Quick Answer: Jayton is an incorporated county seat in Kent County, so its city streets belong to the city; we take directional boring, also called horizontal directional drilling (HDD), for crossings such as US 380. Main Street is 295 road miles from our Yukon, Oklahoma main office. Miles fine sandy loam is common here, with sandy clay loam below, so the bore plan needs to account for soil that may loosen behind the bit. We can also plan work along Jay Avenue and Goodall Avenue.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Jayton bores at a glance

  • County seat of Kent County, Texas. Population 473 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 295 miles, about 6.2 hours of driving.
  • Ground: Miles soil is mapped on 85 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 3 percent of the area.
  • Highways inside the boundary: US 380, Texas State Highway 70, FM 1083 and FM 1228. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Jayton, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Jayton and Kent County?

Jayton is a small incorporated city and the Kent County seat, with a population of 473 in the Census Bureau Vintage 2024 estimate. We take directional boring work across Texas, including routes for water, sewer, gas, electric conduit and fiber along streets such as Main Street or near US 380. The route and line type guide the bore plan.

Our main office is in Yukon, Oklahoma, and Jayton work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore ran about 4,100 feet under the Arkansas River in Tulsa. That reach is well beyond a typical Jayton service or utility bore near Main Street. Our directional boring work dates to 1982, and our family business began in 1965; Jayton is 295 road miles from our Yukon main office.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground should we expect in Jayton around Miles soil?

The USDA soil survey maps Miles soil across 85 percent of Jayton. Fine sandy loam is the surface texture over 75 percent of the mapped area, while about 40 inches down, sandy clay loam is mapped under 85 percent. Average clay content at that depth is 27 percent, and no sandy area is mapped there. We use Miles and Polar mapped soil patterns for planning, not test borings, when assessing underground work in Jayton. The mix suggests the upper ground can cut readily, while the deeper clay content may make returns and reaming behavior change along a bore near Main Street.

USDA soil survey, inside the Jayton city limitsWhat is mapped
Soil series mappedMiles 85 percent and Polar 10 percent
Texture at the surfacefine sandy loam 75 percent, gravelly loam 10 percent and loamy fine sand 10 percent
Texture about 40 inches downsandy clay loam 85 percent and very gravelly loam 10 percent
Engineering class about 40 inches downclayey sand (SC) 75 percent, lean clay (CL) 10 percent and silty clayey sand (SC SM) 10 percent
Average clay content about 40 inches down27 percent
Bedrock mapped within 60 inches3 percent of the area (0 percent hard rock, 3 percent weathered rock)
Seasonal water table within 60 inches2 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel2 percent of the area

The soil survey maps bedrock within 60 inches across 3 percent of Jayton, with typical bedrock depth listed as 32 inches, so a route can encounter shallow rock even though it is limited in the mapped area. Seasonal water table conditions are mapped within 60 inches across 2 percent, and flood prone soils are not mapped. High steel corrosion risk covers 2 percent. The Quaternary Red siltstone and shale clast locally gypsiferous loamy colluvium map unit includes clay, siltstone and shale, which can slow drilling where the bore reaches weathered rock.

How do we plan a Jayton bore through sandy clay loam near Girard?

Miles fine sandy loam covers much of Jayton, while sandy clay loam is common about 40 inches down. We adjust fluid and reaming to the ground along each route, including Main Street.

  1. Miles fine sandy loam is mapped across much of Jayton, so we control fluid and use staged reaming to help keep the loose upper ground stable.
  2. Sandy clay loam is common about 40 inches down; we watch returns and adjust fluid so the clay does not load the reamer on a Main Street route.
  3. We hydrovac expose marked utilities along streets such as Goodall Avenue before drilling near them, since surface paint does not show burial depth.
  4. A walkover locator tracks the drill head and logs depth and pitch as it advances beneath Jayton streets, helping keep the planned route on line.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Where might a Jayton bore go under US 380?

US 380 has 0.4 mapped roadway miles inside Jayton, while Texas State Highway 70 has 1.5 and FM 1083 has 0.9. FM 1228 adds 0.6 mapped roadway miles. A line under an existing highway pavement is bored or tunneled rather than open cut, and the route must be planned around the right of way. Main Street is the longest named street at 1.66 miles in the city. Jay Avenue has 1.12 miles and 8th Street has 0.92, giving several local corridors where pavement and buried services may shape access.

CrossingTypeMapped extentWho has a say
US 380US highway0.4 roadway miles insideState highway office
Texas State Highway 70State highway1.5 roadway miles insideState highway office
FM 1083State highway0.9 roadway miles insideState highway office
FM 1228State highway0.6 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Jayton or within one mile outside its limits, so there is no mapped track crossing to plan around. No named stream, lake or pond is mapped inside the city or within one mile, and no street crossing of a named stream is mapped. That leaves no mapped creek crossing on a local route, though a proposed line near Goodall Avenue still needs a site specific path and utility checks.

Do I need a permit for Jayton work in Kent County?

As an incorporated city in Kent County, Jayton controls its streets, so we plan any Main Street bore around city review. For work in the right of way of US 380, Texas State Highway 70, FM 1083 or FM 1228, the line owner, not our drilling crew, files the utility permit in TxDOT’s online RULIS system. We prepare the bore plan and profile for that filing, and the TxDOT Abilene District reviews it. Cover requirements depend on the line: highway crossings generally call for 60 inches for electric or communication and water, while sewer requirements depend on whether it is pressurized. A permit may set another depth. No railroad or water crossing is mapped in Jayton.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Jayton near the City of Jayton system?

The City of Jayton public water system uses groundwater wells and reports 317 service connections serving 513 people. A water line bore near Main Street needs a route coordinated with that buried system. Kent County electric service is reported by AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and South Plains Electric Cooperative. We confirm which utility owns a line at the job address before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of JaytonPublic water systemGroundwater wells317 connections, 513 people served
AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Kent CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Jayton’s median housing year is 1968 in the 2019 to 2023 five year estimates, so we check underground routes before choosing a bore path. Jayton’s 2019 to 2023 estimates put 32 percent of homes before 1960, 65 percent from 1960 to 1999 and 3 percent in 2000 or later; we check routes. Along Goodall Avenue, that age mix makes it sensible to check for existing service lines before a new connection or replacement bore. We hydrovac expose marked utilities on the path because locate paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

How far is Jayton from Aspermont and our Yukon office?

Jayton covers 1.7 square miles in Kent County at an elevation of 2,000 feet, and its ZIP code is 79528. It is the county seat. Girard is 9.2 miles northwest, Aspermont is 21.6 miles east, and Spur is 22.3 miles northwest. Snyder, the nearest larger city, is 41.9 miles southwest. The Yukon yard is 295 road miles away, a 6.2 hour drive. That distance affects mobilization for a bore on Main Street or a highway route.

Places near Jayton

What kinds of bores come up around Jayton’s Main Street?

  • Highway crossing: A bore beneath US 380 can carry water or conduit under pavement without cutting across the travel lanes.
  • Water service: A connection near Main Street can be routed around the City of Jayton groundwater system and other marked lines.
  • Fiber route: A conduit bore along Jay Avenue can avoid opening a trench across the street surface.
  • Electric conduit: Near 8th Street, we confirm the line owner and expose marked utilities before drilling the proposed route.
  • Service replacement: A bore by Goodall Avenue can install a replacement line while leaving the street surface uncut.
  • Airport service: A planned line near Kent County Airport needs a route and access plan tied to the actual site.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Jayton bore near Goodall Avenue?

Send us an address or map pin near US 380 to identify the Jayton project location. The exact spot matters near Goodall Avenue because the route can change the utilities to expose and whether the work approaches a street or highway right of way. For a possible crossing on Texas State Highway 70, tell us what goes underground, the pipe or conduit size, and the footage. A sketch or plans help us assess the route.

For work near FM 1083, the job scope sets our price, including the crossing details and footage. Ground conditions matter: Miles soil and the sandy clay loam below can affect drilling and reaming. Crossings matter too, including pavement on US 380 and existing utilities near Main Street. Logistics include pit space, excavator time, sand backfill and mobilization from Yukon, 295 road miles away. Pipe size, bore length, concrete, drainage crossings and emergency timing can also change the work involved.

Questions people ask about boring in Jayton

Does Trinity Boring Solutions take directional boring work in Jayton and Kent County?

Yes. We take directional boring work across Texas, including Jayton, and our own crews or vetted partner contractor yards can staff a job. Our main office is in Yukon, and you work with Trinity from the first call through the bore log. A route near Main Street is planned for its actual access and utility conditions.

What ground does a Jayton bore pass through in Miles soil?

The USDA soil survey maps Miles soil over 85 percent of Jayton, with fine sandy loam at the surface and sandy clay loam common about 40 inches down. The mapped clay content averages 27 percent at that depth. Those are survey patterns, not test borings, so the route near US 380 still needs site specific planning.

Will a Jayton bore through Polar soil hit rock?

It could. The soil survey maps bedrock within 60 inches across 3 percent of Jayton, and lists typical depth as 32 inches, so shallow rock is possible at some sites. The geologic map also shows Quaternary red siltstone and shale clast locally gypsiferous loamy colluvium. A route near Goodall Avenue needs to account for changing ground.

Who approves a Jayton bore under US 380?

For work in the US 380 right of way, the line owner files the utility permit through TxDOT’s RULIS system, not the drilling contractor. The TxDOT Abilene District reviews it. We prepare the bore plan and profile for the owner’s application. The permit addresses the crossing and applicable cover depth.

Who runs Jayton’s water system, and where does its water come from?

The City of Jayton owns and operates the public water system, which uses groundwater wells. Jayton reports 317 service connections serving 513 people, a scale we consider when planning underground utility work. A proposed water bore near Main Street should be routed with the existing system in mind, and marked lines on the bore path need to be exposed before drilling nearby.

Which electric providers report service in Kent County near Jayton?

AEP Texas North, Oncor Electric Delivery Company, Big Country Electric Cooperative and South Plains Electric Cooperative report electric service in Kent County. Those county reports do not identify the provider for every address. We confirm the line owner for a Jayton site before planning an electric conduit bore, including a route near Jay Avenue.

What bore sizes and lengths can Trinity handle near Jayton’s Goodall Avenue?

For work near FM 1228 in Jayton, we handle lines from 3/4 inch service lines up to 48 inch casing and bore lengths from 10 feet to 5,000 feet. The actual setup depends on the job. For a route near Goodall Avenue, send the location, line type, size and footage so we can consider access and the mapped Miles soil.

How much notice does Texas811 need before boring near Jayton’s Main Street?

Texas811 needs a locate request at least 48 hours before excavation begins, excluding Saturdays, Sundays and legal holidays, and the request cannot be made more than 14 days ahead. If a Main Street start moves more than 14 days past the original notice, make a new request. Worn or moved marks must be refreshed through Texas811 before work resumes.

What affects a directional bore’s cost under US 380 in Jayton with TxDOT permits?

The price depends on the route and work involved, not one measure alone. Miles soil, line size and footage affect drilling; a US 380 crossing, pavement and utilities to expose affect the crossing work. Pit needs, equipment time, backfill and the 295 road miles from Yukon also shape mobilization and job logistics.

Where the Jayton facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Jayton

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Jayton, Texas

Type the address of your job in Jayton. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Jayton

All counties: Texas county list.