Naples Texas Directional Boring: Kirvin Clay, Union Pacific Track And Caney Creek
Quick Answer: The USDA soil survey maps fine sandy loam across Naples, with clay common about 40 inches down; Reklaw Formation sandstone and clay are mapped in the area. On a Union Pacific crossing in Naples, Trinity Boring Solutions uses directional boring, also called horizontal directional drilling (HDD), to carry a line beneath the track. Naples is 303 road miles from our Yukon, Oklahoma main office, so a job near Main Street includes that distance in the plan. Kirvin soil covers 33% of the mapped area, and sticky clay at depth can grip the pipe, so staged reaming and a same day pull matter.
Naples bores at a glance
- Incorporated city in Morris County, Texas. Population 1,411 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 303 miles, about 6 hours of driving.
- Ground: Kirvin soil is mapped on 33 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 32 percent of the area.
- Highways inside the boundary: US 67, Texas State Highway 338, Texas State Highway 77 and FM 161. State permit office: TxDOT Atlanta District.
- Railroad track inside the boundary: Union Pacific, with 6 mapped street and rail crossings.
- Public water: City of Naples, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Main Street in Naples?
Trinity Boring Solutions takes directional boring work in Naples, where Union Pacific track and US 67 make trenchless routes useful. The USDA soil survey maps fine sandy loam near the surface and clay about 40 inches down. The Census Bureau Vintage 2024 estimate puts Naples at 1,411 people. Near Main Street, our crews can install water, sewer, gas, electric conduit or fiber beneath pavement and other obstacles.
Our main office is in Yukon, Oklahoma, and Naples work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. With no utility strike in over 25 years, we take care around the City of Naples groundwater system and electric lines reported in Morris County. Our family business began in 1965 and has done directional boring since 1982, experience we bring to routes near US 67.

What kind of ground should a Naples bore through Kirvin soil expect?
Naples has Kirvin soil across 33% of its mapped area, with fine sandy loam common near the surface and clay below. The USDA soil survey lists Kirvin very fine sandy loam on 15% of the area and Kirvin Urban land complex on 16%. At about 40 inches, clay accounts for 51% of mapped soil texture and sandy clay loam for 29%; average clay content there is 41%. We treat Naples mapped soil patterns as planning context, not as test borings. Sticky clay can load onto a reamer and grip pipe, so the actual route still needs field checks.
| USDA soil survey, inside the Naples city limits | What is mapped |
|---|---|
| Soil series mapped | Kirvin 33 percent, Bowie 29 percent, Freestone 13 percent, Kullit 9 percent and Talco 8 percent |
| Texture at the surface | fine sandy loam 48 percent, very fine sandy loam 40 percent and silt loam 8 percent |
| Texture about 40 inches down | clay 51 percent, sandy clay loam 29 percent and silty clay 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 56 percent and lean clay (CL) 44 percent |
| Average clay content about 40 inches down | 41 percent |
| Bedrock mapped within 60 inches | 32 percent of the area (0 percent hard rock, 32 percent weathered rock) |
| Seasonal water table within 60 inches | 61 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 83 percent of the area |
The soil survey maps bedrock within 60 inches across 32% of Naples, with a typical depth of 44 inches, so weathered material may slow a bore. A seasonal water table is mapped within 60 inches across 61% of the area, which can fill pits. Flood prone soils cover 1%. High steel corrosion risk is mapped across 83%, a concern for uncoated casing or tracer wire; the line owner selects materials. The geologic map also shows Reklaw Formation, Eocene sandstone and clay, which may call for slower drilling where encountered.
How do we plan a bore through Naples clay?
In Naples, mapped clay and a seasonal water table shape the bore plan. We track the drill head from the surface, log depth and pitch, and adjust the fluid and reaming sequence to the ground we meet.
- Kirvin clay can cling to the reamer and tighten around pipe, so we use a thinner fluid mix with polymer and open the hole in stages.
- With Naples clay mapped at 40 inches and heavy clay across much of the area, we watch returns to avoid pressure lifting nearby pavement.
- The seasonal water table mapped near the surface can fill pits around Main Street, so we keep pits small and pump as needed.
- At a Caney Creek route, we plan to stay below the channel and check the crossing for federal jurisdiction before setting the bore path.

Where might a Naples line pass under Union Pacific track?
A Naples bore may need to pass beneath US 67, Texas State Highway 338, Texas State Highway 77 or FM 161, all mapped within the city. Main Street is the longest named street at 2.14 miles, followed by Front Street at 1.75 miles and Wl Doc Dodson at 1.7 miles. A bore can keep pavement intact, with entry and exit pits placed in dirt where access allows. Route and cover depend on the road owner and the line being installed.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 67 | US highway | 2.7 roadway miles inside | State highway office |
| Texas State Highway 338 | State highway | 1.5 roadway miles inside | State highway office |
| Texas State Highway 77 | State highway | 1.4 roadway miles inside | State highway office |
| FM 161 | State highway | 1.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.25 track miles inside | The railroad |
| Caney Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Mary Lees Branch | Stream nearby | 0.8 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.25 track miles within Naples, and public mapping shows 6 street and rail crossings in the city. A bore beneath those tracks needs an agreement with Union Pacific; its terms address casing, depth and flagging. Caney Creek runs along or touches the city boundary, while Mary Lees Branch is 0.8 miles away. No mapped street crossings of named streams or lakes and ponds within one mile are listed, but a creek route still needs planning for its channel.
Do I need a permit for a Naples bore under US 67?
US 67 is a state highway, so work in its right of way needs a TxDOT utility permit reviewed by the TxDOT Atlanta District. The utility that owns the line submits the application through TxDOT RULIS; we prepare the bore plan and profile and work under the permit issued to that owner. TxDOT rules call for boring or tunneling beneath existing highway pavement, with casing at crossings and a bore extending beneath all travel lanes on rural highways. A Union Pacific crossing also needs its railroad agreement. Caney Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities serve Naples and Morris County?
The City of Naples public water system uses groundwater wells and reports 636 service connections serving 1,908 people. Electric service reported in Morris County includes Southwestern Electric Power, Bowie Cass Electric Cooperative and Upshur Rural Electric Cooperative; those reports do not identify the provider at every address. Before an electric conduit bore near Main Street or US 67, we confirm which utility owns the line and coordinate the conduit specifications with that owner.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Naples | Public water system | Groundwater wells | 636 connections, 1,908 people served |
| Southwestern Electric Power, Bowie-Cass Electric Cooperative and Upshur Rural Electric Cooperative | Electric utilities reporting service in Morris County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Naples’s median housing year at 1969; 22% of units were built before 1960, 62% from 1960 to 1999 and 16% in 2000 or later. That mix can mean replacement work as well as new services. Near Wl Doc Dodson, we hydrovac pothole marked utilities before drilling close: older water or electric lines may not match the surface marks, which show position but not depth.

What is near Naples, including Marietta?
Naples is an incorporated city in Morris County, at an elevation of 394 feet and covering 2.37 square miles. Its ZIP code is 75568. Omaha is 3.7 miles west, Marietta is 8.1 miles east, and Daingerfield, the county seat, is 12.2 miles south. Mount Pleasant, the nearest larger city, is 17.4 miles west. Our Yukon, Oklahoma main office is 303 road miles away, a 6.0 hour drive, which matters when planning equipment and crew travel for a Naples bore.
Places near Naples
- Directional boring in Omaha: 3.7 miles west
- Directional boring in Marietta: 8.1 miles east
- Directional boring in Daingerfield: 12.2 miles south
- Directional boring in Hughes Springs: 14.3 miles south
- Directional boring in Mount Pleasant: 17.4 miles west
What would we bore near Caney Creek in Naples?
- Highway crossing: A bore beneath US 67 keeps the line below the roadway, with the utility owner arranging the TxDOT permit.
- Street service: Water or sewer near Main Street can pass beneath pavement, with pits set in dirt on either side.
- Rail crossing: A line beneath Union Pacific track needs a railroad agreement that sets crossing details and flagging.
- Creek crossing: A Caney Creek route needs channel depth planning and a jurisdiction check before the bore is laid out.
- Electric conduit: Near Wl Doc Dodson, we confirm the line owner and expose marked utilities before drilling close.
- Fiber route: Fiber along Front Street can be installed by bore to avoid opening pavement along the route.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Daingerfield Street bore in Naples?
For a Daingerfield Street bore in Naples, we can scope a route that avoids cutting pavement where the site allows. Send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help us read the route. A crossing near Main Street or a Union Pacific track may change the bore setup.
The 303 road miles from Yukon affect crew and equipment mobilization for a Naples job. Kirvin clay and the mapped seasonal water table can change reaming, fluid handling and pit work. A route under US 67 or Union Pacific track adds crossing requirements, while concrete, pavement, creek access and the number of exposed utilities also affect the scope. Pit size, excavator time, sand backfill and emergency timing matter too.
Questions people ask about boring in Naples
Does Trinity take directional boring jobs in Morris County near Naples, and how are crews assigned?
Yes, we take directional boring work in Naples and across Texas. Our main office is in Yukon, and Naples jobs use our crews or satellite yards run by drilling partners we have vetted. You work with Trinity from the first call through the bore log, including on a route near US 67.
What does a bore under Union Pacific track in Naples need?
A bore beneath Union Pacific track in Naples needs an agreement from the railroad that owns it. That agreement sets details such as casing, depth and flagging. Public mapping shows 2.25 track miles in the city, so the planned route and crossing location matter to the railroad review.
Can a line be bored under Caney Creek near Naples?
A bore under Caney Creek can be planned, subject to the route and channel conditions. The creek runs along or touches the Naples boundary, so we plan the depth to stay beneath the channel and check for U.S. Army Corps of Engineers jurisdiction during planning.
How do we confirm who runs Naples’s public water system and where its water comes from?
The City of Naples owns its public water system, which draws from groundwater wells. Naples public records show 636 service connections and 1,908 people served, figures we use when planning underground work. A water line bore near Main Street still needs its exact connection and existing buried lines checked before work.
Which Morris County electric utility should I contact for a Naples conduit bore?
The electric line owner for a particular Naples address must be confirmed before a conduit bore. Southwestern Electric Power, Bowie Cass Electric Cooperative and Upshur Rural Electric Cooperative report service in Morris County, but those reports do not identify the provider at every address. We coordinate conduit specifications with the confirmed owner.
Who controls Wl Doc Dodson in Naples, and does a bore require cutting the street?
Wl Doc Dodson is a city street because Naples is incorporated. A directional bore can pass under its pavement without cutting the roadway, with pits placed in dirt on each side where access permits. We locate and expose marked utilities along the route before drilling near them.
Can I reach Trinity after hours about an urgent bore near Wl Doc Dodson in Naples?
Yes, a person answers Trinity’s phone 24 hours a day, and we provide 24 hour emergency response. For an urgent job near Wl Doc Dodson, the address, line type and crossing details help us understand the request and the site conditions.
How far ahead should I call Texas811 for a bore near Main Street in Naples?
For a bore near Main Street, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If the start slips more than 14 days past the original notice, request a new ticket; have worn or moved marks refreshed before work continues.
What affects our directional bore cost under US 67 in Naples?
The US 67 route, bore length and pipe or conduit size all affect the job scope. Kirvin clay, pavement, exposed utilities and any Union Pacific or creek crossing can add planning or equipment needs. Pit work, excavator time, backfill, emergency timing and the 303 road miles from Yukon also factor into the quote.
Where the Naples facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Naples
- U.S. Census Bureau, TIGER/Line 2024: Naples boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Naples
- U.S. Census Bureau, American Community Survey 2019 to 2023: Naples housing units and year built
- Macrostrat geologic map compilation: map units under Naples
- U.S. EPA Safe Drinking Water Information System: public water systems serving Naples
- U.S. Department of Transportation, North American Rail Network: track owners in Morris County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Morris County
- U.S. Geological Survey, Elevation Point Query Service: Naples elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Naples
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Naples
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Naples, Texas
Type the address of your job in Naples. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Naples
Same county: Lone Star. All counties: Texas county list.
