St. Hedwig Texas Directional Boring: Wilco Loamy Fine Sand, US 87 and Martinez Creek
Quick Answer: We take directional boring work in St. Hedwig, also called horizontal directional drilling (HDD), including routes beneath Martinez Creek. From our Yukon office, the 484 road miles to St. Hedwig mean our own crews and vetted partner crews support work near US 87. The USDA soil survey maps sandy clay loam at about 40 inches across 54% of the area, so crews must manage sticky soil around the reamer. Graytown Road is one local route where a bore can avoid cutting pavement.
St. Hedwig bores at a glance
- Incorporated city in Bexar County, Texas. Population 2,377 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 484 miles, about 9.1 hours of driving.
- Ground: Wilco soil is mapped on 21 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: US 87, FM 1518, FM 1346 and Loop 1604. State permit office: TxDOT San Antonio District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Martinez Creek, Dry Hollow Creek, Salitrillo Creek and Women Hollow Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near Graytown Road in St. Hedwig?
At 484 road miles from Yukon, we serve St. Hedwig with our own crews and vetted partner drilling crews. The Census Bureau Vintage 2024 estimate puts the town at 2,377 people. We install water, sewer, gas, electric conduit and fiber, with routes planned beneath local streets such as Graytown Road or alongside US 87 to reach a service connection.
Our main office is in Yukon, Oklahoma, and St. Hedwig work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965 and has drilled directionally since 1982. We have had no utility strike in over 25 years, a record that makes careful checks along Graytown Road and coordination with Bexar County electric line owners especially important.

What do Wilco soils indicate for boring plans in St. Hedwig?
The USDA soil survey maps Wilco as the largest soil series, covering 21% of St. Hedwig. Wilco loamy fine sand is mapped across 15% of the area, while the leading surface texture is fine sandy loam at 33%. At about 40 inches below the surface, sandy clay loam covers 54% and clay covers 22%; the mapped average clay content is 38%. We use mapped Wilco and Miguel soil patterns as planning context, not as a substitute for test borings. The clay share can make a reamer sticky and may grip pipe during pullback.
| USDA soil survey, inside the St. Hedwig city limits | What is mapped |
|---|---|
| Soil series mapped | Wilco 21 percent, Miguel 16 percent, Floresville 15 percent, San Antonio 14 percent and Houston Black 8 percent |
| Texture at the surface | fine sandy loam 33 percent, loamy fine sand 21 percent and clay loam 20 percent |
| Texture about 40 inches down | sandy clay loam 54 percent, clay 22 percent and clay loam 14 percent |
| Engineering class about 40 inches down | lean clay (CL) 38 percent, fat clay (CH) 37 percent and clayey sand (SC) 21 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 11 percent of the area |
| High corrosion risk for uncoated steel | 43 percent of the area |
The soil survey maps bedrock within 60 inches in 1% of the area, with typical bedrock depth listed as 14 inches, so the route needs site specific checks rather than an assumption about rock. A seasonal water table within 60 inches is not mapped, while flood prone soils cover 11%. High steel corrosion risk covers 43%, a concern for steel casing and tracer wire that the line owner should address. The Wilcox Group, undivided, is mapped here and dates to the Ypresian; its mudstone, sandstone, shale and siltstone make ground conditions worth checking along Martinez Creek.
How do crews bore sandy clay loam in St. Hedwig?
Sandy clay loam is mapped at about 40 inches across 54% of St. Hedwig. We adjust fluid and reaming to the actual ground, then keep the pullback and nearby crossings in view.
- Fluid control: Where St. Hedwig’s mapped sandy clay loam and clay occur, we manage returns to limit pressure that could lift pavement or slabs.
- Staged reaming: Sticky clay around the Wilco soil areas can ball on the reamer, so crews enlarge the hole in stages and prepare pipe for pullback.
- Utility exposure: Before drilling near a marked line along Abbott Road or another route, we hydrovac pothole to verify its depth and position.
- Creek planning: For a Martinez Creek route, we plan the bore to pass beneath the channel and check for possible U.S. Army Corps of Engineers jurisdiction.

Where might a bore pass beneath US 87 in St. Hedwig?
US 87 has 1.4 mapped roadway miles inside St. Hedwig, while FM 1518 has 11.4 and FM 1346 has 7.7. Loop 1604 adds 1.8 miles inside town. Interstate 10, US 90 and Loop 107 are each about 1.0 mile outside the limits. Graytown Road is the longest named street at 5.63 miles within town; Abbott Road covers 5.32 miles and La Vernia Road 4.66 miles. A bore can keep those road surfaces uncut, subject to the route and permits.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 87 | US highway | 1.4 roadway miles inside | State highway office |
| FM 1518 | State highway | 11.4 roadway miles inside | State highway office |
| FM 1346 | State highway | 7.7 roadway miles inside | State highway office |
| Loop 1604 | State highway | 1.8 roadway miles inside | State highway office |
| Loop 107 | Highway nearby | 1 miles outside | State highway office |
| Interstate 10 | Highway nearby | 1 miles outside | State highway office |
| US 90 | Highway nearby | 1 miles outside | State highway office |
| Martinez Creek | Stream | 10.16 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Dry Hollow Creek | Stream | 3.91 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Salitrillo Creek | Stream | 1.13 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Women Hollow Creek | Stream | 0.4 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Cibolo Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Womans Hollow Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Cibola Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside St. Hedwig or within one mile outside its limits, so public mapping identifies no nearby track crossing. Martinez Creek runs 10.16 channel miles within town, and 12 mapped street crossings cross named streams. Dry Hollow Creek, Salitrillo Creek and Women Hollow Creek are also mapped locally. We see no mapped lakes or ponds within one mile of St. Hedwig, while Martinez Creek still calls for crossing review. Creek routes need depth planning, and Martinez Creek crossings are checked for possible federal water jurisdiction during planning.
Who approves a bore in Bexar County near St. Hedwig?
St. Hedwig is incorporated, so its local streets, including Graytown Road, belong to the town. US 87, FM 1518 and FM 1346 are state routes, and utility work in their right of way needs a TxDOT utility permit. At US 87 crossings, TxDOT San Antonio District reviews the permit; we coordinate our bore plan with that process. The utility that owns the line submits the application through TxDOT’s RULIS system; we provide the bore plan and profile and work under the permit issued to that owner. A Martinez Creek route is checked during planning for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities may have lines in Bexar County near St. Hedwig?
The water provider for a specific Graytown Road address has to be confirmed with the city, the county or the local water district before a bore is planned. EPA drinking water records for Texas do not tie water systems to towns, so the provider cannot be matched from those records alone. We use Bexar County electric service reporting, which includes the City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative. The line owner must be confirmed before a conduit bore near US 87.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of San Antonio, Bandera Electric Cooperative, Guadalupe Valley Electric Cooperative, Karnes Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Bexar County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put St. Hedwig’s median housing year at 2000. The estimates show 7% of homes built before 1960 and 50% built in 2000 or later, but those figures do not date buried lines. An Abbott Road replacement bore may follow older infrastructure or serve newer construction. Along Graytown Road, we hydrovac pothole every marked utility on the bore path before drilling near it; paint shows position, not depth.

Where is St. Hedwig in relation to Converse and Yukon?
St. Hedwig is an incorporated town in Bexar County, with an area of 29.63 square miles and an elevation of 602 feet. We plan St. Hedwig underground work with both ZIP codes, 78152 and 78101, in the project details. Zuehl is 6.7 miles northeast, La Vernia is 6.7 miles southeast, and Converse is 8.7 miles northwest. San Antonio, the county seat, is 19.3 miles west. From our Yukon yard, the road trip to St. Hedwig is 484 miles and about 9.1 hours, a distance that can affect crew mobilization for work near US 87.
Places near St. Hedwig
- Directional boring in Zuehl: 6.7 miles northeast
- Directional boring in La Vernia: 6.7 miles southeast
- Directional boring in New Berlin: 7.6 miles northeast
- China Grove: 8.6 miles west
- Directional boring in Converse: 8.7 miles northwest
What kinds of bores come up near Martinez Creek in St. Hedwig?
- Highway crossing: A bore beneath US 87 needs a route and profile that meet the TxDOT permit for the highway right of way.
- Street service: A water or sewer service beneath Graytown Road can avoid an open cut across the road surface.
- Creek crossing: A Martinez Creek bore needs a planned path below the channel and a check for possible federal water jurisdiction.
- Fiber route: Conduit along FM 1518 can carry fiber while a bore avoids cutting the roadway at the crossing.
- Acreage service: A longer service near Gable Road can use a bore sized to the pipe, ground and available access.
- Electric conduit: Near La Vernia Road, confirm the line owner before setting conduit size and planning the bore.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Gable Road in St. Hedwig?
A map pin for Gable Road helps us see the exact route and nearby access. For a La Vernia Road crossing, send us the material going underground, pipe or conduit size, and footage. A sketch or plans help us check whether the path approaches Martinez Creek, US 87 or another marked utility.
For an FM 1518 bore, we price the work from the job scope. Soil conditions matter first: the mapped sandy clay loam and clay can call for careful fluid control and staged reaming. The number of exposed utilities and any Martinez Creek crossing also affect the work. Pipe size, footage, pavement, pits, excavator time and sand backfill shape the plan. A US 87 right of way crossing needs its own permit work, and mobilization reflects the 484 road miles from Yukon.
Questions people ask about boring in St. Hedwig
Does Trinity Boring Solutions take jobs in Bexar County near St. Hedwig, and who staffs them?
Yes. We take directional boring work in St. Hedwig, and the job is handled by our own crews or vetted partner drilling crews working from satellite yards. You deal with Trinity from the first call through the bore log, whether the route is near Graytown Road or US 87.
Who approves a bore under US 87 in St. Hedwig, and which state office reviews it?
The utility that owns the line submits the right of way application through TxDOT’s RULIS system. The TxDOT San Antonio District reviews a US 87 crossing in St. Hedwig. When planning a bore near FM 1346, we prepare the bore plan and profile and work under the permit issued to the utility owner.
Can a line be bored under Martinez Creek in St. Hedwig?
A bore under Martinez Creek can be planned, with the route and depth set for the channel crossing. The creek runs 10.16 channel miles within St. Hedwig, and the crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction.
Which electric company owns a line in Bexar County near St. Hedwig, and who confirms conduit specs?
The specific line owner has to be confirmed for the address before a conduit bore. Electric service reporting in Bexar County includes the City of San Antonio and four cooperatives: Bandera Electric, Guadalupe Valley Electric, Karnes Electric and Pedernales Electric. Confirm conduit requirements with the line owner for the route near US 87.
Who is in charge of La Vernia Road in St. Hedwig, and does a bore cut the street?
La Vernia Road is a town street because St. Hedwig is incorporated. A directional bore can pass beneath its pavement without an open cut, depending on the route and approvals. The street extends 4.66 mapped miles within town, so an exact location helps define the crossing.
Do homes and buried lines near Abbott Road in St. Hedwig have the same age?
No. The American Community Survey 2019 to 2023 estimates put the median housing year at 2000, with 7% of homes built before 1960, but they do not date buried lines. For a replacement bore near Abbott Road, marked utilities are pothole exposed before drilling close to them.
How far is St. Hedwig from Yukon, and does the distance from Converse affect a job?
St. Hedwig is 484 road miles and about 9.1 drive hours from our Yukon yard. Converse is 8.7 miles northwest of town, but the Yukon distance is what can affect mobilization. A route near Converse or Graytown Road still needs its own site and access details.
How much notice does Texas811 need for a bore near Graytown Road in St. Hedwig?
Paint near Graytown Road shows a marked line’s position, not its depth. Texas law requires a Texas811 request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If the start slips more than 14 days past the notice, request a new ticket; refresh worn or moved marks before work continues.
What affects the cost of a directional bore under US 87 in St. Hedwig?
The job scope sets the price, with soil and crossing conditions leading the estimate. Sandy clay loam mapped beneath St. Hedwig may affect reaming, while US 87 adds permit planning. Pipe size, footage, exposed utilities, pavement, creek crossings, pits and excavator time also matter. Mobilization accounts for the 484 road miles from Yukon.
Where the St. Hedwig facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside St. Hedwig
- U.S. Census Bureau, TIGER/Line 2024: St. Hedwig boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: St. Hedwig
- U.S. Census Bureau, American Community Survey 2019 to 2023: St. Hedwig housing units and year built
- Macrostrat geologic map compilation: map units under St. Hedwig
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Bexar County
- U.S. Geological Survey, Elevation Point Query Service: St. Hedwig elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to St. Hedwig
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in St. Hedwig
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in St. Hedwig, Texas
Type the address of your job in St. Hedwig. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for St. Hedwig
Same county: San Antonio · Universal City · Live Oak · Timberwood Park · Leon Valley · Helotes · Lackland AFB · Kirby · Selma · Alamo Heights · Fair Oaks Ranch · Schertz. All counties: Texas county list.