trinityboringsolutions.com

Sunset Valley Texas Directional Boring: Eckrant Soil, US 290 and Williamson Creek

Quick Answer: In Sunset Valley, Trinity uses directional boring, also called horizontal directional drilling (HDD), to route lines beneath US 290 without cutting pavement. The city is 407 road miles from our Yukon, Oklahoma main office, and Brodie Lane is another local route a proposed line may follow. Eckrant soil is common here. Its stony clay can cling to tooling and grip pipe, so we adjust fluid and ream in stages near Williamson Creek.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Sunset Valley bores at a glance

  • Incorporated city in Travis County, Texas. Population 617 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 407 miles, about 7.9 hours of driving.
  • Ground: Eckrant soil is mapped on 33 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 88 percent of the area.
  • Highways inside the boundary: US 290 and Texas State Highway 71. State permit office: TxDOT Austin District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Williamson Creek.
  • Public water: City of Sunset Valley, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Sunset Valley near US 290?

Trinity Boring Solutions takes directional boring work in incorporated Sunset Valley, Travis County, where the Census Bureau Vintage 2024 estimate is 617 residents. Along Brodie Lane or Ernest Robles Way, our crews can place water, sewer, gas, electric conduit and fiber beneath pavement or driveways, with the route set to the project plan.

Our main office is in Yukon, Oklahoma, and Sunset Valley work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The family business dates to 1965; directional boring became part of our work in 1982. For a route near US 290, our equipment range spans 3/4 inch service lines to 48 inch casing.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What is Eckrant soil like to bore in Sunset Valley?

The USDA soil survey maps Eckrant as the leading soil series in Sunset Valley, covering 33 percent of the mapped area. Surface texture is clay across 36 percent and very stony clay across 33 percent. At about 40 inches below the surface, the survey maps bedrock across 87 percent of the area, with stratified very gravelly coarse sand to very gravelly sand across 7 percent. For Sunset Valley, we treat these mapped patterns as planning guidance, not test borings, before choosing a boring approach. Clay can hold an open hole but stick to the reamer and grip pipe, while stones call for close steering checks.

USDA soil survey, inside the Sunset Valley city limitsWhat is mapped
Soil series mappedEckrant 33 percent, San Saba 19 percent, Crawford 13 percent, Denton 11 percent and Speck 10 percent
Texture at the surfaceclay 36 percent, very stony clay 33 percent and silty clay 13 percent
Texture about 40 inches downbedrock 87 percent and stratified very gravelly coarse sand to very gravelly sand 7 percent
Engineering class about 40 inches downsilty gravel (GM) 7 percent and fat clay (CH) 4 percent
Average clay content about 40 inches down23 percent
Bedrock mapped within 60 inches88 percent of the area (87 percent hard rock, 1 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils7 percent of the area
High corrosion risk for uncoated steel92 percent of the area

The survey maps bedrock within 60 inches across 88 percent of Sunset Valley, including hard bedrock across 87 percent and weathered bedrock across 1 percent; typical depth is 23 inches. That can slow drilling and make the soil to rock contact a steering concern. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 7 percent, so Williamson Creek routes still need channel planning. Across Sunset Valley, we account for high steel corrosion risk mapped across 92 percent when planning underground work and selecting materials. The mapped geology includes High gravel deposits of Pleistocene age and Early Cretaceous sedimentary units, so the actual route may encounter gravel or rock.

How do we bore through bedrock in Sunset Valley?

For a Sunset Valley route through Eckrant soil and shallow mapped bedrock, we match the tooling and fluid plan to the ground, then track the drill beneath streets such as Brodie Lane.

  1. Because Eckrant soil includes stony clay, we use a fluid plan that limits sticky buildup, ream in stages and aim to pull the pipe soon after opening the hole.
  2. Where the soil survey maps shallow hard bedrock, we select rock capable tooling and allow for slower progress and steering changes at the soil to rock contact.
  3. We hydrovac pothole marked utilities on a planned route near the City of Sunset Valley water system before drilling close to them; paint shows position, not depth.
  4. Along Brodie Lane or near Williamson Creek, we track the drill head from the surface and log depth and pitch as the bore advances.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What does a bore have to cross in Sunset Valley near Brodie Lane?

US 290 and Texas State Highway 71 run inside Sunset Valley, with mapped roadway lengths of 2.7 miles and 2.1 miles in the city. Loop 343, Loop 1 and Loop 360 lie just outside the limits. Brodie Lane is the longest named street at 2.06 miles; Ernest Robles Way runs 1.19 miles, and Pillow Road runs 0.99 miles. A proposed route along these roads can involve pavement, driveways and existing lines, so its path and launch pits matter.

CrossingTypeMapped extentWho has a say
US 290US highway2.7 roadway miles insideState highway office
Texas State Highway 71State highway2.1 roadway miles insideState highway office
Loop 343Highway nearby0.1 miles outsideState highway office
Loop 1Highway nearby0.2 miles outsideState highway office
Loop 360Highway nearby0.4 miles outsideState highway office
Union PacificRailroad nearby0.9 miles outsideThe railroad
Williamson CreekStream2.09 channel miles insideChecked for Corps of Engineers jurisdiction
Williamson Creek BranchStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Barton CreekStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
WilliamsonStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Gaines CreekStream nearby0.3 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific track lies 0.9 miles outside Sunset Valley, and no street and rail crossing is mapped inside the city. Williamson Creek runs 2.09 channel miles within the limits, with four mapped street crossings of named streams. Williamson Creek Branch and Barton Creek touch or run along the boundary. For Sunset Valley boring plans, we find no lakes or ponds mapped within one mile, a detail we consider when reviewing water constraints. Creek routes need depth planning beneath the channel, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Whose permission does a Sunset Valley bore in Travis County need?

Sunset Valley is incorporated, so its city streets belong to the city itself; US 290 and Texas State Highway 71 are state highways reviewed by the TxDOT Austin District. The line owner, not Trinity, submits a right of way utility application through TxDOT’s RULIS system, and we prepare the bore plan and profile for that filing. TxDOT rules call for at least 60 inches of cover at highway crossings for electric, communication and water lines, and 60 inches for pressurized sewer. A different depth may be set in the permit. Work beneath existing highway pavement is bored or tunneled, with crossings encased. Williamson Creek crossings are checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines near the City of Sunset Valley water system?

The City of Sunset Valley public water system uses purchased surface water and reports 508 service connections serving 1,524 people. A planned water bore near that system still needs its route and existing lines checked. Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric Cooperative report electric service in Travis County; we confirm the line owner for an electric conduit route before planning it. Hydrovac potholing can expose marked water or electric lines before a bore approaches them.

Line ownerWhat it isSourceSize
City of Sunset ValleyPublic water systemSurface water bought from another system508 connections, 1,524 people served
Oncor Electric Delivery Company, Austin Energy, Bluebonnet Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Travis CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Sunset Valley’s median housing year at 1997; 18 percent of homes were built before 1960, 38 percent from 1960 to 1999 and 44 percent in 2000 or later. That mix may mean either a replacement route or a newer service, but it does not date a buried line on Ernest Robles Way. We pothole marked utilities along the planned path before drilling near them.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Do you cover Sunset Valley and nearby Rollingwood?

Sunset Valley is an incorporated city in Travis County, covering 1.4 square miles at an elevation of 684 feet. When we prepare a Sunset Valley boring request, we use ZIP codes 78745 and 78735 to identify the service area. Rollingwood is 3.7 miles northeast, West Lake Hills is 4.5 miles north, and Shady Hollow is 5.1 miles southwest. Austin, the county seat and nearest larger city, is 6.2 miles northeast. Our Yukon, Oklahoma main office is 407 road miles away, a 7.9 hour drive, which can affect mobilization for a Brodie Lane project.

Places near Sunset Valley

What kinds of bores come up in Sunset Valley near Ernest Robles Way?

  • Highway crossing: A route beneath US 290 is bored or tunneled, with the line owner handling the TxDOT utility permit for the highway right of way.
  • Water service: A connection near the City of Sunset Valley system can be routed beneath a driveway or street after marked lines are exposed.
  • Fiber route: A conduit bore along Ernest Robles Way can avoid opening the paved street when access and existing utilities allow.
  • Creek crossing: A Williamson Creek bore needs a planned path beneath the channel and a check for U.S. Army Corps of Engineers jurisdiction.
  • Electric conduit: Near Brodie Lane, we confirm the line owner before planning the route and pothole marked utilities along its path.
  • Replacement line: A service near Pillow Road can be bored around existing pavement and driveways after the old line route and proposed size are reviewed.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of a Sunset Valley bore near Williamson Creek?

For a Sunset Valley quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. A route along Williamson Creek or beneath US 290 is useful to identify early because crossings can change the equipment, access and planning needed.

In Sunset Valley, we base each boring price on the job details, so the scope and site conditions shape our estimate. A short, direct route along Ernest Robles Way may be simpler to plan than a longer path through Eckrant soil and shallow bedrock. Pipe size, footage, rock, utilities that need exposure, pavement, pits and creek crossings all affect the work. A US 290 crossing can add permit and casing requirements, while mobilization reflects the 407 road miles from Yukon. Emergency timing or difficult access can also change the scope.

Questions people ask about boring in Sunset Valley

Does Trinity take directional boring work in Sunset Valley and Travis County, and who staffs it?

Yes, Trinity takes directional boring work in Sunset Valley, Travis County, using our crews and partner drilling contractors vetted by Trinity. You work with Trinity from the first call through the bore log, even when a partner crew is on site. Brodie Lane or US 290 can help locate the proposed route.

What do Sunset Valley homes near Ernest Robles Way mean for replacement bores?

The American Community Survey 2019 to 2023 estimates put the median housing year in Sunset Valley at 1997. Homes along Ernest Robles Way may call for either replacement work or a new service, but a home’s age does not establish the age or location of its buried line. We expose marked utilities along the planned bore path before drilling near them.

Does Eckrant soil in Sunset Valley corrode steel, and what pipe can a bore use?

The USDA soil survey maps high steel corrosion risk across 92 percent of Sunset Valley, including areas with Eckrant soil. The line owner can consider casing and tracer wire materials for the specific route. HDPE is not subject to the mapped steel corrosion concern, and the pipe choice depends on the line design and owner.

What ground does an Eckrant soil bore in Sunset Valley pass through?

Eckrant is the largest mapped soil series in Sunset Valley at 33 percent. Surface textures include clay and very stony clay, while about 40 inches down the survey maps bedrock across 87 percent and very gravelly coarse sand to very gravelly sand across 7 percent. Those mapped conditions guide tooling, but they are not test borings.

Will a directional bore in Sunset Valley encounter rock?

Rock is mapped shallow across much of Sunset Valley: bedrock appears within 60 inches across 88 percent of the area, and hard bedrock across 87 percent. Weathered bedrock is mapped across 1 percent. A typical mapped bedrock depth is 23 inches, so a route near Williamson Creek still needs site specific planning.

Who approves a Sunset Valley bore under US 290, and which state office reviews it?

The utility line owner applies for the US 290 right of way permit through TxDOT’s RULIS system; Trinity supplies the bore plan and profile. The TxDOT Austin District reviews the application. Required cover depends on line type, and the permit may set another depth. Existing highway pavement is bored or tunneled rather than cut open.

How much notice does Texas811 need for a Sunset Valley bore along Brodie Lane?

For a bore along Brodie Lane, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. For Sunset Valley work, we submit a new request if the start moves more than 14 days past the original notice. On Sunset Valley projects, we refresh worn or moved marks through Texas811 before we continue work, keeping the marked route current.

How far is Sunset Valley from our Yukon office, and does Austin affect the job?

We plan Sunset Valley travel from our Yukon, Oklahoma main office around 407 road miles and a 7.9 hour drive. Austin is 6.2 miles northeast of the city, but that does not remove the distance for equipment mobilization. A route near US 290 or Williamson Creek can also affect access and planning.

What affects the cost of a Sunset Valley directional bore under US 290?

The job scope sets the price, including footage, pipe size, soil and rock, utility crossings, pavement, pits and creek work. US 290 brings highway permit and crossing details into the plan, while Eckrant soil and shallow bedrock can affect drilling time. Mobilization also reflects the distance from our Yukon main office.

Where the Sunset Valley facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Sunset Valley

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Sunset Valley, Texas

Type the address of your job in Sunset Valley. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Sunset Valley

Same county: Pflugerville · Manor · Lakeway · Leander · Wells Branch · Lago Vista · Bee Cave · Hornsby Bend · Cedar Park · Hudson Bend · Jonestown · Briarcliff. All counties: Texas county list.