Quick Answer: Directional boring in McAlester, OK installs water, sewer, gas, electric, and fiber lines under roads, driveways, and landscaping without open cuts. Trinity Boring Solutions crews come from Yukon, about 144 road miles away, for road and turnpike crossings, service laterals and conduit runs. Every crossing gets an Okie811 ticket and hydrovac potholing. Call (405) 409-7423.

For directional boring, directional drilling and road bores in McAlester, Oklahoma, Trinity Boring Solutions Inc. installs water, sewer, natural gas and propane, electric and fiber lines. We have been family owned since 1965 and in underground construction since 1982, with our own crews and rigs based at 9102 Northwest Expy, Yukon, OK 73099. Call (405) 409-7423 any hour of the day. Our licensed HDD crews serve McAlester and all of Pittsburg County 24 hours a day, 7 days a week – for planned projects and emergency utility repairs.

Whether you need a new water line bored under your McAlester driveway, a gas line installed for a commercial development, electrical conduit routed under a parking lot, or fiber optic cable directionally bored under a McAlester street, our crew shows up with the rig, the locator and the hydrovac truck to finish it.

Every crew member is trained in safe boring practices, utility locating, and restoration – ensuring your property looks great when we leave.

McAlester on the Map: Highways, Turnpike and Drive Time

McAlester is the seat of Pittsburg County and sits near the center of the county on State Highway 31, where US 69 crosses US 270, according to the Encyclopedia of Oklahoma History and Culture. The town grew up around coal: J. J. McAlester is called the founder of the Oklahoma coal industry, and the Missouri, Kansas and Texas Railway came through his crossroads, per the encyclopedia entry on J. J. McAlester.

The Indian Nation Turnpike crosses Pittsburg County from north to south; its McAlester to Henryetta section was dedicated in 1966 and the section to Hugo opened in 1970, per the Pittsburg County entry, which also lists Alderson, Krebs, Hartshorne, Haileyville, Savanna, Indianola, Canadian, Kiowa, Quinton and Crowder among the county towns. McAlester counted 18,171 people in the 2020 Census on 17.85 square miles of land, with an estimated 18,044 in July 2025, per Census QuickFacts.

From our Yukon office it is about 144 road miles to McAlester, roughly two and a half hours by way of Interstate 40 and the Indian Nation Turnpike (OpenStreetMap route). Jobs within about four hours of Yukon can have a crew the same day, and McAlester is inside that range.

Directional boring in McAlester, answered in one paragraph. Trinity Boring Solutions is a family owned horizontal directional drilling contractor based in the Oklahoma City metro since 1965. We install water, sewer, natural gas, electric and fiber lines under roads, driveways, parking lots, creeks and existing utilities across McAlester and the rest of Oklahoma, with one crew handling Okie811 locates, hydrovac potholing, the bore, pullback and pit restoration. Call (405) 409-7423, answered 24 hours a day.

Trinity Boring Solutions at a glance

  • Serves McAlester. About 144 road miles and roughly two and a half hours from our office at 9102 Northwest Expy, Yukon, OK 73099, so a McAlester job can have a crew the same day.
  • Since 1965. Family owned. Dean Rice started the company in 1965 as an irrigation contractor, and it has done underground construction since 1982. Today Trinity is a directional boring contractor serving Oklahoma and Texas.
  • Oklahoma City metro based. Headquartered at 9102 Northwest Expy, Yukon, OK 73099, in the Oklahoma City metro. Crews and rigs cover all 77 Oklahoma counties and all of Texas, from Dallas, Fort Worth and Plano down to Houston. Jobs within about four hours of Yukon can have a crew the same day.
  • Owns its equipment. Vermeer and Ditch Witch HDD rigs, auger boring machines and hydrovac trucks, all owned outright and run by Trinity operators.
  • One crew, whole job. 811 locates and hydrovac potholing, horizontal directional drilling, auger boring with steel casing, trenching, backfill and pit restoration from the same company, so there is no handoff between a locator, a driller and an excavator.
  • Range. 3/4 inch service lines to 48 inch pipe, and bores from 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, for water, sewer, natural gas and propane, electric and fiber.
  • Named work. A single shot just under 4,000 feet under the Arkansas River; a 48 inch HDPE water intake line out to the middle of Fort Cobb Lake; a bore beneath the John Kilpatrick Turnpike in Oklahoma City (watch the video); 840 feet of FAA conduit under runways at Will Rogers World Airport; 385 foot sandstone rock bore under creeks, a wetland and a dam in Guthrie; 6 inch PVC sleeve under NE 24th Street and a live water main at the Clara Luper Center; propane line on a hospital campus in Anadarko; emergency water line at a Stillwater sorority house.
  • Pricing. No per foot rate. A bore is priced on its conditions: soil and rock, pipe size, what it crosses, grade, existing utilities, depth and access. How a bore is priced.
  • Safety. An Okie811 ticket in Oklahoma, a Texas811 ticket in Texas, and hydrovac potholing on every crossing.
  • 24 hour phone. (405) 409-7423 is answered around the clock, with emergency crews for gas and water lines.

Common questions about directional boring in McAlester

How much does directional boring cost in McAlester?

Bore length and conduit size give Trinity Boring Solutions a general range for directional boring in McAlester. Soil and rock, what the bore crosses, grade requirements, existing utilities, depth and access set where the number falls inside that range, so each bore is priced after we know those. Send the address, what you need installed and where it has to go, and you get one written number.

What can Trinity bore under in McAlester?

Roads, driveways, sidewalks, parking lots, landscaping, creeks and drainage, and existing utility corridors. Trinity installs water, sewer, natural gas and propane, electric conduit and fiber from 3/4 inch service lines up to 48 inch steel casing, and handles Okie811 locates and hydrovac potholing before the drill head goes in the ground.

How fast can Trinity Boring Solutions get to McAlester?

McAlester is about 144 road miles from Yukon, roughly two and a half hours by Interstate 40 and the Indian Nation Turnpike. The phone, (405) 409-7423, is answered 24 hours a day, and emergency gas and water line work can have a crew there the same day. Scheduled bores are quoted first so the price, the locate tickets and any permits are ready before the crew arrives.

Directional Boring Services Available in McAlester, OK

Our McAlester boring and utility crews provide a full range of underground utility installation services:

  • Horizontal Directional Drilling (HDD) – trenchless boring under roads, driveways, and structures in McAlester
  • Water Line Boring – residential service lines, commercial water mains, fire hydrant leads
  • Gas Line Boring – natural gas and propane service line installation in McAlester
  • Electrical Conduit Boring – underground power conduit for homes, businesses, and street lighting
  • Fiber Optic & Telecom Boring – broadband, cable, and data conduit for McAlester connectivity projects
  • Sewer Line Installation – trenchless sewer boring and open-cut sewer installation
  • Irrigation Line Boring – under driveways and walkways for residential and commercial irrigation
  • Trenching Services – open-cut utility trenching where boring isn’t feasible
  • Hydrovac & Daylighting: exposing marked lines with water and vacuum so the bore path clears them, see hydrovac daylighting
  • Jack & Bore: steel casing pushed under highways and rail lines near McAlester, see jack and bore
  • 24/7 Emergency Utility Response: a person answers (405) 409-7423 at any hour, and gas and water line emergencies in McAlester can have a crew the same day

Each of our services is backed by our full licensing, bonding, and insurance coverage. In Pittsburg County, as everywhere in Oklahoma, we call in an Okie811 notice before digging and pothole the marked lines on each crossing.

Need a boring crew in McAlester today? Trinity Boring Solutions is available 24/7 – call now for a fast quote.

Who Hires Us for Directional Boring in McAlester

We work with a wide range of clients for directional boring projects in McAlester, Oklahoma. Our customers include:

  • Homeowners – boring a water line, gas line, or irrigation sleeve under a McAlester driveway or sidewalk without tearing up landscaping
  • Licensed Plumbers – subcontracting trenchless water and sewer bore work on jobs that require specialized HDD equipment
  • Electricians – underground conduit installations on McAlester residential and commercial jobs requiring precise bore paths
  • General Contractors – underground utility coordination for McAlester commercial builds, new subdivisions, and mixed-use developments
  • Municipalities – boring under McAlester streets for water main extensions, fiber optic deployment, and sewer system upgrades
  • Telecom & Fiber Companies – broadband and last-mile connectivity in McAlester neighborhoods and business districts
  • Real Estate Developers – new subdivision and commercial site utility installation throughout Pittsburg County

No matter your project type or scale, Trinity Boring Solutions brings the same professionalism and attention to detail. Permits and traffic control stay with the customer or general contractor; our crew bores to the approved plan and works with the city inspector when one is assigned.

Why McAlester Contractors and Property Owners Choose Trinity Boring Solutions

When you hire Trinity Boring Solutions for directional boring in McAlester, one company handles the locate, the bore and the cleanup. Here is what sets us apart:

  • Family owned since 1965: an Oklahoma company with its office and yard in Yukon
  • Licensed, bonded, and fully insured for all Oklahoma boring and underground utility work
  • Locates and potholing: an Okie811 ticket on every crossing, and marked lines exposed with hydrovac before drilling near them
  • Rigs we own: Vermeer and Ditch Witch HDD rigs and auger boring machines, from 3/4 inch service lines to 48 inch pipe
  • Located drill head: the head is tracked through the shot so the line lands where the plan puts it
  • Backfill and restoration: we close and restore the pits when the line is in
  • Phone answered around the clock: (405) 409-7423
  • One price per bore: a lump sum set from the site conditions you send us

How Directional Boring Works in McAlester

Horizontal directional drilling (HDD) is a trenchless method of installing underground utilities without open-cut excavation. Here is the basic process our McAlester boring crews follow:

  1. Utility locating: An Okie811 notice goes in, the utility owners mark their lines, and we pothole the marks with hydrovac
  2. Entry pit excavation – A small pit is dug at the starting point of the bore
  3. Pilot bore: The operator steers the drill head along the planned path while a locator tracks it from the surface
  4. Reaming – The bore hole is enlarged to the required diameter using a reamer pulled back through the hole
  5. Product installation – The utility pipe or conduit is pulled through the completed bore hole
  6. Restoration – Entry and exit pits are backfilled and surface conditions are restored

The entire process typically preserves your driveway, landscaping, sidewalks, and pavement – which is why HDD is the preferred method for most McAlester residential and commercial utility installations.

McAlester Rock: Shale, Sandstone and Old Coal Country

McAlester sits on Pennsylvanian rock. The McAlester Formation takes its name from exposures around the city and is mostly shale with sandstone beds and coal, according to the USGS geologic names database. A USGS study at the Army Ammunition Plant southwest of town describes the nearby rocks as shales and fine grained sandstones of the Krebs Group, with the Boggy Formation made of brown to dark gray shale containing numerous thin sandstone beds and in part very dense. Check the soil mapped over that rock on your lot in the USDA NRCS Web Soil Survey.

  • Thin soil over shale and sandstone means a McAlester bore can go from dirt to rock within a few feet, so we plan rock tooling before mobilizing when the plan calls for depth.
  • Hard sandstone beds between softer shale can push the drill head off line, so the locator checks the head often through those layers.
  • When a run needs casing or the rock is too hard for a small rig, we look at auger boring with steel casing instead.

Permits, Okie811 and Highway or Turnpike Crossings

Inside city limits, the City of McAlester Community Development Department licenses and registers contractors, reviews plans, issues permits and inspects projects, and it asks developers and contractors to schedule an advance visit to learn which permits apply. Building permits and contractor licenses are filed through the city’s OpenGov permit portal. The city contact list gives Community Development at (918) 423-9300 extension 4984 and Public Works at extension 4997; City Hall is at 28 E Washington Avenue. The customer or general contractor pulls the permits and handles traffic control, and Trinity bores to the approved plan.

US 69, US 270, State Highway 1 and State Highway 31 crossings need an ODOT Utility Permit for Federal or State Highways, issued to the utility owner or applicant. It calls for the top of the conduit to be at least 60 inches below the top of pavement and not less than 30 inches below the bottom of the ditches, allows drilling fluid only at 6 feet or more below the pavement, and does not allow HDPE or PVC under the highway without steel or equivalent conduit. Pittsburg County is in ODOT Division 2, Antlers, (580) 298-3371, and the ODOT Pittsburg County maintenance office is at 711 US Highway 69B in McAlester, (918) 423-5769. The Indian Nation Turnpike is Oklahoma Turnpike Authority right of way and needs a separate OTA License for Right of Way Access, with pipe at least 48 inches below subgrade and not less than 30 inches below the bottom of the ditches.

OKIE811 asks for notice at least 48 hours before digging, excluding the date of notification, Saturdays, Sundays and legal holidays. Our Oklahoma 811 utility locating guide explains the marks and colors.

Who Owns the Lines Under McAlester

The City of McAlester runs the water and sewer system; its Public Works and Utility Maintenance Department covers streets, traffic control, utility maintenance and wastewater treatment. Utility Maintenance repairs the city sewer and water lines, and water the city saves stays in McAlester Lake, per a Bureau of Reclamation grant document. A March 2025 city manager report lists separate West and East wastewater plants. The city contact list gives Utilities at (918) 423-9300 extension 4990.

McAlester is on the Summit Utilities service area list for natural gas; Summit took over the former CenterPoint Energy system in Oklahoma, and its gas leak line is 800-992-7552; for a gas emergency, call 911 first. The state utilities by city list shows Public Service Company of Oklahoma (PSO) as the electric provider for McAlester.

Areas We Serve Near McAlester, Oklahoma

Around McAlester we cover Pittsburg County towns such as Krebs, Alderson, Hartshorne, Haileyville and Savanna, plus lake country toward Eufaula and south to Atoka. See our Pittsburg County directional boring page for the rest of the county.

McAlester is about two and a half hours from Yukon, inside the four hour range where a job can have a crew the same day. Planned work is priced first so locates and permits are in hand before the rig rolls.

Free Bore Planner

Plan Your Bore in McAlester, Oklahoma

Type the address of your job in McAlester. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Frequently Asked Questions – Directional Boring in McAlester, OK

How much does directional boring cost in McAlester, Oklahoma?

We don’t quote by the foot. Each McAlester bore is priced on its own conditions: shale or sandstone, pipe size, length, what it crosses, grade, existing lines, depth and pit access. A turnpike crossing that needs casing or a shot through hard sandstone takes more work than a driveway in dirt. Send the address, the utility, the pipe size and photos, and we will quote one lump sum. Call (405) 409-7423.

How long does a directional bore take in McAlester?

It depends on the ground and the length. A short crossing in soil can be done in a day once the crew arrives, while long runs, rock or several lines take longer. Before the crew drills, the Okie811 notice needs at least 48 hours, not counting the day of notice, weekends and legal holidays, and the crew drives about two and a half hours from Yukon.

Do you offer 24/7 emergency boring service in McAlester?

Yes. Call (405) 409-7423 at any hour. McAlester is about 144 road miles from Yukon, inside our four hour range, so a gas or water line emergency can have a crew the same day. If you smell gas, leave the area, call 911 and the Summit Utilities leak line at 800-992-7552 first. City water and sewer main problems go to the city’s Utilities line at (918) 423-9300 extension 4990.

What is the difference between directional boring and trenching in McAlester?

A bore goes under the surface from pit to pit, so pavement, driveways and yards stay put; a trench opens the whole route. In McAlester, shallow rock can make a long trench slow and rough to restore, which often favors boring for crossings. Open ground with no rock may trench faster. Many jobs mix the two. Read our trenching vs boring comparison.

Are you licensed and insured to work in McAlester, Oklahoma?

Yes. Trinity Boring Solutions is fully licensed, bonded, and insured for directional boring and underground utility work in McAlester and throughout Oklahoma. We carry general liability insurance and meet all state and local requirements for underground utility contractors in Pittsburg County. Proof of insurance and licensing is available upon request for any McAlester project.

Do you bore under the Indian Nation Turnpike or US 69 in McAlester?

Yes, once the crossing is permitted. US 69, US 270, State Highway 1 and State Highway 31 need an ODOT utility permit, and the Indian Nation Turnpike needs an Oklahoma Turnpike Authority license with pipe at least 48 inches below subgrade. The customer or general contractor pulls those and handles traffic control, and we bore to the approved plan, with steel casing where it is required. See road and highway utility work.

Do you offer underground utility locating in McAlester?

Locating starts with OKIE811: you or your contractor give notice, and each member utility marks its own lines. We call in the ticket on every crossing, then expose the marked lines with hydrovac so the crew sees their depth before drilling. Private lines such as a shop feed, sprinkler line or septic line are not marked by OKIE811 members, so tell us where you think they run.

Who do I call about a city water or sewer problem in McAlester?

The City of McAlester owns the water and sewer mains, so start with the city’s Utilities line at (918) 423-9300 extension 4990, or the main City Hall number at (918) 423-9300. If the broken line is your service between the meter and the house, or your sewer lateral, we can bore a replacement without trenching the yard. Call us at (405) 409-7423.

Can you bore through the shale and sandstone around McAlester?

Yes. McAlester sits on Pennsylvanian shale with sandstone beds, and that rock can come up within a few feet of the surface. Shale usually drills steadily, while hard sandstone layers wear tooling and can deflect the drill head. We plan rock tooling and check steering often in those layers. If a run is better done with casing, we can auger bore it instead.

Do you do backhoe and trenching work in McAlester?

Yes, as part of a utility job. Our crews dig entry and exit pits, trench open stretches where boring is not needed, backfill and restore the ground when the line is in. We do not rent out a backhoe by the hour for unrelated dirt work. If your project mixes a bore under a road with a trench across open ground, one crew can do both.

Get a Free Quote for Directional Boring in McAlester, OK

Ready to get your underground utility project moving in McAlester? Contact Trinity Boring Solutions for a free, no-obligation quote. We serve McAlester and all of Pittsburg County around the clock – for both planned installations and emergency utility response.

To price a McAlester bore, send us:

  • The job address and closest cross street.
  • Which utility: water, sewer, natural gas or propane, electric or fiber.
  • Pipe size and material, such as HDPE for water, or the PVC your sewer spec calls for.
  • How far the bore runs and what it goes under: driveway, street, highway, turnpike, creek or other lines.
  • Required depth or slope.
  • Rock, shale, sandstone or standing water you have seen on site.
  • Space for a pit at each end.
  • Plans or photos of both ends.
  • Where the permit and the Okie811 ticket stand.

We will send back a lump sum and the next steps.

Call (405) 409-7423 at any hour, or send a request online.

Request a Free Quote | About Our HDD Services | 24/7 Emergency Services | Water Line Services | Gas Line Services

Trinity Boring Solutions Vermeer directional drill and crew set up for a bore

Located in Pittsburg County, Oklahoma, McAlester is about 144 road miles from our Yukon office and serves as the county seat. The city counted 18,171 people in the 2020 Census, and its homes, farms and businesses depend on underground utility work that avoids tearing up streets and yards. Trinity Boring Solutions brings drill rigs, locating support and hydrovac trucks to McAlester year round. Call (405) 409-7423 for a bore quote.

Map of McAlester, Oklahoma

Directional boring service area map for McAlester, Oklahoma. Call (405) 409-7423 with the address or cross streets of your bore.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to just under 4,000 feet in a single shot, with longer runs bored in sections, 3/4 inch service line through 48 inch pipe, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for McAlester

State: Oklahoma directional boring. All counties: Oklahoma county list. Oklahoma and Texas: directional boring service area.