Riviera Texas Directional Boring: Palobia Soil, US 77 and Union Pacific Track
Quick Answer: Riviera is an unincorporated community in Kleberg County, Texas, so county and state agencies handle its streets; we take directional boring, also called horizontal directional drilling (HDD), for routes near US 77. The 627 road miles from our Yukon office matter on mobilization, as does a route crossing the Union Pacific track. Palobia soil covers 72 percent of the mapped area, and sandy clay loam below about 40 inches can hold a hole while gripping pipe.
Riviera bores at a glance
- Unincorporated community in Kleberg County, Texas. Population 609 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 627 miles, about 12.2 hours of driving.
- Ground: Palobia soil is mapped on 72 percent of the area, with sandy clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 77, FM 771 and Texas State Highway 285. State permit office: TxDOT Corpus Christi District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Public water: Riviera Water Control and Improvement District, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Riviera and US 77?
Riviera is an unincorporated community, so Kleberg County or the state manages its streets rather than a city government. The Census Bureau counted 609 people in 2020; it does not publish yearly estimates for unincorporated places. We install water, sewer, gas, electric conduit and fiber along routes such as 8th Street, FM 771 and US 77, with the route planned around the line and each crossing.
Our main office is in Yukon, Oklahoma, and Riviera work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. In Riviera, the range runs from 3/4 inch service lines to 48 inch casing and bore lengths of 10 feet to 5,000 feet. Our family business started in 1965 and has done directional boring since 1982, including work scoped for 8th Street or US 77.

What is Riviera ground like to bore through Palobia soil?
The USDA soil survey maps Palobia soil across 72 percent of Riviera and Palobia loamy fine sand across 22 percent. Palobia Colmena complex, 1 to 3 percent slopes, accounts for 46 percent of the mapped area. At the surface, fine sandy loam is mapped under 67 percent, while loamy fine sand is mapped under 23 percent. About 40 inches down, sandy clay loam is mapped under 95 percent of the area and sandy clay under 5 percent. These are mapped patterns, not test borings, so the exact route still needs field planning.
| USDA soil survey, inside the Riviera mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Palobia 72 percent, Padrones 11 percent, Czar 6 percent, Papagua 5 percent and Colmena 4 percent |
| Texture at the surface | fine sandy loam 67 percent, loamy fine sand 23 percent and fine sand 11 percent |
| Texture about 40 inches down | sandy clay loam 95 percent and sandy clay 5 percent |
| Engineering class about 40 inches down | lean clay (CL) 72 percent, clayey sand (SC) 23 percent and fat clay (CH) 5 percent |
| Average clay content about 40 inches down | 28 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 5 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 77 percent of the area |
The USDA soil survey maps sandy clay loam below about 40 inches across most of Riviera, where clay can hold a hole and grip pipe; staged reaming and timely pullback help manage that condition. Bedrock is not mapped in the top five feet, which does not rule out deeper rock. A seasonal water table is mapped under 5 percent of the area, while flood prone soils are not mapped. High steel corrosion risk is mapped under 77 percent, so the line owner should consider casing and tracer wire materials. The geologic map shows Holocene age Eolian Sheet Sand, with sand, clay and silt.
What does it take to bore Riviera sandy clay loam?
Riviera shifts from sandy surface soils to sandy clay loam below about 40 inches. We plan the reaming and fluid for that change, then track the head along the proposed route near 8th Street or US 77.
- Surface tracking: On a route near 8th Street, a walkover locator follows the drill head while we log its depth and pitch as it advances.
- Stage the ream: Riviera’s sandy clay loam below about 40 inches can cling to the pipe, so we use planned reaming stages and prepare the pipe for pullback.
- Manage the fluid: Fine sandy surface soils over clay call for fluid suited to the changing ground; near pavement on US 77, we keep pressure controlled.
- Expose marked lines: At a proposed route on 7th Street, hydrovac potholing reveals each marked utility before the drill approaches; paint alone does not show depth.

Which roads, tracks or creeks could a Riviera bore cross near Arana Creek?
US 77 runs 2.2 mapped roadway miles inside Riviera, FM 771 runs 2.5 miles and Texas State Highway 285 runs 0.2 miles. No highways are mapped within 1.5 miles outside the community boundary. Among named streets, 8th Street is the longest at 0.46 miles, followed by North Boulevard at 0.44 miles and 9th Street at 0.4 miles. A route along 7th Street or across a highway needs its own alignment plan; boring beneath existing highway pavement avoids cutting through it.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 77 | US highway | 2.2 roadway miles inside | State highway office |
| FM 771 | State highway | 2.5 roadway miles inside | State highway office |
| Texas State Highway 285 | State highway | 0.2 roadway miles inside | State highway office |
| Union Pacific | Railroad | 0.64 track miles inside | The railroad |
| Arana Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
| Salado Creek | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
| Los Olmos Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.64 track miles inside Riviera on its Brownsville Subdivision. Public mapping shows 2 street and rail crossings in the community, so a proposed route needs to account for the track. Arana Creek is 0.5 miles from the mapped community boundary, with Salado Creek and Los Olmos Creek also nearby. No named stream crossings by streets are mapped inside the community, and no lakes or ponds are mapped within one mile.
Do I need a permit to bore in Riviera or Kleberg County?
Riviera has no city government, so its streets are managed by Kleberg County or the state, depending on the road. US 77, FM 771 and Texas State Highway 285 are state routes; work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Corpus Christi District. The line owning utility, not our crew, submits the application through TxDOT’s online RULIS system, and we prepare the bore plan and profile for that filing. A crossing of the Union Pacific track needs that railroad’s agreement. Arana Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Kleberg County near Riviera?
The Riviera Water Control and Improvement District operates a groundwater well system. Public records list 312 service connections serving 936 people, a network that matters when routing a new water line near 8th Street. AEP Texas Central and Nueces Electric Cooperative report electric service in Kleberg County. Those county reports do not identify the provider at every address, so we confirm the line owner before planning an electric conduit bore near US 77.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Riviera Water Control and Improvement District | Public water system | Groundwater wells | 312 connections, 936 people served |
| AEP Texas Central and Nueces Electric Cooperative | Electric utilities reporting service in Kleberg County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Riviera’s median housing year at 1996; 16 percent of homes were built before 1960, 40 percent from 1960 to 1999 and 44 percent in 2000 or later. That mix can mean replacement work as well as new service routes along 8th Street. Before drilling near a marked line, we use hydrovac potholing to expose it; paint shows position, not depth.

How far is Riviera from Sarita and the Yukon yard?
Riviera is in Kleberg County, with an elevation of 31 feet and a land area of 3.69 square miles. Its ZIP code is 78379. Sarita is 5.3 miles south, Ricardo is 8.8 miles north and Kingsville is 15.0 miles north; Kingsville is both the nearest larger city and the county seat. The Yukon yard is 627 road miles away, a 12.2 hour drive. Those distances matter when scheduling a bore on US 77 or a rural route near Sarita.
Places near Riviera
- Directional boring in Sarita: 5.3 miles south
- Directional boring in Ricardo: 8.8 miles north
- Directional boring in Kingsville: 15 miles north
- Directional boring in Flowella: 17.3 miles west
- Directional boring in Airport Road Addition: 19.2 miles west
What kinds of bores fit Riviera routes near 8th Street?
- Highway crossing: A route beneath US 77 needs a bore plan that accounts for the travel lanes and the state right of way.
- Water service: A new connection near 8th Street can be routed around existing lines tied to the Riviera Water Control and Improvement District system.
- Fiber conduit: A run along North Boulevard needs its alignment checked against marked utilities before the drill moves through the mapped street corridor.
- Creek crossing: A proposed line near Arana Creek needs a planned path and a jurisdiction check during crossing review.
- Rail crossing: A route under the Union Pacific Brownsville Subdivision needs an agreement from the track owner before the crossing is set.
- Street service: A short connection on 7th Street can use a bore to avoid opening the street surface along the planned path.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Riviera bore near 7th Street?
For a Riviera bore, send us the map pin or address first so we can review the route. The exact spot matters near 7th Street because the route may meet other streets or a utility corridor before reaching the connection point. We also need what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help show the proposed alignment and any crossings.
The price follows the ground, crossings and logistics of the specific Riviera route. Palobia soil and the sandy clay loam below it affect drilling and reaming; pipe size, length and any rock also matter. Crossings or exposed utilities near US 77, the Union Pacific track or a creek can add work, as can pavement, pits, excavator time and sand backfill. High profile or emergency work changes the scope. Mobilization also has to account for the 627 road miles from Yukon.
Questions people ask about boring in Riviera
Does Trinity Boring Solutions take jobs in Riviera, Kleberg County, and who staffs them?
Yes. We take directional boring work in Riviera, Kleberg County, and Texas. Our own crews and partner drilling contractors from satellite yards Trinity has vetted handle the field work, while you deal with Trinity through the job and bore log. That keeps the contact consistent for a route near 8th Street.
Will a Riviera bore hit rock below Palobia soil?
The USDA soil survey does not map bedrock in Riviera’s top five feet, but that does not rule out rock deeper down. Its geology map shows Holocene age Eolian Sheet Sand, described as sand, clay and silt. A proposed bore near US 77 still needs a route plan suited to the actual ground encountered.
Who approves a Riviera bore under US 77, and which state office reviews it?
TxDOT reviews work in the US 77 right of way through its Corpus Christi District. The utility that owns the line submits the utility permit application in TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing. The permit covers the proposed highway crossing, not unrelated work on 8th Street.
What does a Riviera bore under the Union Pacific track require?
A crossing under the Union Pacific Brownsville Subdivision requires an agreement from the railroad that owns the track. For a Riviera crossing, we use the agreement’s casing, depth and flagging conditions to plan the bore. The track runs 0.64 miles inside Riviera, so the planned bore route needs to show where it would pass beneath the line.
Can a line be bored under Arana Creek near Riviera?
A bore can be planned for a crossing near Arana Creek, which is 0.5 miles from Riviera’s mapped community boundary. Before planning a Riviera crossing, we check whether the US Army Corps of Engineers has jurisdiction. The route and ground conditions then inform the bore plan rather than assuming a creek crossing is clear.
As we plan work in Riviera, who runs Riviera’s public water system, and where does its water come from?
The Riviera Water Control and Improvement District runs the public water system, which draws from groundwater wells. Riviera public records list 312 service connections and 936 people served, figures we consider when planning underground work. Those existing connections matter when planning another water line near 8th Street, and the specific line location needs to be checked along the proposed bore path.
Does Trinity cover Sarita and rural sites outside Riviera?
Yes. We take work across Texas, including routes near Sarita and rural sites outside Riviera’s mapped community boundary. Sarita is 5.3 miles south of Riviera, and a route in that area can be scoped from its address or map pin, line type, size and footage.
How much notice does Texas811 need for a Riviera bore on 8th Street, and what if marks move?
For work on 8th Street, make the Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If our Riviera start moves more than 14 days beyond the original notice, we submit a new request. Before work continues in Riviera, we arrange to have worn or moved marks refreshed through Texas811.
What affects the price of a Riviera directional bore near US 77?
The job’s length and pipe size matter, along with Riviera’s sandy clay loam, rock and the utilities to cross or expose. Pavement, pits, excavator time, sand backfill and a crossing near US 77 or the Union Pacific track can affect the work. Mobilization also reflects the distance from the Yukon yard.
Where the Riviera facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Riviera
- U.S. Census Bureau, TIGER/Line 2024: Riviera boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Riviera population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Riviera housing units and year built
- Macrostrat geologic map compilation: map units under Riviera
- U.S. EPA Safe Drinking Water Information System: public water systems serving Riviera
- U.S. Department of Transportation, North American Rail Network: track owners in Kleberg County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Kleberg County
- U.S. Geological Survey, Elevation Point Query Service: Riviera elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Riviera
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Riviera
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Riviera, Texas
Type the address of your job in Riviera. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Riviera
All counties: Texas county list.
