Lometa bore under US 183 or BNSF Railway?
Lometa’s city streets belong to the city, while work in the right of way of US 183, US 190 or FM 581 needs a TxDOT utility permit. The TxDOT Brownwood District reviews the utility owner’s application in RULIS; we prepare the bore plan and profile for that filing. Under US 183, electric and communication lines need 60 inches of cover below the lowest crossed grade, while water lines need 60 inches and pressurized sewer lines need 60 inches at a crossing. A BNSF Railway crossing also needs an agreement with the railroad, which sets crossing conditions. A creek or lake route is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines in Lometa and Lampasas County?
The water provider for a specific Lometa address has to be confirmed with the city, Lampasas County or the local water district before a bore is planned. For electric service in Lampasas County, Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report service. Those records do not identify the provider at every address, so we confirm the electric line owner before planning conduit along Main Street or another Lometa route.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative | Electric utilities reporting service in Lampasas County | EIA Form 861 | Confirm the line owner by address |
We use Lometa’s American Community Survey 2019 to 2023 five year estimates, which put median housing year at 1971, to inform underground work planning. The survey estimates 41 percent of housing was built before 1960, 43 percent from 1960 to 1999 and 16 percent in 2000 or later. That mix can mean replacing older service lines as well as installing new ones. Before drilling near Lampasas Street, we hydrovac pothole marked utilities on the route because surface marks do not show line depth.

Where is Lometa in relation to San Saba and Lampasas?
Lometa is an incorporated city in Lampasas County, at an elevation of 1,485 feet across 0.84 square miles. Its ZIP code is 76853. Lampasas is 16.3 miles southeast and is both the nearest larger city and the county seat. San Saba is 19.4 miles west, and Goldthwaite is 19.4 miles northwest; Evant is 22.9 miles northeast. The Yukon, Oklahoma main office is 360 road miles away, a 7.4 hour drive, so distance is part of planning work on Lometa streets such as Main Street.
Places near Lometa
- Directional boring in Lampasas: 16.3 miles southeast
- Directional boring in San Saba: 19.4 miles west
- Directional boring in Goldthwaite: 19.4 miles northwest
- Directional boring in Evant: 22.9 miles northeast
- Directional boring in Tow: 23.1 miles south
Which jobs call for a bore near Main Street in Lometa?
- Highway crossing: A bore beneath US 183 or FM 581 keeps the route under the pavement and follows the applicable TxDOT permit plan.
- Water service: A replacement line near Main Street can pass beneath pavement instead of opening a trench across the street.
- Fiber route: Conduit along Railway Street needs a route checked for existing lines before the drill approaches them.
- Rail crossing: A bore beneath the BNSF Railway tracks needs an agreement with the railroad and a crossing plan.
- Creek route: Work toward Salt Creek needs planning for the water crossing even though the creek is outside Lometa’s limits.
- Electric conduit: For a route on Lampasas Street, we confirm the line owner before planning the conduit bore.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Lometa bore near Seventh Street?
For a Seventh Street quote, send the job address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help us check the route. A plan showing nearby streets and the BNSF Railway helps us see whether the bore meets a track, a highway right of way or another utility.
The price follows the route and its conditions. In Lometa, soil and rock come first because Walnut Clay includes clay and limestone, and bedrock is commonly mapped shallow. The number of utilities to expose, the BNSF Railway or a US 183 crossing, pavement, pits and excavator time also affect the scope. Creek or drainage crossings, sand backfill, emergency timing and mobilization from the Yukon office matter too; the 360 road miles make distance relevant.
Questions people ask about boring in Lometa
Does Trinity take directional boring jobs in Lometa and Lampasas County, and who staffs them?
Yes. We take directional boring work in Lometa and across Texas, with our own crews and satellite yards run by partner drilling contractors we have vetted. From the first call to the bore log for Lometa work, we stay involved regardless of which crew is on site. We can plan routes near Railway Street or US 183.
Who owns electric lines in Lometa, Lampasas County, and who confirms conduit specs?
Oncor Electric Delivery Company, Hamilton County Electric Cooperative Association and Pedernales Electric Cooperative report electric service in Lampasas County. That does not identify the provider for every Lometa address. We confirm the line owner for the specific route and coordinate conduit specifications with that owner before a bore near Main Street.
Does the city or county control Lometa streets like Lampasas Street, and must we cut them?
Because Lometa is incorporated, we treat its city streets as belonging to the city when planning a boring route. A bore under Lampasas Street can avoid cutting the pavement when the route and site conditions allow. We check marked utilities and expose them by hydrovac potholing before drilling near them, since surface marks do not give their depth.
How old are buried lines near Lometa Main Street, and what does that mean for replacement bores?
The American Community Survey 2019 to 2023 estimates Lometa’s median housing year at 1971, with 41 percent of housing built before 1960. Older streets such as Main Street may need replacement services as well as new connections. We pothole marked utilities on the planned route before the drill gets close.
Does Lampasas soil in Lometa corrode steel, and what pipe should we use?
The USDA soil survey maps high steel corrosion risk across 51 percent of Lometa. That makes casing and tracer wire materials worth reviewing with the line owner. HDPE does not share the steel corrosion concern, but the owner selects materials for a route through Lampasas soil or beneath Railway Street.
What ground does a Lometa bore pass through in Lampasas soil?
The USDA soil survey maps Lampasas soil across 26 percent of Lometa. At about 40 inches below the surface, mapped textures include bedrock across 56 percent of the area, silty clay loam across 21 percent and clay across 20 percent. These are mapped conditions, not test borings, so the planned route needs site review.
Can I reach Trinity after hours about an urgent bore near Lometa Lampasas Street?
Yes. A person answers our phone 24 hours a day at (405) 409-7423. Tell us where the work is near Lampasas Street and whether it involves a service line, highway or BNSF Railway crossing. We provide 24 hour emergency response, with the route and conditions guiding the next steps.
How much notice does Texas811 need for a Lometa bore near Railway Street, and what if marks move?
For a bore near Railway Street, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For a Lometa start delayed more than 14 days beyond the original notice, we submit a new request before scheduling work. Before we resume Lometa work, we refresh worn or moved marks through Texas811 so the marked route is current.
What affects the cost of directional boring in Lometa under US 183?
In Lometa, we set the price from the full job scope, not footage alone, so the planned boring work defines the estimate. Under US 183, the bore plan, pavement and required cover affect the work. Walnut Clay and shallow mapped bedrock can change tooling and time. Pipe size, length, utilities to expose, pits, creek crossings, emergency timing and mobilization from the Yukon office also factor into the quote.
Where the Lometa facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Lometa
- U.S. Census Bureau, TIGER/Line 2024: Lometa boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Lometa
- U.S. Census Bureau, American Community Survey 2019 to 2023: Lometa housing units and year built
- Macrostrat geologic map compilation: map units under Lometa
- U.S. Department of Transportation, North American Rail Network: track owners in Lampasas County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Lampasas County
- U.S. Geological Survey, Elevation Point Query Service: Lometa elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Lometa
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Lometa
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Lometa, Texas
Type the address of your job in Lometa. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Lometa
Same county: Kempner · Copperas Cove. All counties: Texas county list.
