Quick Answer: Texas State Highway 11 is a main obstacle, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Hughes Springs, Texas. First Street adds tight street access, while the Yukon, Oklahoma main office is 310 road miles away. At 40 inches, mapped sandy clay loam covers 50% of the area, so crews need to keep the hole stable as the reamer advances. CPKC track and Hughes Creek crossings call for route checks before the bore starts.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Hughes Springs bores at a glance

  • Incorporated city in Cass County, Texas. Population 1,533 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 310 miles, about 6.1 hours of driving.
  • Ground: Cuthbert soil is mapped on 30 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 39 percent of the area.
  • Highways inside the boundary: Texas State Highway 11, Texas State Highway 49, FM 250, FM 161 and FM 2612. State permit office: TxDOT Atlanta District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 4 mapped street and rail crossings.
  • Named streams inside the boundary: Hughes Creek.
  • Public water: City of Hughes Springs, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring under Texas State Highway 11 in Hughes Springs?

Texas State Highway 11 and the CPKC track can shape a utility route through Hughes Springs, and we take directional boring work in Cass County. The Census Bureau Vintage 2024 estimate puts the city population at 1,533. We install water, sewer, gas, electric conduit and fiber, routing each line beneath roads such as First Street or between properties where a trench would disrupt access.

Our main office is in Yukon, Oklahoma, and Hughes Springs work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, with directional boring work beginning in 1982. That experience spans 3/4 inch service lines through 48 inch casing, a range suited to both a South Pine service connection and a larger crossing beneath Texas State Highway 11.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Cuthbert soil in Hughes Springs?

The USDA soil survey maps Cuthbert soils across 30% of Hughes Springs and lists Cuthbert and Redsprings soils on 5 to 15 percent slopes across 21%. Fine sandy loam is the most common surface texture, mapped over 65% of the city. At about 40 inches, sandy clay loam accounts for 50% and clay loam for 36%. Those mapped patterns describe changing ground along a bore route, not test borings. Sandy clay loam can hold a hole differently from the finer surface soil, so the crew adjusts fluid and reaming to the actual returns.

USDA soil survey, inside the Hughes Springs city limitsWhat is mapped
Soil series mappedCuthbert 30 percent, Elrose 25 percent, Bowie 11 percent, Redsprings 9 percent and Lilbert 9 percent
Texture at the surfacefine sandy loam 65 percent, gravelly fine sandy loam 26 percent and loamy fine sand 9 percent
Texture about 40 inches downsandy clay loam 50 percent, clay loam 36 percent and loam 9 percent
Engineering class about 40 inches downlean clay (CL) 47 percent, clayey sand (SC) 44 percent and fat clay (CH) 9 percent
Average clay content about 40 inches down30 percent
Bedrock mapped within 60 inches39 percent of the area (0 percent hard rock, 39 percent weathered rock)
Seasonal water table within 60 inches19 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel21 percent of the area

The USDA soil survey maps weathered bedrock within 60 inches over 39% of Hughes Springs, with a typical depth of 35 inches. The drill may slow where it meets that material, and the soil to rock change can nudge the head off line. Seasonal water tables occur within 60 inches across 19%; flood prone soils cover 9%, which matters near Hughes Creek. High steel corrosion risk is mapped over 21%. The Queen City Sand, an Eocene unit of sand and clay, is the mapped geology; soil and rock conditions still need checking along the planned route.

How do crews handle sandy clay loam in Hughes Springs?

The USDA soil survey shows sandy clay loam at about 40 inches across half of Hughes Springs. We match fluid and reaming to the ground the drill meets, while tracking the head along the route.

  1. Cuthbert soils cover 30% of Hughes Springs; we read the cuttings and fluid returns as the bore moves through changing soil.
  2. Where sandy clay loam is mapped at about 40 inches, staged reaming helps manage hole stability before pipe is pulled.
  3. With weathered bedrock mapped within 60 inches across 39% of Hughes Springs, we track depth and pitch at each rod through changing ground.
  4. Near Hughes Creek, we plan the bore below the channel and check for water at the pits before setting up.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

What does a bore have to cross near First Street in Hughes Springs?

Texas State Highway 11 has 3.8 mapped roadway miles inside Hughes Springs, and Texas State Highway 49 has 3.7. FM 250, FM 161, FM 2612 and FM 2976 also run within city limits. A highway bore needs room for entry and exit pits beyond the travel lanes. First Street is the longest named street at 0.86 miles in the city; Victory Lane and South Pine each cover 0.62 miles. Those streets can call for a route that avoids cutting pavement and driveways.

CrossingTypeMapped extentWho has a say
Texas State Highway 11State highway3.8 roadway miles insideState highway office
Texas State Highway 49State highway3.7 roadway miles insideState highway office
FM 250State highway2 roadway miles insideState highway office
FM 161State highway1.7 roadway miles insideState highway office
FM 2612State highway0.5 roadway miles insideState highway office
FM 2976State highway0.1 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad3.85 track miles insideThe railroad
Texas and Northern RailwayRailroad nearby0.1 miles outsideThe railroad
Hughes CreekStream2.38 channel miles insideChecked for Corps of Engineers jurisdiction
Cloniger CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Cloninger CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Peacock CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) has 3.85 track miles in Hughes Springs, with four mapped street and rail crossings in the city. A crossing needs the railroad owner’s agreement before the route is set. Hughes Creek runs 2.38 channel miles inside the limits, and seven mapped street crossings intersect named streams. Cloniger Creek and Cloninger Creek touch the city boundary. No lakes or ponds are mapped within one mile, but creek work needs a channel plan.

Who has to sign off on a CPKC (Kansas City Southern) bore in Hughes Springs?

For work in the right of way of Texas State Highway 11, Texas State Highway 49 or an FM road, the line owner applies for a TxDOT utility permit through RULIS; the driller does not file it. The TxDOT Atlanta District reviews Cass County applications. We give the utility owner the bore plan and profile, then work under its issued permit. TxDOT requires highway utility lines to be bored or tunneled beneath existing pavement; required cover depends on the line type and crossing. A route beneath CPKC track also needs an agreement with the railroad owner. Hughes Creek crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Cass County around Hughes Springs?

The City of Hughes Springs owns the public water system, which uses purchased surface water and serves 2,527 people through 1,955 service connections. That network can affect a bore near First Street or South Pine, so the marked route needs checking before drilling. Electric service reported in Cass County includes Southwestern Electric Power, Bowie-Cass Electric Cooperative, Southwest Arkansas Electric Cooperative and Upshur Rural Electric Cooperative. The line owner must be confirmed for the address before conduit specifications are set.

Line ownerWhat it isSourceSize
City of Hughes SpringsPublic water systemSurface water bought from another system1,955 connections, 2,527 people served
Southwestern Electric Power, Bowie-Cass Electric Cooperative, Southwest Arkansas Electric Cooperative and Upshur Rural Electric CooperativeElectric utilities reporting service in Cass CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates give Hughes Springs a median housing year of 1963: 48% of units were built before 1960, while 12% date from 2000 or later. A replacement bore near Victory Lane may follow older buried service, while a new connection may need a different route. We hydrovac pothole marked utilities before the drill approaches; paint locates position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Where is Hughes Springs in relation to Mount Pleasant?

Hughes Springs is an incorporated city in Cass County, covering 2.49 square miles at an elevation of 380 feet. Its ZIP code is 75656. Daingerfield is 5.9 miles west, Lone Star is 6.1 miles southwest, and Avinger is 8.4 miles southeast. Linden, the county seat, is 15.6 miles east; Mount Pleasant is 22.7 miles northwest. The Yukon, Oklahoma main office is 310 road miles away, a 6.1 hour drive. That distance is part of planning mobilization for a bore under Texas State Highway 11 or CPKC track.

Places near Hughes Springs

What boring work comes up near Hughes Creek in Hughes Springs?

  • Highway crossing: A bore beneath Texas State Highway 11 keeps the pavement intact, with pits set clear of the travel lanes.
  • Water service: A connection near the City of Hughes Springs water system needs marked lines exposed before the drill approaches.
  • Fiber route: First Street offers a defined street corridor for conduit, with entry and exit pits kept off the pavement.
  • Creek crossing: Hughes Creek calls for a planned depth below the channel and a check for federal jurisdiction during planning.
  • Rail crossing: CPKC track needs the railroad owner’s agreement, with casing and work conditions settled before drilling.
  • Service replacement: Older housing near South Pine may need a bore connecting a replacement line while avoiding existing buried utilities.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for Texas State Highway 11 work in Hughes Springs?

For a bore along Texas State Highway 11 or First Street, send the address or map pin, what will go in the ground, pipe or conduit size and footage; a sketch or plans help. That lets us place the pits and see whether CPKC track or Hughes Creek affects the route.

The job details set the price. In Hughes Springs, soil and weathered bedrock can change tooling and reaming time, while a CPKC track or Texas State Highway 11 crossing adds coordination and route demands. The number of utilities to expose, pavement or concrete, creek crossings, pits, excavator time and sand backfill also matter. Mobilization from Yukon is part of the estimate because the main office is 310 road miles away. High profile or emergency work can add requirements.

Questions people ask about boring in Hughes Springs

Does Trinity take directional boring jobs in Hughes Springs and Cass County, and who staffs them?

Yes. Trinity takes directional boring work in Hughes Springs and across Texas. Our own crews perform the work, with support from satellite yards run by partner drilling contractors we have vetted. You deal with Trinity from the first call through the bore log, whether the route is near First Street or CPKC track.

Who runs the Hughes Springs public water system, and where does its water come from?

The City of Hughes Springs owns the public water system, and its source is purchased surface water. The system serves 2,527 people through 1,955 service connections. A bore near South Pine or First Street should account for that existing network, with marked utilities exposed before the drill gets close.

Which electric line owner should I check in Cass County for a Hughes Springs conduit bore?

Southwestern Electric Power, Bowie-Cass Electric Cooperative, Southwest Arkansas Electric Cooperative and Upshur Rural Electric Cooperative report electric service in Cass County. That does not establish which company serves a particular Hughes Springs address. Confirm the line owner for the route near Texas State Highway 49 before setting conduit specifications.

Who controls South Pine in Hughes Springs, and does a bore have to cut the street?

Hughes Springs is incorporated, so its city streets belong to the city itself. A directional bore can pass under South Pine without opening the pavement; the pits sit in the dirt on either side. If the route reaches Texas State Highway 11, the state highway permit and installation rules also apply.

Do older buried lines near Victory Lane affect replacement bores in Hughes Springs?

They can affect the route. The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1963, with 48% of homes built before 1960. A replacement bore near Victory Lane may encounter older service lines, so marked utilities need hydrovac potholing before drilling near them.

Can groundwater or flood prone soil affect bore pits near Hughes Creek in Hughes Springs?

It can. The USDA soil survey maps seasonal water tables within 60 inches across 19% of Hughes Springs and flood prone soils across 9%. Near Hughes Creek, we plan the bore below the channel and check pit conditions; small pits and pumping may be needed if water enters.

What bore sizes and lengths can Trinity handle for a job near Pratt in Hughes Springs?

Trinity handles lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near Pratt could be a short service connection or part of a longer utility crossing. Pipe size, mapped ground and crossings determine the equipment and plan.

How much 811 notice does a Hughes Springs bore near First Street need, and what if marks move?

Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. Texas811 describes that as two working days. If a First Street start slips more than 14 days past the notice, make a new request; worn or moved marks must be refreshed before work continues.

What affects the cost of directional boring under Texas State Highway 11 in Hughes Springs?

The route length, pipe or conduit size, soil and rock, and utilities to cross or expose all affect the cost. A Texas State Highway 11 crossing can involve pavement and permit planning, while Hughes Creek adds water crossing considerations. Pits, excavator time, backfill and mobilization from Yukon also shape the job scope.

Where the Hughes Springs facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Hughes Springs

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Hughes Springs, Texas

Type the address of your job in Hughes Springs. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Hughes Springs

Same county: Atlanta · Linden · Queen City · Bloomburg · Douglassville · Domino · Bivins · McLeod. All counties: Texas county list.