Mount Calm Texas Directional Boring: Wilson Clay, FM 339 And Packwood Creek
Quick Answer: Along FM 339, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for lines that need to pass beneath the roadway. Mount Calm is 297 road miles from our Yukon, Oklahoma main office, so we plan crew travel around the job on FM 339 or a local street. Wilson clay loam covers much of the city, and sticky clay can build up on a reamer. We use staged reaming and manage drilling fluid to keep the bore controlled.
Mount Calm bores at a glance
- Incorporated city in Hill County, Texas. Population 319 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 297 miles, about 5.8 hours of driving.
- Ground: Wilson soil is mapped on 49 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 26 percent of the area.
- Highways inside the boundary: FM 339 and Texas State Highway 31. State permit office: TxDOT Waco District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Mount Calm, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who handles directional boring in Mount Calm and Hill County?
We take directional boring work in Mount Calm, in Hill County, where the Census Bureau Vintage 2024 estimate puts the population at 319. A water service could run beneath 1st Street, while fiber or electric conduit may follow another local route. We also bore for sewer and gas lines, planning the path around the street and the marked utilities in its way.
Our main office is in Yukon, Oklahoma, and Mount Calm work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, with directional boring work dating to 1982. Our range runs from 3/4 inch service lines to 48 inch casing, giving us options for the streets and FM 339 in Mount Calm.

What is Mount Calm ground like for a bore through Wilson soil?
The USDA soil survey maps Wilson soil across 49 percent of Mount Calm, with Wilson clay loam map units covering 28 percent and 21 percent of the city. Surface texture is clay loam across 60 percent and clay across 20 percent. At about 40 inches below the surface, the survey maps clay across 98 percent of the area, with an average clay content of 47 percent. We use Wilson, Crockett, Normangee, and Heiden soil patterns for planning, not as substitutes for test borings. Sticky clay can cling to the reamer and grip a pipe, so we plan a staged cut and keep the fluid suited to the ground.
| USDA soil survey, inside the Mount Calm city limits | What is mapped |
|---|---|
| Soil series mapped | Wilson 49 percent, Crockett 14 percent, Normangee 11 percent, Heiden 9 percent and Mabank 5 percent |
| Texture at the surface | clay loam 60 percent, clay 20 percent and fine sandy loam 19 percent |
| Texture about 40 inches down | clay 98 percent |
| Engineering class about 40 inches down | fat clay (CH) 93 percent and lean clay (CL) 6 percent |
| Average clay content about 40 inches down | 47 percent |
| Bedrock mapped within 60 inches | 26 percent of the area (0 percent hard rock, 26 percent weathered rock) |
| Seasonal water table within 60 inches | 21 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 98 percent of the area |
The USDA survey maps weathered bedrock within 60 inches in 26 percent of Mount Calm, but hard bedrock is not mapped at that depth. Seasonal water tables are mapped within 60 inches in 21 percent, so pits may need pumping after wet weather. Near Packwood Creek, we treat mapped soil information as excluding flood prone soils when planning a bore. High steel corrosion risk covers 98 percent of the mapped area, which matters for casing and tracer wire choices. The Wolfe City Formation, of Phanerozoic age, includes sandstone, mudstone and claystone; the map is not a site specific rock test.
How do we plan directional boring through clay loam along 4th Street in Mount Calm?
Wilson clay loam and clay mapped at about 40 inches make a bore on 4th Street a job for controlled fluid and staged cutting. We track the drill as it advances and adjust to the ground.
- Wilson clay can cling to the reamer, so we use a thinner drilling fluid with polymer and open the bore in stages near 4th Street.
- With heavy clay mapped at depth in Mount Calm, we watch fluid returns closely and keep pressure controlled to avoid lifting pavement on FM 339.
- Before drilling near a marked line on 1st Street, we hydrovac pothole it because surface paint does not show the utility’s depth.
- For a route toward Packwood Creek, we track the drill head from the surface and log depth and pitch as the bore advances.

What might a new line cross near Mount Calm and Packwood Creek?
FM 339 and Texas State Highway 31 run inside Mount Calm, with 1.2 mapped roadway miles of FM 339 and 0.5 miles of Highway 31. A bore along either state route needs a path planned for the highway right of way. On the local street grid, 4th Street is the longest named street at 0.95 miles, followed by 1st Street at 0.92 miles and 3rd Street at 0.86 miles. We can plan a bore beneath pavement rather than cut across it, subject to the applicable road approval.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| FM 339 | State highway | 1.2 roadway miles inside | State highway office |
| Texas State Highway 31 | State highway | 0.5 roadway miles inside | State highway office |
| Packwood Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Navasota River | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
| Williams Creek | Stream nearby | 1 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Mount Calm or within one mile outside its limits, and no mapped street and rail crossings are listed. Packwood Creek is 0.4 miles from the city limits; the Navasota River is 0.9 miles away and Williams Creek is 1.0 mile away. No named stream crosses a mapped city street, though the city has 0.59 miles of unnamed drainage. A planned creek crossing needs a check for federal jurisdiction.
Who approves a bore beneath FM 339 in Mount Calm?
FM 339 and Texas State Highway 31 are state routes, so a bore in their right of way needs a TxDOT utility permit. The TxDOT Waco District reviews the application. The utility that owns the line submits it through TxDOT’s online RULIS system, while we prepare the bore plan and profile and work under the owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, and a crossing needs the cover depth set for the line type in the permit. Mount Calm’s local streets belong to the city. Packwood Creek is outside the limits, so a planned water crossing is checked for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the water lines near City of Mount Calm in Mount Calm?
The City of Mount Calm public water system uses groundwater wells and has 158 service connections serving 474 people. That gives a water service bore on 1st Street a local system to coordinate with, but the line owner and exact route still need confirmation. Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative report electric service in Hill County. We confirm the electric line owner for the address before planning conduit.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Mount Calm | Public water system | Groundwater wells | 158 connections, 474 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power, HILCO Electric Cooperative, Navarro County Electric Cooperative and Navasota Valley Electric Cooperative | Electric utilities reporting service in Hill County | EIA Form 861 | Confirm the line owner by address |
Mount Calm’s median housing year is 1992 in the 2019 to 2023 American Community Survey five year estimates, so we verify conditions for underground work. The estimates say 27 percent of units were built before 1960, 55 percent from 1960 to 1999 and 18 percent in 2000 or later. A bore on 4th Street could serve a replacement line or a newer connection. We hydrovac expose each marked utility on the planned path before drilling near it, since locate marks show position rather than depth.

What places near Hubbard can we reach from Mount Calm?
Mount Calm is an incorporated city in Hill County, at an elevation of 606 feet and covering 0.82 square miles. Its ZIP code is 76673. Penelope is 7.3 miles north, Hubbard is 7.9 miles northeast, and Leroy is 8.4 miles west. Hillsboro, the county seat, is 22.1 miles northwest; Lacy-Lakeview is the nearest larger city, 15.7 miles southwest. Our Yukon yard is 297 road miles away, a 5.8 hour drive, so mobilization is part of planning a bore on FM 339 or a Mount Calm street.
Places near Mount Calm
- Directional boring in Penelope: 7.3 miles north
- Directional boring in Hubbard: 7.9 miles northeast
- Directional boring in Leroy: 8.4 miles west
- Directional boring in Malone: 11.1 miles north
- Directional boring in West: 12.9 miles west
- Directional boring in Lacy-Lakeview: 15.7 miles southwest
What could we bore near 1st Street in Mount Calm?
- Highway crossing: A line beneath FM 339 needs a planned bore through the state right of way, with the utility owner handling the TxDOT permit.
- Water service: A service near 1st Street can connect toward the City of Mount Calm system, which draws from groundwater wells.
- Fiber conduit: A route under 4th Street can keep a new conduit below the roadway instead of opening the pavement.
- Drainage crossing: A bore planned toward Packwood Creek needs the channel and the route checked during design.
- Electric conduit: Before placing conduit along Seeley Avenue, we confirm the electric line owner and expose marked utilities on the bore path.
- Sewer line: A sewer route near Texas State Highway 31 needs its path planned around the state roadway and nearby marked lines.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Mount Calm bore near 4th Street?
For a proposed crossing near Penelope, we ask for a map pin or address before planning the bore. On 4th Street, an exact spot helps us see whether the route approaches a city street, FM 339 or the drainage toward Packwood Creek. For a Texas State Highway 31 crossing, we need the underground material, pipe or conduit size, and footage before planning. A sketch or plans help us check the proposed route and access.
The 297 road miles from Yukon affect mobilization for a Mount Calm job. Wilson clay can call for staged reaming and careful fluid control, while a route near FM 339 brings highway permit planning into the scope. We also account for length, pipe size, marked utilities to expose, pavement, drainage crossings, pits, excavator time and backfill. Emergency timing or a difficult access plan can change the work involved.
Questions people ask about boring in Mount Calm
Does Trinity take directional boring jobs in Mount Calm and Hill County?
Yes. We take work in Mount Calm and Hill County, with the Yukon office coordinating the job whether our own crew or a vetted partner contractor is on site. We stay involved from the first call through the bore log. A bore along FM 339 or 1st Street is planned around its route and scope.
Could wet ground near Packwood Creek affect a Mount Calm bore pit?
It can. The USDA survey maps seasonal water tables within 60 inches in 21 percent of Mount Calm, so a pit near a route toward Packwood Creek may need pumping if it fills. Flood prone soils are not mapped in the city. We check the actual bore location and plan pit size and access accordingly.
Does Wilson soil in Mount Calm create a steel corrosion concern?
Yes. High steel corrosion risk is mapped across 98 percent of Mount Calm, so the line owner should consider material choices for steel casing and tracer wire. Along Seeley Avenue, we specify HDPE where appropriate because it does not share the steel corrosion concern. A Wilson clay loam map unit describes mapped soil, not a site specific material test.
What ground does a bore pass through in Mount Calm near Wilson soil?
The USDA survey maps Wilson soil across 49 percent of Mount Calm, and clay across 98 percent of the mapped area at about 40 inches below the surface. That heavy clay can stick to the reamer and grip pipe. We use staged reaming and manage fluid so the bore stays controlled.
Is there rock within five feet of a Mount Calm bore?
Weathered bedrock is mapped within 60 inches in 26 percent of Mount Calm, while hard bedrock is not mapped at that depth. The Wolfe City Formation includes sandstone, mudstone and claystone. A site check still matters before choosing tooling for a bore on 4th Street.
Who approves a Mount Calm bore under FM 339?
TxDOT reviews a utility owner’s permit application for work in the FM 339 right of way through the Waco District. The utility owner files through RULIS, and we provide the bore plan and profile for that application. A bore beneath existing highway pavement uses boring or tunneling under TxDOT rules.
Does Mount Calm service extend to Penelope and rural sites?
We take directional boring work outside Mount Calm as well, including jobs around Penelope and rural sites in Hill County. Penelope is 7.3 miles north of the city. The route, access and ground at each address determine how we plan the bore.
How early should I call Texas811 for a Mount Calm bore on 4th Street?
Request a Texas811 locate at least 48 hours before excavation, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a 4th Street start moves more than 14 days past the original notice, make a new request. On 2nd Street, we have worn or moved marks refreshed through Texas811 before our work continues.
What affects directional boring cost near FM 339 in Mount Calm when a TxDOT Waco District permit is needed?
The job details drive the price: bore length, pipe or conduit size, Wilson clay, marked utilities to expose, pavement, pits, backfill and any drainage crossing. A route in the FM 339 right of way also needs permit planning. The 297 road miles from Yukon affect mobilization, along with access and timing.
Where the Mount Calm facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Mount Calm
- U.S. Census Bureau, TIGER/Line 2024: Mount Calm boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Mount Calm
- U.S. Census Bureau, American Community Survey 2019 to 2023: Mount Calm housing units and year built
- Macrostrat geologic map compilation: map units under Mount Calm
- U.S. EPA Safe Drinking Water Information System: public water systems serving Mount Calm
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hill County
- U.S. Geological Survey, Elevation Point Query Service: Mount Calm elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Mount Calm
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Mount Calm
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Mount Calm, Texas
Type the address of your job in Mount Calm. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.