Batesville Texas Directional Boring: Uvalde Clay Loam, US 57 and Leona River
Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), work in Batesville for routes beneath the Leona River and Childers Creek. Batesville is 561 road miles from our Yukon, Oklahoma main office, and we staff work with our crews and vetted partner contractor yards along routes such as US 57. The USDA soil survey maps Uvalde clay loam across much of Batesville, where sticky clay can build on a reamer and grip pipe. We plan the reaming and pull around that ground.
Batesville bores at a glance
- Unincorporated community in Zavala County, Texas. Population 787 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 561 miles, about 10.8 hours of driving.
- Ground: Uvalde soil is mapped on 87 percent of the area, with clay loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: US 57 and FM 117. State permit office: TxDOT Laredo District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Leona River, Childers Creek, Childers Slough and Gallina Creek.
- Public water: Batesville Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near US 57 in Batesville?
Trinity Boring Solutions takes directional boring work in Batesville, Zavala County, including routes for water, sewer, gas, electric conduit and fiber beneath roads such as US 57 and FM 117. The Census Bureau counted 787 people in Batesville in the 2020 Census; it does not publish yearly estimates for this unincorporated place. Batesville is 561 road miles from our Yukon yard, and we schedule crews from there and vetted partner yards.
Our main office is in Yukon, Oklahoma, and Batesville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe beneath the Arkansas River in Tulsa, Oklahoma. A Batesville bore along US 57 is a different scale of job, planned around its route, ground and crossings.

What is Batesville’s Uvalde soil like to bore?
The USDA soil survey maps Uvalde soil across 87 percent of Batesville, with Uvalde clay loam map units covering most of the community. At about 40 inches below the surface, the survey maps clay loam across 92 percent of the area and reports average clay content of 38 percent. That is a sticky, heavy clay profile, not a sand route. It can hold an open hole, ball up on a reamer and swell against pipe. These are mapped soil patterns, not test borings, so the route still needs field checks.
| USDA soil survey, inside the Batesville mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Uvalde 87 percent, Winterhaven 5 percent and Conalb 3 percent |
| Texture at the surface | clay loam 89 percent, silty clay loam 7 percent and loam 3 percent |
| Texture about 40 inches down | clay loam 92 percent, clay 4 percent and very fine sandy loam 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 92 percent, silt (ML) 5 percent and fat clay (CH) 3 percent |
| Average clay content about 40 inches down | 38 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 10 percent of the area |
| High corrosion risk for uncoated steel | 92 percent of the area |
For Batesville, USDA mapping places no bedrock within the upper five feet, though that says nothing about deeper rock. Seasonal water tables are not mapped, while flood prone soils cover 10 percent of the area, so a Leona River route needs depth planning. High steel corrosion risk is mapped across 92 percent; the line owner should weigh casing and tracer wire materials. Cenozoic alluvium, undivided, and Eocene Middle Eocene sedimentary units are mapped here, so ground can vary along a bore.
How do crews bore Batesville’s clay loam?
Batesville’s mapped clay loam calls for controlled fluid and staged reaming. Along a route near the Leona River, we adjust to the actual ground instead of treating the soil map as a site test.
- Uvalde clay loam can cling to the reamer, so we use a thinner fluid mix with polymer and open the Batesville hole in controlled stages.
- Because the mapped Batesville soil is heavy clay, we watch fluid returns near pavement to avoid pressure lifting a road surface.
- We lay out pipe before the final ream near routes such as Main Street, then pull it while the hole is freshly opened.
- At a Leona River route, we track the drill head from the surface and log depth and pitch as the bore advances.

Where might a Batesville bore pass under the Leona River?
Batesville routes can cross US 57 or FM 117, both mapped inside the community, so we plan the bore around the actual road alignment. Old Loma Vista Road is the longest named street at 2.18 miles inside the boundary, followed by River Route Road at 2.02 miles and Main Street at 1.5 miles. Those roads give a route its own access and pavement conditions. A bore can keep a street surface intact when the entry and exit pits fit beyond the traveled way.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 57 | US highway | 1.5 roadway miles inside | State highway office |
| FM 117 | State highway | 8.4 roadway miles inside | State highway office |
| Leona River | Stream | 4.86 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Childers Creek | Stream | 2.26 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Childers Slough | Stream | 2.02 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Gallina Creek | Stream | 0.17 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Rock Quarry Creek | Stream nearby | 0.4 miles outside | Checked for Corps of Engineers jurisdiction |
| Gallina Slough | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad alignment is mapped inside Batesville or within one mile outside its boundary, so a mapped local rail crossing is not part of the route picture. The Leona River runs 4.86 channel miles inside the community; Childers Creek and Childers Slough are also mapped streams. Public mapping shows six street crossings of named streams, which makes creek locations worth checking against the proposed path. No lakes or ponds are mapped within one mile of Batesville, so we account for that mapping when planning boring along Main Street.
Who approves a bore in Batesville and Zavala County?
Batesville has no city government, so a street bore on Main Street or River Route Road is handled according to whether the road belongs to Zavala County or the state. US 57 and FM 117 are state highways, and work in their right of way needs a TxDOT utility permit reviewed by the TxDOT Laredo District. The utility owner files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that filing. A Leona River crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. No railroad route is mapped nearby.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Whose lines are buried near Batesville Water Supply Corporation?
Batesville Water Supply Corporation is the local government owned public water system, using groundwater wells for 1,182 people through 394 service connections. For an electric conduit route on US 57 or another Batesville road, AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative are the providers reporting service in Zavala County. We identify the actual line owner for the specific route before planning conduit, rather than assuming one provider serves every address.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Batesville Water Supply Corporation | Public water system | Groundwater wells | 394 connections, 1,182 people served |
| AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative | Electric utilities reporting service in Zavala County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Batesville’s median housing year at 1986; 7 percent of homes predate 1960, 70 percent date from 1960 to 1999 and 23 percent were built in 2000 or later. That age range can mean a replacement bore follows older service lines, while newer construction may need a first connection. Before a drill approaches marked lines near the water system or an electric route, we use hydrovac potholing to expose them because surface marks show position, not depth.

How far is Batesville from Uvalde Estates and our Yukon yard?
Batesville is an unincorporated census designated place in Zavala County, at 706 feet elevation across 5.91 square miles. ZIP code 78829 serves the community. La Pryor is 13.2 miles west, while Uvalde Estates is 19.5 miles northwest; Uvalde, the nearest larger city, is 20.2 miles northwest. Crystal City, the county seat, is 21.7 miles southwest. Batesville is 561 road miles and a 10.8 hour drive from our Yukon, Oklahoma yard, which matters when planning mobilization for work near FM 117.
Places near Batesville
- Directional boring in La Pryor: 13.2 miles west
- Directional boring in Uvalde Estates: 19.5 miles northwest
- Directional boring in Loma Grande: 20.1 miles southwest
- Directional boring in Uvalde: 20.2 miles northwest
- Directional boring in Amaya: 20.7 miles southwest
What boring work comes up on Batesville’s Main Street?
- Highway crossing: A route under US 57 or FM 117 uses a bore beneath the traveled way, with pits set outside the road surface.
- Water service: A connection near Batesville Water Supply Corporation can run under a street without opening a trench across the pavement.
- Fiber route: A conduit path along Main Street can avoid cutting the street when entry and exit pits fit the route.
- Creek crossing: A bore beneath the Leona River needs a planned depth and a check for federal jurisdiction during planning.
- Street replacement: A route near River Route Road can replace an older buried line while keeping the road surface uncut.
- Rural service: A line toward La Pryor can be scoped around the actual access, footage and utility crossings outside Batesville.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Batesville bore near Old Loma Vista Road?
A map pin matters near Old Loma Vista Road because the route may sit close to a street crossing or a Leona River approach. For a Batesville quote, send the location, what will go underground, the pipe or conduit size and the footage. A sketch or plans help us see entry pits, crossings and access before we set the scope.
The price depends on the route and work, not one measure alone. Batesville’s clay loam affects drilling and reaming; crossings of US 57, FM 117 or the Leona River add planning and exposure needs. Pipe size and footage matter, as do marked utilities, pavement, pit work and sand backfill. The 561 road miles from Yukon can affect mobilization, while emergency or high profile work can change the plan.
Questions people ask about boring in Batesville
Does Trinity Boring Solutions take jobs in Batesville and Zavala County, and how are crews assigned?
Yes, we take directional boring work in Batesville and across Texas. The job is staffed with our own crews or from satellite yards operated by partner drilling contractors we have vetted. The main office is in Yukon, Oklahoma, and we stay the customer contact from the first call through the bore log for a route near US 57.
Can you bore a line beneath the Leona River in Batesville?
A bore beneath the Leona River can be planned, with the route and depth set for the channel crossing. The stream runs 4.86 channel miles inside Batesville, so the proposed path needs a site review and a check for U.S. Army Corps of Engineers jurisdiction during planning. Access and ground conditions also shape the plan.
Who runs Batesville’s water system, and where does its water come from in Zavala County?
Batesville Water Supply Corporation runs the local government owned public water system, and its source is groundwater wells. In Zavala County, the system serves 1,182 people through 394 service connections, which we account for in underground work planning. For a bore near the water lines, we locate and expose marked utilities before drilling close to them.
Who owns electric lines in Batesville and Zavala County, and who confirms conduit details?
AEP Texas Central, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Zavala County. Those records do not identify the provider at every Batesville address, so the line owner must be confirmed for the specific route before conduit specifications are set. A planned run near FM 117 needs that check.
Who is responsible for Batesville’s Main Street, and can a bore avoid cutting it?
Batesville has no city government, so Main Street responsibility follows county or state road ownership. A directional bore can pass beneath the street without cutting its surface when the route and pit locations allow. We check the actual road alignment and utility marks before setting the bore path.
How old are homes and buried lines near Batesville’s River Route Road?
The American Community Survey 2019 to 2023 estimates put Batesville’s median housing year at 1986, but that does not date buried pipes on River Route Road. A replacement bore follows the verified line route, with marked utilities exposed before drilling nearby. New service routes need the same locate and route checks.
Does Trinity cover La Pryor and rural sites outside Batesville?
Yes, we take work in Texas beyond Batesville, including La Pryor and rural routes when the scope fits. La Pryor is 13.2 miles west of Batesville. For work beyond the mapped community boundary, the address or map pin helps us assess the route, access, footage and mobilization.
How early should I request Texas811 marks for a Batesville bore near Old Loma Vista Road?
For work near Old Loma Vista Road, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For work along US 57 in Batesville, if the start slips more than 14 days past the original notice, we submit a new request. At Childers Creek, we refresh worn or moved marks through Texas811 before continuing work.
What affects the cost of directional boring in Batesville along US 57?
For a Batesville route along US 57, cost factors include length, pipe or conduit size, Uvalde clay loam, utility crossings, pavement, pits and mobilization from Yukon. A Leona River crossing or work near marked services can add planning and exposure work. High profile or emergency timing can also change the job scope.
Where the Batesville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Batesville
- U.S. Census Bureau, TIGER/Line 2024: Batesville boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Batesville population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Batesville housing units and year built
- Macrostrat geologic map compilation: map units under Batesville
- U.S. EPA Safe Drinking Water Information System: public water systems serving Batesville
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Zavala County
- U.S. Geological Survey, Elevation Point Query Service: Batesville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Batesville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Batesville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Batesville, Texas
Type the address of your job in Batesville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Batesville
Same county: Crystal City · Chula Vista. All counties: Texas county list.