trinityboringsolutions.com

Alanreed Texas Directional Boring: Mansker Clay Loam, Interstate 40 and FM 291

Quick Answer: Mansker clay loam is mapped in Alanreed, and clay can cling to the reamer as a bore advances. We take directional boring, also called horizontal directional drilling (HDD), work under Interstate 40 and other routes in Alanreed. The Yukon, Oklahoma main office is 191 road miles away, with FM 291 among the local routes to plan around. Staged reaming and a same day pull can help manage sticky Mansker ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Alanreed bores at a glance

  • Unincorporated community in Gray County, Texas. Population 23 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 191 miles, about 3.6 hours of driving.
  • Ground: Mansker soil is mapped on 30 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 40 and FM 291. State permit office: TxDOT Amarillo District.
  • Railroad track inside the boundary: none mapped.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Interstate 40 in Alanreed?

Mansker clay loam is a local ground condition to account for when planning a line. We take directional boring work in Alanreed, an unincorporated community in Gray County. The Census Bureau counted 23 residents in 2020; it does not publish yearly estimates for places this small. We install water, sewer, gas, electric conduit and fiber, routing them under streets such as 4th Avenue when the site plan calls for it.

Our main office is in Yukon, Oklahoma, and Alanreed work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have drilled directionally since 1982. With Southwestern Electric Power, Southwestern Public Service and Greenbelt Electric Cooperative reporting service in Gray County, our record of no utility strikes in over 25 years matters when planning around buried lines.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What is Mansker soil like to bore in Alanreed?

The USDA soil survey maps Mansker among the main soil series in Alanreed, including Mansker clay loam on slopes. At about 40 inches below the surface, clay loam covers 38 percent of the mapped area; very gravelly fine sandy loam covers 28 percent, and fine sandy loam covers 25 percent. Average clay content at that depth is 22 percent, while sandy ground is mapped across 25 percent. Mansker and Catesby soil survey patterns help us plan, but they are not test borings. Clay can cling to a reamer, while gravelly layers call for careful steering.

USDA soil survey, inside the Alanreed mapped community boundaryWhat is mapped
Soil series mappedMansker 30 percent, Catesby 28 percent, Mobeetie 25 percent, Miles 9 percent and Bippus 8 percent
Texture at the surfacefine sandy loam 42 percent, clay loam 30 percent and loam 28 percent
Texture about 40 inches downclay loam 38 percent, very gravelly fine sandy loam 28 percent and fine sandy loam 25 percent
Engineering class about 40 inches downlean clay (CL) 38 percent, silty clayey gravel (GC GM) 28 percent and silty clayey sand (SC SM) 25 percent
Average clay content about 40 inches down22 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped within the top five feet in Alanreed, but the geologic map identifies the Pliocene Ogallala Formation beneath the area, with sand, silt, clay, gravel and caliche. That map does not determine the material at a specific bore depth. Seasonal water table soils and flood prone soils are not mapped here. High steel corrosion risk is not mapped either, though the line owner should choose any casing or tracer wire protection. A gravelly layer can deflect the drill head, so depth and pitch checks matter.

What does it take to bore Alanreed clay loam?

The USDA survey maps both Mansker clay loam and gravelly fine sandy loam in Alanreed. We match the fluid and reaming plan to the ground along the actual route, not just the soil name.

  1. In Mansker clay loam, we can use thinner drilling fluid and staged reaming to reduce sticky buildup, then pull the pipe the same day the hole is opened.
  2. Where the Alanreed survey maps gravelly fine sandy loam, we stage the reaming and have the pipe ready before the final pass to limit cave in risk.
  3. Near Interstate 40 or FM 291, we keep fluid pressure controlled under pavement and check the drill head depth and pitch as each rod advances.
  4. Before a bore near 4th Avenue, we hydrovac expose marked utilities on the path; locator paint shows position, not burial depth.
6 inch PVC sleeve coming out of the bore pit wall in red sandy soil with the Trinity water trailer behind, northeast Oklahoma City
A 6 inch PVC sleeve coming out of the bore pit wall in red sandy soil in northeast Oklahoma City.

Where does a line have to go under Interstate 40 in Alanreed?

Interstate 40 has 1.1 mapped roadway miles inside the Alanreed community boundary, and FM 291 has 1.3. A line crossing either route needs a route plan that accounts for the highway right of way. The longest named local streets include 4th Avenue and 3rd Avenue, each with 0.69 miles in the community, followed by Bb Road with 0.56 miles. A bore can pass below pavement rather than cut those streets, with its path set after utilities and access are checked.

CrossingTypeMapped extentWho has a say
Interstate 40Interstate1.1 roadway miles insideState highway office
FM 291State highway1.3 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside the Alanreed boundary or within one mile outside it, so there is no mapped track route to plan around. No street and rail crossings are mapped here. No named stream or lake is mapped inside the community, and no street crossing of a named stream is mapped. The map does show 0.2 miles of unnamed drainage, so a route near that feature still needs site review. For Interstate 40 work in Alanreed, our map shows no lakes or ponds within one mile.

Do I need a permit to bore under roads in Gray County near Alanreed?

Alanreed has no city government, so local streets are a county matter, while Interstate 40 and FM 291 are state routes. For work in their right of way, the utility that owns the line files the TxDOT application through RULIS; we prepare the bore plan and profile for that filing. The TxDOT Amarillo District reviews it. At highway crossings, electric and communication lines need 60 inches of cover below the lowest crossed grade, water needs 60 inches, and pressurized sewer needs 60 inches. Along the right of way, the listed cover is 48 inches for electric and communication lines and 36 inches for water; a permit can set another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the utility lines in Gray County near Alanreed?

Before planning a bore on Main, we confirm the address’s water provider with Gray County or the local water district. EPA drinking water records do not identify a system matched to this place. Southwestern Electric Power, Southwestern Public Service and Greenbelt Electric Cooperative report electric service in Gray County, but that does not establish which company owns a line at a particular address. We hydrovac pothole marked lines near the planned path, including water and electric facilities, before drilling close to them.

Line ownerWhat it isSourceSize
Southwestern Electric Power, Southwestern Public Service and Greenbelt Electric CooperativeElectric utilities reporting service in Gray CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing data is not published reliably for a place as small as Alanreed, so the route matters more than a townwide housing age estimate. On a long service run near Bb Road or 4th Avenue, the existing line and the proposed connection need to be located before the bore. Gray County averages 22.7 inches of precipitation a year, with June the wettest month at 3.2 inches on average. We expose marked utilities by hydrovac before the drill approaches them; surface paint shows position, not depth.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Alanreed from McLean and the Yukon yard?

Alanreed is in Gray County at an elevation of 3,010 feet and covers 0.46 square miles. Its ZIP code is 79002. McLean is 7.6 miles east, while Howardwick is 15.7 miles southwest and Lefors is 16.2 miles north. Pampa, the county seat and nearest larger city listed, is 26.6 miles northwest. The Yukon, Oklahoma yard is 191 road miles away, a drive of 3.6 hours. That distance is part of planning a crew and equipment move for work near Interstate 40 or FM 291.

Places near Alanreed

What kinds of bores come up near 3rd Avenue in Alanreed?

  • Highway crossing: A route under Interstate 40 or FM 291 can keep a new utility line below pavement instead of cutting across the road.
  • Water service: A connection near Bb Road needs its address specific water provider confirmed before the bore route is set.
  • Fiber conduit: A conduit run near 3rd Avenue can follow a planned path under the street, with existing marked utilities exposed first.
  • Street service: A line near 4th Avenue can be installed below the roadway when the route and entry pits fit the site.
  • Electric conduit: Near FM 291, we first confirm the electric line owner and conduit requirements for the specific address.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near 4th Avenue in Alanreed?

For a quote near 4th Avenue, start with the address or a map pin so we can place the route. Tell us what is going in the ground, such as a water line or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans help show how the path relates to Interstate 40, FM 291 or existing services.

Price follows the work at the site. Mansker clay loam can affect drilling and reaming, while gravelly soil may call for extra steering checks. The number of utilities to expose, crossings under Interstate 40 or FM 291, pavement, drainage, pits and excavator time all change the scope. Mobilization planning accounts for 191 road miles from Yukon’s main office before we schedule Alanreed work. Pipe size, bore length, sand backfill and emergency or high profile work are other factors.

Questions people ask about boring in Alanreed

Does Trinity take directional boring jobs in Alanreed, Gray County, and who staffs them?

Yes. We take directional boring work in Alanreed, and the job is handled by our own crews or a crew from a satellite yard run by a drilling contractor we have vetted. You work with Trinity through the bore log, regardless of which crew is on site near Interstate 40 or 4th Avenue.

Who is responsible for Bb Road in Alanreed, and can a bore avoid cutting it?

Alanreed is unincorporated and has no city government, so local streets such as Bb Road fall to the county rather than a city department. A directional bore can pass under the roadway without opening a trench through the street, subject to the route, access and utility checks.

What ground does a bore encounter in Alanreed near Mansker soil?

The USDA soil survey maps Mansker clay loam in Alanreed, and clay loam accounts for 38 percent of mapped soil at about 40 inches. Clay may cling to the reamer, while very gravelly fine sandy loam is also mapped at that depth. The survey describes mapped patterns, not conditions verified by a test boring.

Can we encounter deeper rock beneath mapped Mansker soils during a directional bore in Alanreed?

We plan each Main crossing with this limit in mind: bedrock is not mapped in Alanreed’s top five feet, but deeper rock remains possible. The geologic map shows the Pliocene Ogallala Formation, which includes sand, silt, clay, gravel and caliche. We use the route and actual drilling conditions to guide the bore rather than treating the map as a site test.

Who approves a bore under Interstate 40 in Alanreed?

For work in the Interstate 40 right of way, the utility that owns the line submits the application in TxDOT’s RULIS system. The TxDOT Amarillo District reviews it, and we prepare the bore plan and profile for the utility owner’s filing. Required cover depends on the line type and the crossing conditions.

Which electric company owns a line in Alanreed, Gray County, and who confirms conduit specs?

Southwestern Electric Power, Southwestern Public Service and Greenbelt Electric Cooperative report electric service in Gray County, but that does not identify the owner at every Alanreed address. We confirm the line owner and conduit requirements for the specific route before planning a bore near 4th Avenue or FM 291.

Does Trinity cover McLean and rural sites outside Alanreed?

Yes. We take work in McLean and at rural sites outside the Alanreed community boundary. McLean is 7.6 miles east of Alanreed, and our Yukon yard is 191 road miles away. Share the location and route so we can account for access and mobilization.

How much notice does Texas811 need for a bore near 4th Avenue in Alanreed?

For a bore near 4th Avenue, make the Texas811 locate request at least 48 hours before excavation, not counting Saturdays, Sundays or legal holidays, and no earlier than 14 days before the start. If work slips more than 14 days past the original notice, submit a new request. Before work resumes along FM 291, we refresh any marks that have worn or shifted.

What affects the cost of a directional bore under Interstate 40 in Alanreed?

The price depends on the planned job, including bore length and pipe size, Mansker clay loam or gravelly ground, utilities to expose, pavement, pits and drainage crossings. Work under Interstate 40 can add crossing and permit planning. Mobilization from Yukon also matters because the yard is 191 road miles from Alanreed.

Where the Alanreed facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Alanreed

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Alanreed, Texas

Type the address of your job in Alanreed. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Alanreed

All counties: Texas county list.