Morton Texas Directional Boring: Amarillo Soil, Sandy Clay Loam, Texas State Highway 114

Quick Answer: What does the top five feet of ground look like in Morton, and what lies below? The USDA soil survey maps Amarillo fine sandy loam, with sandy clay loam at about 40 inches. At Texas State Highway 114, we handle directional boring, also called horizontal directional drilling (HDD), to carry lines beneath the road. Morton is 388 road miles from our Yukon, Oklahoma main office. That sandy clay loam can hold an open hole and grip pipe, so staged reaming and a timely pull matter.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Morton bores at a glance

  • County seat of Cochran County, Texas. Population 1,712 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 388 miles, about 7.3 hours of driving.
  • Ground: Amarillo soil is mapped on 84 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 114, Texas State Highway 214 and FM 1780. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Morton, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring under Texas State Highway 114 in Morton?

We take directional boring work in Morton, the Cochran County seat, including routes beneath Texas State Highway 114 and along 1st Street. The Census Bureau Vintage 2024 estimate puts the city population at 1,712. Our crews install water, sewer, gas, electric conduit and fiber, routing each line to suit the planned connection and the streets or highway it must cross.

Our main office is in Yukon, Oklahoma, and Morton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Along 1st Street, our record is more than 25 years without a utility strike, a useful discipline near City of Morton water lines. Our family business began in 1965, and we have handled directional boring since 1982.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Amarillo soil affect a directional bore in Morton?

The USDA soil survey maps Amarillo soil across 84% of Morton and Midessa across 13%. Fine sandy loam is the mapped surface texture for 98% of the city. At about 40 inches below the surface, 99% is mapped as sandy clay loam, with an average clay content of 26%. We treat Morton’s Amarillo and Midessa maps as soil patterns, not test borings, when planning a bore. For a route near 2nd Street, the sandy clay loam matters because clay can stay around the reamer and grip the pipe as it is pulled.

USDA soil survey, inside the Morton city limitsWhat is mapped
Soil series mappedAmarillo 84 percent and Midessa 13 percent
Texture at the surfacefine sandy loam 98 percent
Texture about 40 inches downsandy clay loam 99 percent
Engineering class about 40 inches downlean clay (CL) 98 percent
Average clay content about 40 inches down26 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

The USDA soil survey does not map bedrock, seasonal water table, flood prone soils or high steel corrosion risk in the top five feet of Morton. That does not rule out rock deeper down, so the Blackwater Draw Formation, a Cenozoic unit, and mapped Paleocene sedimentary rocks still matter to planning. The Blackwater Draw description includes sand with silty and locally clayey material. In Morton’s clay bearing ground, we control fluid and ream in stages rather than assuming a dry, uniform hole.

How do crews handle sandy clay loam in Morton?

Morton’s mapped sandy clay loam can hold its shape, then cling to the reamer or pipe. On a route near Texas State Highway 214, we match fluid, reaming and pull timing to the ground.

  1. Because Morton is mapped largely as fine sandy loam at the surface, we adjust drilling fluid to the route instead of treating every street as the same ground.
  2. Where sandy clay loam is mapped at about 40 inches, we ream in stages and prepare the pipe so it can be pulled before the hole tightens.
  3. Near Texas State Highway 114 pavement, we keep fluid pressure controlled and track depth and pitch as the bore advances beneath the road.
  4. Before the drill approaches marked water or electric lines near 1st Street, we hydrovac pothole to check their actual depth and position.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a Morton line pass beneath 1st Street?

Texas State Highway 114 and Texas State Highway 214 each have 1.4 mapped roadway miles inside Morton. FM 1780 has 0.5 mile. The city has 39.12 public road centerline miles; among its longer named streets are 1st Street at 2.53 miles, 2nd Street at 2.26 miles and 8th Street at 2.02 miles. A bore beneath one of these roads can keep pavement intact, but the route and entry pits still need to fit the road and available work area.

CrossingTypeMapped extentWho has a say
Texas State Highway 114State highway1.4 roadway miles insideState highway office
Texas State Highway 214State highway1.4 roadway miles insideState highway office
FM 1780State highway0.5 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Morton or within one mile outside its limits, so a mapped rail crossing is not part of the city route picture. No named stream or street crossing of a named stream is mapped in the city either. The map shows 0.34 mile of unnamed drainage, with no lakes or ponds within one mile. A proposed route near that drainage still needs site specific review before the bore path is set.

Who approves a Morton bore in Cochran County?

For work in the right of way of Texas State Highway 114, Texas State Highway 214 or FM 1780, the line owner files the utility permit through TxDOT’s online RULIS system, not the driller. The TxDOT Lubbock District reviews it. For a Texas State Highway 114 crossing in Morton, we give the utility owner our bore plan and profile and work under its permit. TxDOT’s cover rules set 60 inches at highway crossings for electric, communications and water lines; water running along the right of way needs 36 inches, while electric and communications need 48 inches. Pressurized sewer crossings need 60 inches, subject to the permit.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What lines are already in the ground near City of Morton?

The local government owned City of Morton public water system draws from groundwater wells and serves 1,608 people through 685 service connections. Electric service reporting for Cochran County includes Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric Cooperative; records do not assign one provider to every address. Before a conduit bore near City of Morton water lines or along 1st Street, we identify the electric line owner for the specific route.

Line ownerWhat it isSourceSize
City of MortonPublic water systemGroundwater wells685 connections, 1,608 people served
Southwestern Public Service, Bailey County Electric Cooperative Association, Lamb County Electric Cooperative and Lea County Electric CooperativeElectric utilities reporting service in Cochran CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Morton’s median housing year at 1966, informing our planning near 1st Street. The estimates show 35% of homes built before 1960, 55% from 1960 to 1999 and 10% from 2000 onward. That mix can mean a 2nd Street project replaces older service lines or adds a new connection. We hydrovac expose marked lines on the planned path before drilling near them, including City of Morton water lines and identified electric facilities.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Do you cover Morton and nearby Whiteface?

Morton is an incorporated city in Cochran County and the county seat. It covers 1.5 square miles at an elevation of 3,760 feet, with ZIP code 79346. Whiteface is 12.1 miles southeast; Bledsoe is 16.6 miles southwest; Sundown is 24.1 miles southeast; and Levelland, the nearest larger city, is 24.8 miles southeast. From our Yukon, Oklahoma main office, Morton is 388 road miles away, about a 7.3 hour drive. That distance is part of planning mobilization for work on Texas State Highway 114 or a local street.

Places near Morton

Which jobs call for a bore near 2nd Street in Morton?

  • Highway crossing: A line beneath Texas State Highway 114 can be bored under the pavement, with the route and cover planned for the highway right of way.
  • Water service: A connection near the City of Morton system can be routed beneath a local street after the existing water line is exposed.
  • Fiber route: A fiber bore along 2nd Street can avoid an open cut across the street while the crew tracks the planned path.
  • Conduit crossing: Near Texas State Highway 214, an electric conduit route needs the line owner identified before the crossing is planned.
  • Drainage route: A bore near Morton’s mapped unnamed drainage needs a route that accounts for the channel and the available entry area.
  • Street service: A new or replacement line near 6th Street can be bored between pits to leave the pavement uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a Morton bore near 6th Street?

Start with an address or map pin; the exact spot matters if the route approaches 6th Street or Texas State Highway 114. For a bore near Main Street in Morton, tell us what will go in the ground, the pipe or conduit size, and footage. A sketch or plans help us see the route, entry and exit areas, and any marked utilities that need to be exposed.

A direct service route near 6th Street with clear access is simpler to plan than a bore with several exposed utilities or pavement constraints. Price also reflects length, pipe or conduit size, soil, crossings, pits, excavator time and backfill. Morton’s sandy clay loam can affect reaming and fluid needs; a Texas State Highway 114 crossing adds right of way and cover planning. The 388 road miles from Yukon shape how we plan mobilization for Morton boring work.

Questions people ask about boring in Morton

Does Trinity take directional boring jobs in Morton and Cochran County, and who staffs them?

Yes. We take directional boring work in Morton and Cochran County using our own crews and partner contractor satellite yards that Trinity has vetted. You work with Trinity through planning and the bore log, whichever crew is on site. That staffing model supports work on routes such as 1st Street without implying a local office.

What do Morton homes near 2nd Street mean for replacement bores?

Morton’s American Community Survey 2019 to 2023 estimates put the median housing year at 1966, with 35% of homes built before 1960. A bore near 2nd Street may serve a replacement line or a newer connection. We expose marked utilities along the route before drilling so the bore can be planned around existing lines.

What ground does a Morton bore cross in Amarillo soil?

The USDA soil survey maps Amarillo soil over 84% of Morton, with fine sandy loam at the surface across 98% of the city. At about 40 inches, sandy clay loam is mapped across 99%. That clay bearing layer can hold an open hole but cling to the reamer, so staged reaming and pull timing matter.

Will a directional bore in Morton encounter rock beneath fine sandy loam?

Bedrock is not mapped in Morton’s top five feet, but that does not rule out deeper rock. The geologic map identifies the Blackwater Draw Formation, a Cenozoic unit, and Paleocene sedimentary rocks. For a route near Texas State Highway 214, the actual ground still guides bit choice and drilling pace.

For Texas State Highway 114 in Morton, does the TxDOT Lubbock District approve our bore permit?

The utility owner applies for the right of way permit through TxDOT’s RULIS system, and the TxDOT Lubbock District reviews it. We provide the bore plan and profile for the owner’s filing and work under the permit issued to that owner. The highway crossing also has to follow the cover requirements in its permit.

Who runs Morton’s public water system in Cochran County, and where does its water come from?

The local government owned City of Morton public water system uses groundwater wells. Morton’s public water system serves 1,608 people through 685 service connections, a scale we consider when planning underground work along 2nd Street. For a bore near the system’s lines, we locate and expose marked utilities along the route before drilling close to them.

How far is Morton from Trinity’s Yukon office, and does Levelland affect a job?

Morton is 388 road miles and about a 7.3 hour drive from our Yukon, Oklahoma main office. Levelland is 24.8 miles southeast and is the nearest larger city, but it does not replace planning for the Morton jobsite. The distance from Yukon can affect crew mobilization for a bore near 1st Street.

How much notice does Texas811 need for a Morton bore near 1st Street?

For a bore near 1st Street, request locates at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before the start. If work slips more than 14 days past the original notice, submit a new request. Marks that are worn off or moved must be refreshed through Texas811 before work continues.

What affects the cost of a Morton bore near Texas State Highway 114?

The price depends on the route, footage, pipe or conduit size, soil, utility crossings, pavement, pits, backfill and equipment time. A Texas State Highway 114 crossing adds right of way planning, while Morton’s sandy clay loam can affect reaming. Mobilization from Yukon is another job factor because Morton is 388 road miles from the main office.

Where the Morton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Morton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Morton, Texas

Type the address of your job in Morton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.