trinityboringsolutions.com

Spur Texas Directional Boring: Olton Clay Loam, FM 261, Dockum Creek

Quick Answer: From our Yukon, Oklahoma main office, Spur is 300 road miles away, and we staff work with our crews and vetted partner drilling contractors near FM 261. We take directional boring, also called horizontal directional drilling (HDD), for routes under FM 261 and 3rd Street. USDA maps Olton clay loam across 29 percent of the city. Sticky clay can cling to reamers, so we control fluid and open the hole in stages before a pull near Dockum Creek.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Spur bores at a glance

  • Incorporated city in Dickens County, Texas. Population 843 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 300 miles, about 5.9 hours of driving.
  • Ground: Olton soil is mapped on 29 percent of the area, with clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 30 percent of the area.
  • Highways inside the boundary: FM 261, Texas State Highway 70, FM 836, Loop 120 and FM 2794. State permit office: TxDOT Childress District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Dockum Creek.
  • Public water: City of Spur, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring in Spur and Dickens County?

Spur is 300 road miles from our Yukon, Oklahoma main office, and we take work there with our own crews and vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts Spur at 843 people in Dickens County. Along FM 261 or 3rd Street, we install water, sewer, gas, electric conduit and fiber by directional boring when the route and ground suit a bore.

Our main office is in Yukon, Oklahoma, and Spur work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Directional boring has been part of our work since 1982, and our family business started in 1965. That experience helps us plan for the sticky Olton clay loam mapped across Spur.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Spur’s Olton soil put in a bore path?

The USDA soil survey maps Olton soil across 29 percent of Spur, with Olton clay loam listed for 1 to 3 percent slopes. Miles soil covers 20 percent, and Weymouth soil covers 19 percent. About 40 inches down, clay loam is mapped across 64 percent of the city and sandy clay loam across 20 percent. Surface texture is 67 percent clay loam and 20 percent fine sandy loam. These mapped patterns are a planning guide, not a test of a particular 3rd Street lot.

USDA soil survey, inside the Spur city limitsWhat is mapped
Soil series mappedOlton 29 percent, Miles 20 percent, Weymouth 19 percent, Abilene 14 percent and Woodward 9 percent
Texture at the surfaceclay loam 67 percent, fine sandy loam 20 percent and loam 12 percent
Texture about 40 inches downclay loam 64 percent, sandy clay loam 20 percent and very fine sandy loam 9 percent
Engineering class about 40 inches downlean clay (CL) 64 percent, clayey sand (SC) 20 percent and silty clay (CL ML) 11 percent
Average clay content about 40 inches down33 percent
Bedrock mapped within 60 inches30 percent of the area (0 percent hard rock, 30 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel48 percent of the area

Bedrock is mapped within 60 inches across 30 percent of Spur, and the mapped bedrock is weathered rather than hard; typical depth is 30 inches. That can call for slower drilling and attention at a soil to rock change near FM 261. In Dickens County, we treat seasonal water table and flood prone soils as unmapped, so we verify conditions before setting a bore path. High steel corrosion risk is mapped across 48 percent, so the line owner should address steel casing or tracer wire protection; HDPE avoids that soil corrosion concern. The Quartermaster Formation, of Guadalupian age, is the mapped geologic unit.

How do crews bore Spur’s clay loam?

Olton clay loam and clay loam at about 40 inches call for a controlled fluid plan. Around 3rd Street, we expose marked lines before drilling and keep the bore path tracked as it advances.

  1. In Olton clay loam, we use a thinner fluid mix with polymer and ream in stages so sticky cuttings do not build up on the reamer.
  2. Because clay can grip a pipe, we plan to pull it after opening the hole rather than leave the bore open near 3rd Street.
  3. We hydrovac pothole every marked utility on the route before the drill approaches; paint by FM 261 shows position, not depth.
  4. A walkover locator tracks the drill head and logs depth and pitch as it advances beneath 6th Street.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Where might a Spur line go under Dockum Creek or a road?

FM 261 has 2.9 mapped roadway miles inside Spur, while Texas State Highway 70 has 1.4 and FM 836 has 0.7. Loop 120 and FM 2794 also run inside the limits. A bore beneath one of these state routes needs a planned path and the applicable TxDOT permit. The longest named streets include 3rd Street at 2.29 miles, Harris Street at 1.94 miles and 2nd Street at 1.87 miles. 6th Street adds another route where a bore can avoid cutting pavement.

CrossingTypeMapped extentWho has a say
FM 261State highway2.9 roadway miles insideState highway office
Texas State Highway 70State highway1.4 roadway miles insideState highway office
FM 836State highway0.7 roadway miles insideState highway office
Loop 120State highway0.2 roadway miles insideState highway office
FM 2794State highway0.1 roadway miles insideState highway office
Dockum CreekStream0.94 channel miles insideChecked for Corps of Engineers jurisdiction
Duck CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad lines are mapped inside Spur or within 1 mile outside the city, so the local crossing data shows no track route to plan around. Dockum Creek runs 0.94 channel miles inside the limits, and Duck Creek is 0.3 miles outside them. No mapped street crossings of named streams are recorded in the city. A Dockum Creek bore can leave the channel banks uncut, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. Along FM 261 in Spur, we have no mapped lakes or ponds within 1 mile, but still confirm crossing conditions before boring.

Do I need a permit for a Spur bore under FM 261?

FM 261 and the other state routes in Spur fall under TxDOT, with the Childress District reviewing the highway work. Cover depth shapes the bore: electric and communication lines need 60 inches below the lowest crossed grade, while water needs 60 inches and pressurized sewer needs 60 inches at a crossing. The utility owner, not our crew, submits the application through TxDOT’s online RULIS system. We prepare the bore plan and profile for that filing and work under the permit issued to the owner. On 3rd Street, we treat Spur’s city streets as city owned when coordinating access and boring work. A Dockum Creek route is checked for federal waterway jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near Spur’s City of Spur water system?

The City of Spur public water system serves 863 people through 519 service connections and uses purchased surface water. For electric conduit work on 3rd Street, AEP Texas North, Lighthouse Electric Cooperative and South Plains Electric Cooperative report service in Dickens County. We confirm the line owner for the specific address before planning a conduit bore, since the countywide reporting does not establish which provider serves each property.

Line ownerWhat it isSourceSize
City of SpurPublic water systemSurface water bought from another system519 connections, 863 people served
AEP Texas North, Lighthouse Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Dickens CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Spur’s median housing year at 1958; 60 percent of homes were built before 1960, and 9 percent were built in 2000 or later. Older service lines may be part of a replacement project, while newer homes may need a new connection. Before a bore crosses a marked line near 3rd Street, we hydrovac pothole it to verify its depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

How far is Spur from Girard and our Yukon office?

Spur is in Dickens County, covers 1.6 square miles and sits at an elevation of 2,282 feet. Its ZIP code is 79370. Dickens is 10.0 miles north and is the county seat; Girard is 13.5 miles southeast, and Jayton is 22.3 miles southeast. From our Yukon, Oklahoma main office, the road trip to Spur is 300 miles and takes 5.9 hours. That distance is part of mobilization planning for a bore near FM 261 or Dockum Creek.

Places near Spur

What kinds of bores come up near Spur’s 3rd Street?

  • Highway crossing: A bore beneath FM 261 can keep the existing roadway intact, with the alignment and cover set through the permit plan.
  • Water service: A connection near the City of Spur system can be routed beneath 3rd Street without opening a pavement trench.
  • Fiber drop: Fiber conduit along Harris Street can use a narrow bore path, with marked utilities exposed before drilling near them.
  • Creek crossing: A Dockum Creek bore can pass beneath the channel, with the route checked for U.S. Army Corps of Engineers jurisdiction.
  • Service replacement: A line serving an older home near 6th Street can be bored between pits instead of cutting across the street.
  • Electric conduit: For a route near Texas State Highway 70, we confirm the line owner before laying out the conduit bore.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a Spur bore near 6th Street?

For a 6th Street quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help us see the route. The location also shows whether the work approaches FM 261 or Dockum Creek, which changes what we need to plan.

The job scope sets the price, not length alone. Ground matters: sticky Olton clay loam can call for staged reaming, while weathered bedrock may slow the bore. Crossings matter too, including utilities to expose, pavement near FM 261 and a possible Dockum Creek route. Logistics include pits, excavator time, backfill, emergency timing and mobilization from Yukon, 300 road miles away. Those details shape the equipment and crew plan.

Questions people ask about boring in Spur

Does Trinity Boring Solutions take directional boring work in Spur, Dickens County?

Yes. We take directional boring work in Spur and staff it with our crews or with partner drilling contractors whose yards we have vetted. We coordinate with Trinity through the bore log for work along FM 836, regardless of which contractor crew is on site. For a route near FM 261, the crew plan also accounts for the highway permit process.

Does Olton soil in Spur create a steel corrosion concern, and what pipe can I use?

The USDA soil survey maps high steel corrosion risk across 48 percent of Spur. With Miles soils in Spur, we use HDPE without that soil corrosion concern affecting the pipe. If the project near 3rd Street uses steel casing or tracer wire, the line owner chooses any needed coating for those materials.

What ground will a bore pass through in Spur’s Olton soil?

The USDA soil survey maps Olton clay loam across 29 percent of Spur. About 40 inches down, clay loam is mapped across 64 percent and sandy clay loam across 20 percent. Sticky clay can collect on a reamer, so a bore near 6th Street may need staged reaming and a controlled fluid plan.

Is there rock near the surface for a directional bore in Spur?

Bedrock is mapped within 60 inches across 30 percent of Spur, with a typical depth of 30 inches. The mapped bedrock is weathered, and hard bedrock is not mapped within that depth. A route near FM 261 may need slower drilling where soil changes to weathered rock.

Who approves a bore beneath FM 261 in Spur?

TxDOT reviews work in the FM 261 right of way through its Childress District. The utility owner submits the application in TxDOT’s RULIS system, and we provide the bore plan and profile for the filing. The permit sets the approved path and any required cover.

Can a line be bored beneath Dockum Creek in Spur?

A bore can be planned beneath Dockum Creek, which runs 0.94 channel miles inside Spur. The creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The mapped data lists no street crossings of named streams inside the city.

Does the distance from Yukon change a directional boring job in Spur?

Spur is 300 road miles and 5.9 drive hours from our Yukon, Oklahoma main office. That distance can affect mobilization for work near 3rd Street or FM 261. The route, pipe size, ground and crossings still determine the crew and equipment plan.

How much notice do I need for a bore near 3rd Street in Spur?

Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. If a 3rd Street start slips more than 14 days past the original notice, submit a new request. On Texas State Highway 70 in Spur, we have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of a directional bore under FM 261 in Spur?

The price depends on bore length, pipe or conduit size, Olton clay loam or weathered bedrock, utilities to expose and pavement near FM 261. A Dockum Creek crossing, pits, backfill, excavator time, emergency timing and mobilization from Yukon also affect the job plan.

Where the Spur facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Spur

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Spur, Texas

Type the address of your job in Spur. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Spur

All counties: Texas county list.