trinityboringsolutions.com

Big Spring Texas Directional Boring: Potter Soil, Interstate 20 and Beals Creek

Quick Answer: Potter soil is the main mapped soil in Big Spring; gravel can make a drill head wander. Along Interstate 20 and Union Pacific tracks, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Big Spring, Texas. Big Spring is 390 road miles from our Yukon, Oklahoma main office, so mobilization matters on a bore near Beals Creek. At about 40 inches, extremely gravelly fine sandy loam is mapped under 28 percent of the city, and loose gravel can cave behind the bit.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Big Spring bores at a glance

  • County seat of Howard County, Texas. Population 22,541 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 390 miles, about 7.7 hours of driving.
  • Ground: Potter soil is mapped on 28 percent of the area, with extremely gravelly fine sandy loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 15 percent of the area.
  • Highways inside the boundary: Interstate 20, Interstate 20 Business, US 87 Business, FM 700 and Texas State Highway 350. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: Union Pacific and Big Spring Rail, with 9 mapped street and rail crossings.
  • Named streams inside the boundary: Beals Creek, Big Sandy Draw and Little Sandy Draw.
  • Public water: City of Big Spring, surface water.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring in Big Spring, Howard County?

Big Spring is the Howard County seat, with a Census Bureau Vintage 2024 estimate of 22,541 residents. We install water, sewer, gas, electric conduit and fiber along routes such as Marcy Drive and 4th Street, with the bore plan set to the line and nearby crossings.

Our main office is in Yukon, Oklahoma, and Big Spring work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Since 1982, four decades of directional boring have taught us to match tooling and fluid to Big Spring’s mapped gravel and bedrock; our family business began in 1965.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What Potter soil conditions could a bore encounter in Big Spring?

The USDA soil survey maps Potter soil across 28 percent of Big Spring, and gravelly loam is the leading surface texture at the same share. About 40 inches down, extremely gravelly fine sandy loam is mapped under 28 percent of the city. Gravel cuts readily, but it can cave behind the drill head, so the hole needs support as it is opened. Fine sandy loam accounts for 26 percent of surface texture, while the average clay content at about 40 inches is 24 percent. For Big Spring, our mapped patterns guide planning but do not replace test borings.

USDA soil survey, inside the Big Spring city limitsWhat is mapped
Soil series mappedPotter 28 percent, Ector 13 percent, Amarillo 9 percent, Mobeetie 9 percent and Berda 7 percent
Texture at the surfacegravelly loam 28 percent, fine sandy loam 26 percent and loam 21 percent
Texture about 40 inches downextremely gravelly fine sandy loam 28 percent, sandy clay loam 17 percent and clay loam 16 percent
Engineering class about 40 inches downlean clay (CL) 41 percent, GP GC 28 percent and silty clayey sand (SC SM) 9 percent
Average clay content about 40 inches down24 percent
Bedrock mapped within 60 inches15 percent of the area (15 percent hard rock, 1 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils5 percent of the area
High corrosion risk for uncoated steel8 percent of the area

The USDA survey maps bedrock within five feet across 15 percent of Big Spring, with hard bedrock mapped under the same share; typical bedrock depth is 12 inches. That can mean slower drilling or a change in tooling where the bore meets rock. Seasonal water tables are not mapped, while flood prone soils cover 5 percent. High steel corrosion risk is mapped under 8 percent, so the line owner should consider casing and tracer wire materials. The geologic map identifies Early Cretaceous Antlers Sand, described as sand, clay and conglomerate, another reason to plan for changing ground.

How do crews handle extremely gravelly fine sandy loam in Big Spring?

In Big Spring, gravel and the mapped bedrock call for a bore plan that can respond to changing material. We track the drill head and adjust the reaming sequence to the route.

  1. With Potter soil and its gravelly ground, we support the hole as it opens and stage the reaming so loose material has less chance to cave.
  2. Where a Big Spring bore meets mapped bedrock, we allow for slower progress and adjust the tooling to the material along the planned route.
  3. Before drilling near any marked utility on a route by Marcy Drive, we hydrovac pothole it; the locate paint does not show its depth.
  4. On a proposed line under 2nd Street, we track the drill head from the surface and log depth and pitch as the bore advances.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

Which Big Spring crossings near Beals Creek could a bore encounter?

Interstate 20 and Interstate 20 Business run through Big Spring, along with FM 700 and Texas State Highway 350. A bore beneath an existing highway keeps the pavement intact. Marcy Drive is the longest named street in the city at 5.77 miles, followed by Perimeter Road at 5.21 miles and 4th Street at 4.52 miles. Those long routes can involve more than one utility conflict, so we plan the bore path around the marked lines and the street crossing.

CrossingTypeMapped extentWho has a say
Interstate 20Interstate12.4 roadway miles insideState highway office
Interstate 20 BusinessInterstate8.9 roadway miles insideState highway office
US 87 BusinessUS highway5.6 roadway miles insideState highway office
FM 700State highway7.7 roadway miles insideState highway office
Texas State Highway 350State highway2.1 roadway miles insideState highway office
Texas State Highway 176State highway0.5 roadway miles insideState highway office
US 87Highway nearby0.2 miles outsideState highway office
Union PacificRailroad4.97 track miles insideThe railroad
Big Spring RailRailroad1.26 track miles insideThe railroad
Beals CreekStream4.91 channel miles insideChecked for Corps of Engineers jurisdiction
Big Sandy DrawStream0.59 channel miles insideChecked for Corps of Engineers jurisdiction
Little Sandy DrawStream0.15 channel miles insideChecked for Corps of Engineers jurisdiction
Onemile LakeLake or pond97 acres, insideChecked for Corps of Engineers jurisdiction
Threemile LakeLake or pond30 acres, nearbyChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 4.97 track miles inside Big Spring, and Big Spring Rail has 1.26. Public mapping shows 9 street and rail crossings in the city. Beals Creek runs 4.91 channel miles here, and mapped street crossings of named streams total 13. Big Sandy Draw and Little Sandy Draw are also mapped. Onemile Lake and Comanche Lake are inside the city, so a proposed route near a creek or lake needs crossing planning.

Whose permission does a Big Spring bore near Union Pacific need?

Because Big Spring is incorporated, we coordinate city street work with the city that owns those streets. For a bore in the right of way of Interstate 20, FM 700 or another state highway, the line owner applies for a TxDOT utility permit through RULIS; the TxDOT Abilene District reviews it. Cover depends on the line: electric and communication crossings need 60 inches below the lowest crossed grade, while water crossings need 60 inches and pressurized sewer crossings need 60 inches. A crossing of Union Pacific track needs that railroad’s agreement. For Beals Creek, we check for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Big Spring system?

The City of Big Spring public water system uses surface water and reports 11,545 service connections serving 27,282 people. That is useful context for a water service or main route near Marcy Drive, but the line at a specific address still needs to be identified. Oncor Electric Delivery Company and Lyntegar Electric Cooperative report electric service in Howard County; we confirm the line owner before planning an electric conduit bore near 4th Street.

Line ownerWhat it isSourceSize
City of Big SpringPublic water systemSurface water11,545 connections, 27,282 people served
Oncor Electric Delivery Company and Lyntegar Electric CooperativeElectric utilities reporting service in Howard CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Big Spring’s median housing year at 1964. The estimates show 42 percent of housing built before 1960, 47 percent from 1960 to 1999 and 11 percent in 2000 or later. Older blocks around 2nd Street may call for replacement routes as well as new services. Before the drill approaches a marked utility on a Big Spring bore path, we expose it with hydrovac potholing; paint shows position, not depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

What is near Big Spring, including Coahoma?

Big Spring is in Howard County, covers 19.14 square miles and sits at an elevation of 2,512 feet. The city’s ZIP code is 79720, and Big Spring is the county seat. Sand Springs is 8.6 miles east, while Coahoma is 11.1 miles east; Midland, the nearest larger city, is 39.6 miles west. Our Yukon, Oklahoma main office is 390 road miles away, a 7.7 hour drive. That distance is part of planning mobilization for work in Big Spring or along a route toward Coahoma.

Places near Big Spring

What boring work comes up around Marcy Drive in Big Spring?

  • Highway crossing: A bore beneath Interstate 20 keeps the existing pavement uncut, with the route and cover planned for the line being installed.
  • Water service: A connection near the City of Big Spring system needs a route checked against marked utilities before the drill approaches them.
  • Fiber route: A run along Marcy Drive can use a bore to pass beneath pavement without opening a trench through the street.
  • Creek crossing: A route under Beals Creek needs depth planning below the channel and a check for federal jurisdiction during planning.
  • Rail crossing: A proposed bore beneath Union Pacific track needs the railroad’s agreement and a crossing plan for that location.
  • Street service: A new or replacement line near 4th Street can be bored beneath the paved route, with pits placed in the dirt.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Big Spring bore near 2nd Street?

A map pin matters near 2nd Street because the exact route can change which utilities and pavement a bore must pass. For a Big Spring bore, send the address or pin, what is going in the ground, pipe or conduit size, and footage. A sketch or plans help us see the route and any creek, track or highway crossing.

The drive from Yukon is 390 road miles, so mobilization matters for a Big Spring job. The mapped Potter gravel and the bedrock share affect tooling and time. Price also reflects bore length, pipe or conduit size, utilities that must be exposed, pavement, pits and excavator time. A route beneath Interstate 20, across Union Pacific track or near Beals Creek can add crossing planning and work. Emergency or high profile work can change the scope.

Questions people ask about boring in Big Spring

Does Trinity take directional boring work in Big Spring and Howard County?

Yes. We take directional boring work in Big Spring, and our own crews or crews from vetted partner drilling contractors can staff it from satellite yards. Our Yukon office remains the main office, and Trinity stays involved from the first call through the bore log, including work near Marcy Drive.

What is Potter soil like for a bore in Big Spring?

Potter soil is mapped across 28 percent of Big Spring. At about 40 inches, extremely gravelly fine sandy loam is mapped under 28 percent as well. Gravel cuts readily but may cave behind the bit, so the bore needs fluid support and staged reaming. The USDA soil survey describes mapped patterns, not site test results.

How much bedrock is mapped within five feet of a Big Spring bore?

Bedrock is mapped within five feet across 15 percent of Big Spring, and hard bedrock is mapped under the same share. Typical bedrock depth is 12 inches. A bore near Beals Creek or elsewhere may meet rock and need slower drilling or different tooling; the map does not establish conditions at a specific address.

Who approves a Big Spring bore under Interstate 20?

The line owner applies for the TxDOT utility permit in RULIS, and the TxDOT Abilene District reviews it. For an electric or communication line crossing Interstate 20, the stated cover requirement is 60 inches below the lowest point of crossed grade. We prepare the bore plan and profile for the owner’s application and work under its permit.

What does a Big Spring bore beneath Union Pacific track require?

A bore under Union Pacific track needs an agreement from the railroad that owns it. Big Spring has 4.97 Union Pacific track miles within the city, so the exact route matters. The agreement sets crossing details such as casing, depth and flagging, and TxDOT requests a copy if the line also occupies highway right of way.

Can a line be bored under Beals Creek in Big Spring?

A bore can be planned beneath Beals Creek, which runs 4.91 channel miles inside Big Spring. The route needs depth planning to stay below the channel. During planning, we check whether the crossing falls under U.S. Army Corps of Engineers jurisdiction, and the site conditions determine the bore plan.

Can I reach Trinity after hours for an urgent bore near 4th Street in Big Spring?

Yes. Call (405) 409-7423; a person answers 24 hours a day for urgent work near 4th Street or elsewhere in Big Spring. The scope, access and any nearby highway or utility crossing still shape how the work is planned.

How much 811 notice is needed for a Big Spring bore near Marcy Drive?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work starts. For a route near Marcy Drive, paint shows a line’s position, not depth. If the start slips more than 14 days past the notice, submit a new request; refresh worn or moved marks through Texas811 before work continues.

What affects the cost of a directional bore under Interstate 20 in Big Spring?

The job details determine the price. For an Interstate 20 route in Big Spring, relevant factors include distance from Yukon, bore length, pipe or conduit size, Potter gravel or bedrock, pavement, and utilities that must be crossed and exposed. Creek or railroad crossings, pits, excavator time and emergency work can also affect the scope.

Where the Big Spring facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Big Spring

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Big Spring, Texas

Type the address of your job in Big Spring. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Big Spring

All counties: Texas county list.