trinityboringsolutions.com

Amaya Texas Directional Boring: Tonio Fine Sandy Loam, US 83 and El Pico Clay

Quick Answer: Along US 83, Trinity Boring Solutions provides directional boring, also called horizontal directional drilling (HDD), for lines that need to pass beneath the highway or nearby Amaya Road. Amaya has 2.35 public road miles inside the mapped community boundary, and the Yukon main office is 591 road miles away, so the route scope affects mobilization. Tonio fine sandy loam covers 64 percent of mapped ground; clay in the soil can cling to tooling and calls for staged reaming. That ground and the US 83 alignment shape the bore plan.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Amaya bores at a glance

  • Unincorporated community in Zavala County, Texas. Population 108 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 591 miles, about 11.5 hours of driving.
  • Ground: Tonio soil is mapped on 64 percent of the area, with sandy clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 64 percent of the area.
  • Highways inside the boundary: US 83. State permit office: TxDOT Laredo District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring along US 83 in Amaya?

We take directional boring work in Amaya, Zavala County, including water, sewer, gas, electric conduit and fiber lines routed beneath US 83 or along Amaya Road. The Census Bureau counted 108 people here in the 2020 Census. Amaya Road is the longest named street at 0.29 miles; 2.35 public road miles lie inside the mapped community boundary, and US 83 runs through the community.

Our main office is in Yukon, Oklahoma, and Amaya work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report service in Zavala County, so protecting buried lines is part of the work. We have had no utility strike in over 25 years, and our family business began in 1965, with directional boring since 1982.

Aerial view of a bore pit with drill rig and conduit alongside a directional drill rig and conduit on a concrete lot
Our crew at a bore pit beside the directional drill on a conduit job, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Amaya and Tonio soil?

The USDA soil survey maps Tonio fine sandy loam across 64 percent of Amaya, with Brystal fine sandy loam mapped under 22 percent and Cotulla clay under 13 percent. Fine sandy loam is the surface texture across 86 percent of the mapped area. At about 40 inches below the surface, sandy clay loam is mapped under 86 percent and clay under 13 percent; the average clay content there is 29 percent. These mapped patterns are not test borings, so the route still needs site specific planning.

USDA soil survey, inside the Amaya mapped community boundaryWhat is mapped
Soil series mappedTonio 64 percent, Brystal 22 percent and Cotulla 13 percent
Texture at the surfacefine sandy loam 86 percent and clay 13 percent
Texture about 40 inches downsandy clay loam 86 percent and clay 13 percent
Engineering class about 40 inches downlean clay (CL) 64 percent, clayey sand (SC) 22 percent and fat clay (CH) 13 percent
Average clay content about 40 inches down29 percent
Bedrock mapped within 60 inches64 percent of the area (0 percent hard rock, 64 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel13 percent of the area

Weathered bedrock is mapped within 60 inches across 64 percent of Amaya, at a typical depth of 54 inches; hard bedrock is not mapped within that depth. The El Pico Clay unit, of Lutetian age, includes clay, silty clay and sandstone, so weathered rock may slow drilling. Along Amaya Road, we verify field conditions because seasonal water tables and flood prone soils are not mapped. High steel corrosion risk covers 13 percent of the area, so the line owner should consider steel casing and tracer wire materials; HDPE is not subject to that soil corrosion concern.

How do we drill Amaya’s sandy clay loam in Zavala County?

In Amaya, the mapped sandy clay loam and clay call for a controlled fluid plan, careful reaming and a ready pipe pull. Along US 83, we track the drill head and monitor the path before bringing the line through.

  1. Tonio soil is mapped across 64 percent of Amaya; we use a controlled fluid mix and staged reaming to manage sticky clay without overworking the hole.
  2. At about 40 inches, sandy clay loam is mapped under 86 percent of the community; we keep the pipe ready so the pull can follow the final ream.
  3. Weathered bedrock is mapped within 60 inches across 64 percent of Amaya; we watch the changing ground and allow for slower progress where the bit meets rock.
  4. Before a bore near Amaya Road or US 83, we hydrovac pothole marked utilities because surface marks show position, not depth.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What might a new line cross in Amaya near US 83?

US 83 has 0.9 mapped roadway miles inside the Amaya community boundary, and no highway is mapped within 1.5 miles outside it. Any crossing plan has to account for the highway’s pavement and right of way. Amaya Road is the longest named street, with 0.29 miles mapped inside the community; public road centerlines total 2.35 miles. The community has one named street, so a proposed route needs to be checked against the actual road alignment rather than assumed street names.

No railroad is mapped inside Amaya or within one mile outside the community boundary, and no street and rail crossings are mapped. There are no named streams inside or within one mile outside the boundary, but 0.29 miles of unnamed drainage is mapped in the community. No street crossing of a named stream is mapped, and no lakes or ponds are mapped within one mile. A drainage route still needs a site review before the bore is set.

Who has to sign off on an Amaya bore in Zavala County?

Because Amaya is an unincorporated community, it has no city government; street authority rests with Zavala County or the state, depending on the road. For work in the US 83 right of way, the utility owner, not the drilling contractor, applies through TxDOT’s RULIS system, and the TxDOT Laredo District reviews it. We prepare the bore plan and profile for the owner’s application. TxDOT rules call for boring or tunneling beneath existing highway pavement, with the bore extending beneath all travel lanes on rural highways.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines serving Amaya in Zavala County?

The water provider for a specific Amaya address must be confirmed with the county or local water district before a bore is planned; public records do not identify a provider for this community. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Zavala County, but that does not establish which company owns a line at a particular address. Before an electric conduit bore near Amaya Road or US 83, we confirm the line owner and expose marked utilities with hydrovac potholing.

Line ownerWhat it isSourceSize
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Zavala CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published for a place as small as Amaya, so the age of buried service lines cannot be estimated from a reliable local survey. At 0.23 square miles, each route needs address level planning along Amaya Road or US 83. Zavala County averages 21.9 inches of precipitation a year, with September the wettest month at 3.0 inches; we check actual ground conditions and pothole marked lines before drilling near them.

Mini excavator digging beside a pad mounted electrical transformer with red dirt spoil and a vacuum excavation trailer on site
Digging beside a pad mounted electric transformer with a vacuum excavation trailer on site.

Where is Amaya in relation to Loma Grande?

Amaya is an unincorporated community in Zavala County, 0.6 miles south of Loma Grande and 1.7 miles north of Crystal City. The mapped community covers 0.23 square miles and sits at an elevation of 580 feet. Its ZIP code is 78839. Crystal City, the county seat and nearest larger city, is 1.7 miles south. From Trinity’s Yukon, Oklahoma main office, the drive to Amaya is 591 road miles and 11.5 hours, which affects mobilization planning for work near US 83.

Places near Amaya

Which jobs call for a bore along Amaya Road?

  • Highway crossing: A line beneath US 83 needs a planned bore that clears the travel lanes and respects the TxDOT right of way.
  • Street service: A water or sewer line along Amaya Road can be routed below the road surface instead of cutting across it.
  • Electric conduit: Near US 83, we confirm the line owner and pothole marked utilities before placing conduit on the planned route.
  • Fiber drop: A fiber route through Amaya can follow the mapped public roads, with the actual service address guiding the bore path.
  • Drainage crossing: The 0.29 miles of unnamed drainage in Amaya calls for a route review and suitable depth before drilling beneath it.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for an Amaya Road boring quote?

Send a map pin or address first, especially for a route near Amaya Road or US 83, because the exact crossing and access points shape the plan. Include what will go underground, the pipe or conduit size and the footage. A sketch or project plans help us review the path and prepare a useful scope.

The mapped clay and sandy clay loam matter because they can affect reaming and the pull. A US 83 crossing adds highway right of way and pavement requirements, while the 591 road miles from Yukon affect mobilization. We also account for line size and length, utilities to expose, concrete or pavement, drainage crossings, pits, excavator time and backfill. Those route details, rather than one measure alone, determine the work involved.

Questions people ask about boring in Amaya

Does Trinity take directional boring jobs in Amaya, Zavala County, and who staffs them?

Yes, we take directional boring work in Amaya, and the job is handled by our own crews or partner contractors whose drilling work Trinity has vetted. The customer works with Trinity from the first call through the bore log, regardless of which crew is on site. US 83 and Amaya Road are useful route references when requesting a review.

Is there rock near the surface in Amaya?

Weathered bedrock is mapped within five feet across 64 percent of Amaya, with a typical mapped depth of 54 inches. Hard bedrock is not mapped within that depth, but the El Pico Clay geologic unit includes sandstone. A route may encounter weathered material, so the soil map is a planning guide rather than a site boring.

Who do we ask at TxDOT Laredo District to approve a bore under US 83 in Amaya?

The utility owner applies for work in the US 83 right of way through TxDOT’s RULIS system; Trinity supplies the bore plan and profile for that filing. The TxDOT Laredo District reviews it. TxDOT rules require boring or tunneling beneath existing highway pavement, and the permit may set the required depth.

Which company owns electric lines at an Amaya address in Zavala County?

The specific line owner must be confirmed before planning an electric conduit bore in Amaya. AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Zavala County, but that does not identify the provider at every address. We pothole marked lines near Amaya Road before drilling close to them.

Does Zavala County or a city control Amaya streets, and must Amaya Road be cut?

Amaya is unincorporated and has no city government, so street authority is with the county or state according to the road. Directional boring can route a line under Amaya Road without cutting its surface. Work in the US 83 right of way is reviewed by TxDOT, not a local city government.

What ground does a bore meet in Amaya’s Tonio soil?

The USDA soil survey maps Tonio fine sandy loam under 64 percent of Amaya. At about 40 inches below the surface, sandy clay loam is mapped under 86 percent and clay under 13 percent. Clay can cling to tooling, so we plan fluid and reaming around the soil pattern and confirm conditions along the route.

Can I reach Trinity after hours about an urgent bore in Amaya, Zavala County?

Yes, a person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent job near US 83 or Amaya Road, share the location and the immediate work need so we can discuss the scope and response.

How early do I need to call 811 before a bore on Amaya Road?

For an Amaya Road bore, Texas811 needs the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before work. For permits through TxDOT Laredo District, if our start slips more than 14 days past the original notice, we submit a new request. Before work continues along Amaya Road, we have worn or moved marks refreshed through Texas811.

How does the US 83 crossing affect directional bore costs in Amaya?

The route, length and line size are central, and the mapped clay around Amaya can affect drilling and reaming. A US 83 crossing adds right of way and pavement requirements. We also consider marked utilities to expose, drainage, pits, backfill, concrete and mobilization from Yukon, which is 591 road miles from the community.

Where the Amaya facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Amaya

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Amaya, Texas

Type the address of your job in Amaya. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Amaya

Same county: La Pryor · Batesville. All counties: Texas county list.