trinityboringsolutions.com

Franklin Texas Directional Boring: Rader Fine Sandy Loam, US 79 and Union Pacific

Quick Answer: Before a Franklin bore, identify the City of Franklin water system and the electric line owner serving the specific address. Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), in Texas for routes beneath US 79 and other Franklin streets. Franklin is 369 road miles from our Yukon, Oklahoma main office, and the Union Pacific track is another route feature to plan around. Rader fine sandy loam covers 35 percent of mapped ground, while clay at depth can grip the reamer and pipe.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Franklin bores at a glance

  • County seat of Robertson County, Texas. Population 1,792 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 369 miles, about 7.1 hours of driving.
  • Ground: Rader soil is mapped on 35 percent of the area, with sandy clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 16 percent of the area.
  • Highways inside the boundary: US 79, FM 1644, FM 46 and FM 2446. State permit office: TxDOT Bryan District.
  • Railroad track inside the boundary: Union Pacific, with 4 mapped street and rail crossings.
  • Public water: City of Franklin, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Franklin near US 79?

Trinity Boring Solutions takes directional boring work in Franklin, identifying the City of Franklin water system and Robertson County electric providers before setting a route. The Census Bureau Vintage 2024 estimate puts Franklin at 1,792 people. We install water, sewer, gas, electric conduit and fiber along routes such as US 79 or beneath streets where existing lines need protection.

Our main office is in Yukon, Oklahoma, and Franklin work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. With the City of Franklin water system and electric routes to protect, our family business dates to 1965 and our directional boring work dates to 1982. For Franklin planning, we report our record of no utility strike in over 25 years.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Franklin’s Rader soil present?

Franklin’s mapped ground is led by Rader fine sandy loam, which covers 35 percent of the city area in the USDA soil survey. Tabor and Hearne fine sandy loam each cover 16 percent, while Rosanky fine sandy loam covers 12 percent. Surface texture is mostly fine sandy loam at 79 percent, with loamy fine sand at 18 percent. About 40 inches down, sandy clay is mapped under 35 percent of the area, and clay loam under 28 percent. These are mapped patterns, not test borings, so the route still needs field checks.

USDA soil survey, inside the Franklin city limitsWhat is mapped
Soil series mappedRader 35 percent, Tabor 16 percent, Hearne 16 percent, Rosanky 12 percent and Silstid 8 percent
Texture at the surfacefine sandy loam 79 percent, loamy fine sand 18 percent and loam 3 percent
Texture about 40 inches downsandy clay 35 percent, clay loam 28 percent and clay 19 percent
Engineering class about 40 inches downfat clay (CH) 54 percent, lean clay (CL) 38 percent and clayey sand (SC) 8 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inches16 percent of the area (0 percent hard rock, 16 percent weathered rock)
Seasonal water table within 60 inches54 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel73 percent of the area

At about 40 inches, the USDA soil survey maps CH or heavy clay across 54 percent of Franklin and CL clay across 38 percent. Sticky clay can load a reamer and grip pipe, so fluid returns and pull timing matter. Seasonal water table is mapped within 40 inches across 54 percent, which can put water in pits. For Franklin bore planning, we do not show flood prone soils as mapped. High steel corrosion risk covers 73 percent. The Reklaw Formation, Eocene sandstone and silty clay, is mapped here; weathered bedrock occurs within 60 inches across 16 percent, so the drill may slow or steer differently at that contact.

How do we drill Franklin’s sandy clay ground?

For Franklin’s sandy clay and heavy clay layers, we size the fluid and reaming plan to the route rather than forcing the hole. Rader soil and seasonal water near the surface both affect pit and pull planning.

  1. Because Franklin maps heavy CH clay under 54 percent of its area at about 40 inches, we watch fluid returns and keep pressure controlled near pavement.
  2. Rader fine sandy loam is common near the surface, but deeper clay can grip pipe; staged reaming and a same day pull help manage that change.
  3. With seasonal water table mapped within 40 inches across 54 percent of Franklin, we keep pits manageable and pump water when needed.
  4. We hydrovac each marked utility on the bore path before drilling near it, including a proposed route beside Glass Street, then track depth and pitch from the surface.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

What does a Franklin bore have to cross near Union Pacific?

Franklin’s route choices include US 79, which has 4.3 mapped roadway miles inside the city, plus FM 1644, FM 46 and FM 2446. No state highway is mapped within 1.5 miles outside the limits. Glass Street is the longest named street at 1.92 miles; Center Street runs 1.5 miles and Calvert Street 1.15 miles. A bore under existing highway pavement uses boring or tunneling rather than an open cut, and a rural highway crossing extends beneath all travel lanes. Street length alone does not establish the exact bore path.

CrossingTypeMapped extentWho has a say
US 79US highway4.3 roadway miles insideState highway office
FM 1644State highway1.1 roadway miles insideState highway office
FM 46State highway0.8 roadway miles insideState highway office
FM 2446State highway0.4 roadway miles insideState highway office
Union PacificRailroad1.82 track miles insideThe railroad
Wolf Den BranchStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Touchstone BranchStream nearby0.2 miles outsideChecked for Corps of Engineers jurisdiction
Cedar CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Mud CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

The Union Pacific Hearne Subdivision has 1.82 track miles in Franklin, and public mapping shows 4 street and rail crossings in the city. Any proposed track crossing needs an agreement from Union Pacific, whose terms govern the crossing. No named stream runs inside the city limits, and none is mapped as a street crossing. Wolf Den Branch and Touchstone Branch are each 0.2 miles from the limits, so a route that reaches a channel needs a site specific crossing review. Around Franklin, we plan routes knowing no lakes or ponds are mapped within one mile.

Who has to sign off on a Franklin bore in Robertson County?

Franklin city streets are under city control, while US 79, FM 1644, FM 46 and FM 2446 are state highways under TxDOT. For work in highway right of way, the line owner applies through TxDOT’s RULIS system, and the TxDOT Bryan District reviews it; we prepare the bore plan and profile for the owner’s application. Existing highway pavement is bored or tunneled, with the permit setting the approved depth. A proposed crossing of the Union Pacific Hearne Subdivision also needs a railroad agreement. If a route reaches Wolf Den Branch, planning checks whether the channel crossing is under U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Franklin system?

The City of Franklin public water system uses groundwater wells and serves 1,650 people through 900 service connections. Electric providers reporting service in Robertson County are Entergy Texas, Texas-New Mexico Power, City of Bryan and Navasota Valley Electric Cooperative. Those reports do not identify the provider at every Franklin address, so we confirm the line owner before planning an electric conduit bore near the city water network.

Line ownerWhat it isSourceSize
City of FranklinPublic water systemGroundwater wells900 connections, 1,650 people served
Entergy Texas, Texas-New Mexico Power, City of Bryan and Navasota Valley Electric CooperativeElectric utilities reporting service in Robertson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Franklin’s median housing year at 1978; 24 percent of homes were built before 1960, and 30 percent in 2000 or later. That mix can mean a replacement route beside older service lines or a new connection near newer construction. On a proposed crossing by Glass Street, each marked utility on the bore path gets exposed with hydrovac before drilling near it, since paint shows position but not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Franklin from Calvert and our Yukon yard?

Franklin is the Robertson County seat in Texas, at an elevation of 443 feet across 1.17 square miles, and its ZIP code is 77856. Calvert is 11.4 miles west; Hearne is 12.1 miles southwest; Bremond is 14.8 miles northwest. Bryan, the nearest larger city, is 25.6 miles south. Franklin is 369 road miles and a 7.1 hour drive from our Yukon, Oklahoma yard, so mobilization is part of planning a bore here.

Places near Franklin

Which jobs call for a bore near Franklin’s Center Street?

  • Highway crossing: A route beneath US 79 avoids cutting its pavement and must follow the TxDOT permit for the state right of way.
  • Water service: A new service near the City of Franklin system needs the line owner and existing groundwater well connections identified along its route.
  • Fiber route: A fiber bore along Glass Street can pass below pavement, with marked utilities exposed before the drill approaches them.
  • Rail crossing: A proposed bore beneath the Union Pacific Hearne Subdivision needs the railroad’s agreement and its crossing conditions.
  • Creek crossing: A route toward Wolf Den Branch needs channel conditions and federal jurisdiction checked during planning.
  • Street replacement: A sewer or water replacement bore near Center Street can avoid opening the street surface while crossing existing lines.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Franklin bore near Wolf Den Branch?

A map pin matters in Franklin because a route by US 79 differs from one near Wolf Den Branch. Send the address or pin, what will go in the ground, pipe or conduit size and footage. A sketch or plans help us see the route, access and crossings before we scope the work.

The Franklin job details shape the price: length, pipe or conduit size, Rader soil and deeper clay, plus the utilities that need exposing. A route near US 79 may involve pavement and highway coordination, while a Union Pacific crossing brings railroad conditions into the plan. Pits, excavator time, sand backfill and creek or drainage crossings also affect scope. The 369 road miles from Yukon matter for mobilization, and high profile or emergency work adds planning demands.

Questions people ask about boring in Franklin

Does Trinity take directional boring work in Franklin and Robertson County?

Yes, Trinity Boring Solutions takes directional boring work in Franklin, Robertson County. Our Yukon main office coordinates the job, with our crews and vetted partner drilling contractors able to staff the work. We stay your contact from the first call through the bore log, whether the route follows US 79 or another Franklin street.

Who controls Calvert Street in Franklin, and does a bore require cutting it?

Calvert Street is a Franklin city street, and a bore can often pass beneath the surface rather than opening a trench. The exact route and utility clearances determine the method. Before drilling near a marked line, we expose it with hydrovac so its depth is known, not just its painted position.

Can a replacement bore near Center Street work around older Franklin lines?

Yes, a replacement bore near Center Street can be planned around existing utilities after their locations are checked. The American Community Survey 2019 to 2023 estimates put Franklin’s median housing year at 1978, with 24 percent built before 1960. That age mix makes careful locating and potholing important before a new route is drilled.

Could wet ground near Wolf Den Branch affect bore pits in Franklin?

It can affect pit planning: seasonal water table is mapped within 40 inches across 54 percent of Franklin, so pits may take on water. Wolf Den Branch is 0.2 miles from the city limits, and a route reaching its channel needs a site specific review. Flood prone soils are not mapped in the city.

Does Rader soil in Franklin create a corrosion concern for steel pipe?

The USDA soil survey maps high steel corrosion risk across 73 percent of Franklin, so the line owner should consider steel casing and tracer wire materials. Rader fine sandy loam is the largest mapped soil series. HDPE is not affected by soil corrosion, while the line owner selects any coating for steel.

What ground should I expect through Rader soil in Franklin?

Rader fine sandy loam covers 35 percent of Franklin’s mapped area, according to the USDA soil survey. About 40 inches down, sandy clay is mapped under 35 percent and clay loam under 28 percent. Those are survey patterns, not test borings, so the actual route may vary and needs field planning.

Does Trinity cover Calvert and rural sites outside Franklin?

Yes, Trinity takes work in Texas beyond Franklin, including nearby Calvert and rural routes outside city limits. Calvert is 11.4 miles west of Franklin. We plan each site from its address, route, ground and crossings, while coordination for a highway or railroad crossing depends on the route.

How much Texas811 notice does a Franklin bore near Glass Street need?

For a bore near Glass Street, request the Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. For Franklin work, if our start slips more than 14 days past the original notice, we submit a new request. Before continuing Franklin work, we refresh worn or moved marks through Texas811.

What affects the cost of a directional bore beneath US 79 in Franklin?

The price depends on the route and scope, not just its length. US 79 pavement, TxDOT coordination, Rader soil and deeper clay, utility exposure, pipe size, pits and mobilization from Yukon can all affect the work. A Union Pacific crossing or a route near Wolf Den Branch adds crossing conditions to assess before pricing.

Where the Franklin facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Franklin

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Franklin, Texas

Type the address of your job in Franklin. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Franklin

All counties: Texas county list.