trinityboringsolutions.com

Uvalde Texas Directional Boring: Clay Loam, US 90, Leona River

Quick Answer: Can we get your line beneath US 90, the Union Pacific track or the Leona River without cutting across it? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Uvalde, Texas, for those crossings. Uvalde is 560 road miles from our Yukon, Oklahoma main office, so distance affects mobilization for work near Main Street. Uvalde clay loam can grip the pipe, so we plan staged reaming and a timely pull. The Leona River and marked utilities also shape the route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Uvalde bores at a glance

  • County seat of Uvalde County, Texas. Population 15,589 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 560 miles, about 10.9 hours of driving.
  • Ground: Uvalde soil is mapped on 59 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 90, US 83, FM 1435, FM 117 and FM 1023. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Leona River, Cooks Slough and Taylor Slough.
  • Public water: City of Uvalde, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring under Main Street in Uvalde?

Trinity Boring Solutions takes directional boring work in Uvalde County, where the Census Bureau Vintage 2024 estimate puts the population at 15,589. Along Main Street, Park Street or US 90, we can install water, sewer, gas, electric conduit and fiber lines by boring beneath the surface. That lets your line pass under pavement, while entry and exit pits sit off the crossing.

Our main office is in Yukon, Oklahoma, and Uvalde work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. For a Main Street service or a Leona River crossing, our work ranges from 3/4 inch service lines to 48 inch casing and from 10 feet to 5,000 feet.

Ditch Witch directional drill rig with a loaded drill rod rack staged at a commercial jobsite
Our Ditch Witch directional drill with a full rack of drill rod staged at a commercial site. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Uvalde ground?

The USDA soil survey maps Uvalde soil across 59 percent of Uvalde, with Uvalde clay loam map units covering 51 percent of the city. About 40 inches down, clay loam accounts for 59 percent of mapped texture, silty clay loam for 27 percent and clay for 7 percent. The survey also maps an average clay content of 38 percent at that depth. For Uvalde, we treat mapped patterns as planning context, not test borings, before setting a bore path. The clay rich ground can cling to a reamer and grip pipe, so the route needs a controlled fluid plan and staged opening.

USDA soil survey, inside the Uvalde city limitsWhat is mapped
Soil series mappedUvalde 59 percent, Knippa 21 percent, Olmos 6 percent, Oakalla 6 percent and Castroville 4 percent
Texture at the surfaceclay loam 63 percent, clay 24 percent and very cobbly loam 6 percent
Texture about 40 inches downclay loam 59 percent, silty clay loam 27 percent and clay 7 percent
Engineering class about 40 inches downlean clay (CL) 91 percent and fat clay (CH) 3 percent
Average clay content about 40 inches down38 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils7 percent of the area
High corrosion risk for uncoated steel87 percent of the area

Bedrock is not mapped in the top five feet of Uvalde, and seasonal water tables are not mapped there either. Flood prone soils cover 7 percent of the mapped area, while high steel corrosion risk is mapped across 87 percent. The geologic map shows Alluvium, undivided, of Cenozoic age, and Late Cretaceous sedimentary material. The Leona River makes channel depth a planning concern where a route crosses it. The line owner should consider casing and tracer wire materials; HDPE avoids the mapped soil corrosion concern.

How is a bore run through Uvalde clay loam?

Uvalde clay loam can stick to the reamer and tighten around pipe. For a route near Main Street or the Leona River, we control fluid, open the hole in stages and prepare the pipe before the final pull.

  1. Uvalde clay loam can build up on the reamer, so we use a controlled fluid mix and open the hole in stages before pulling pipe.
  2. The mapped clay content is 38 percent at about 40 inches, so we watch fluid returns near Main Street pavement to avoid lifting the surface.
  3. Before drilling near a marked line on Park Street, we expose it with hydrovac potholing; surface paint shows its position but not its depth.
  4. We track the drill head from the surface and log depth and pitch as it advances, with extra attention to alignment near the Leona River channel.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

What is in the way of a new line in Uvalde near US 90?

US 90 has 5.8 mapped roadway miles inside Uvalde, and US 83 has 3.7. FM 1435, FM 117 and FM 1023 also pass within the city limits. Main Street is the longest named street at 4.97 miles, followed by Park Street at 3.16 miles and Getty Street at 3.06 miles. A bore beneath one of these roads can keep the pavement intact, but the route and access pits need to fit the specific crossing and right of way.

CrossingTypeMapped extentWho has a say
US 90US highway5.8 roadway miles insideState highway office
US 83US highway3.7 roadway miles insideState highway office
FM 1435State highway3.3 roadway miles insideState highway office
FM 117State highway3.2 roadway miles insideState highway office
FM 1023State highway1.4 roadway miles insideState highway office
FM 1052State highway1.1 roadway miles insideState highway office
FM 1574State highway1 roadway miles insideState highway office
FM 862State highway0.8 roadway miles insideState highway office
Texas State Highway 55State highway0.6 roadway miles insideState highway office
Spur 144State highway0.4 roadway miles insideState highway office
FM 2369State highway0.4 roadway miles insideState highway office
FM 481State highway0.3 roadway miles insideState highway office
FM 140State highway0.1 roadway miles insideState highway office
FM 3447State highway0.1 roadway miles insideState highway office
Swipe the table sideways to see every column.

Union Pacific owns 0.72 track miles in Uvalde on its Del Rio Subdivision, and 3 mapped street and rail crossings make track clearance a route issue. The Leona River runs 3.24 channel miles inside the city; Cooks Slough and Taylor Slough add mapped channels. Public records show 14 mapped street crossings of named streams, so a line near Camp Street or a slough needs careful alignment. Across Uvalde, we have no mapped lakes or ponds within one mile, so we plan the bore around site conditions.

Whose permission does a Uvalde bore near Union Pacific need?

For work in the US 90, US 83 or FM road right of way in Uvalde, the utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT San Antonio District reviews it. We prepare the bore plan and profile for the owner’s application and work under the permit issued to that owner. TxDOT requires boring or tunneling beneath existing highway pavement; cover and casing conditions are addressed in the permit. A crossing of the Union Pacific track needs an agreement from the railroad, with its terms governing casing, depth and flagging. Uvalde city streets belong to the city. A Leona River crossing is checked during planning for U.S. Army Corps of Engineers jurisdiction.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground near the City of Uvalde water system?

The City of Uvalde public water system uses groundwater wells and lists 5,606 service connections serving 17,450 people. Those connections make existing water lines a key locate concern along Park Street and Main Street. AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Uvalde County. Before a conduit bore, we confirm which company owns the line at the specific address rather than assume one provider serves every route.

Line ownerWhat it isSourceSize
City of UvaldePublic water systemGroundwater wells5,606 connections, 17,450 people served
AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Uvalde CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

We use the American Community Survey 2019 to 2023 five year estimates, which put Uvalde’s median housing year at 1980, as context for underground planning. We account for Uvalde’s housing mix when planning underground work: 20 percent before 1960, 60 percent from 1960 to 1999 and 20 percent in 2000 or later. A bore on Park Street may replace an older line or serve newer construction, and the route makes a difference. On Uvalde bore paths, we hydrovac pothole every marked utility before drilling near it; paint shows position, not depth. For example, a line planned beneath Main Street needs marked lines exposed before the drill approaches.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

What is near Uvalde, including Uvalde Estates?

Uvalde is the county seat of Uvalde County, with an elevation of 915 feet and a land area of 7.69 square miles. ZIP code 78801 covers the city. Uvalde Estates is 4.8 miles southwest; Knippa is 10.7 miles northeast, and La Pryor is 18.9 miles south. Sabinal lies 19.9 miles east and Batesville 20.2 miles southeast. The city is 560 road miles and a 10.9 hour drive from our Yukon, Oklahoma main office, a distance that affects mobilization for a US 90 or Leona River job.

Places near Uvalde

Which jobs call for a bore near the Leona River in Uvalde?

  • Highway crossing: A bore beneath US 90 can carry water or conduit while leaving the existing pavement uncut.
  • Street service: A water or sewer line beneath Main Street can avoid an open cut across the city’s longest named street.
  • Creek crossing: A route beneath the Leona River keeps the channel and banks uncut while the crossing depth is planned.
  • Rail crossing: A utility beneath the Union Pacific Del Rio Subdivision needs a route coordinated with the track owner’s agreement.
  • Fiber conduit: A bore along Park Street can pass beneath pavement, with marked utilities exposed before drilling near them.
  • Water connection: A service tied to the City of Uvalde system needs its route checked against existing groundwater well connections.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Camp Street in Uvalde?

A map pin matters for a Camp Street quote because the exact crossing determines pavement, utilities and access for the pits. For Uvalde work, send us the address or pin, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route and any nearby lines before we scope the work.

Uvalde is 560 road miles from Yukon, so mobilization is part of a job near US 90 or the Union Pacific track. Uvalde clay loam can affect reaming and pipe pull. Price also reflects bore length and line size, utilities to expose, pavement or concrete, creek or drainage crossings, pits, excavator time and sand backfill. A Leona River crossing, high profile work or an emergency response can change the equipment and planning the job needs.

Questions people ask about boring in Uvalde

Does Trinity Boring Solutions take directional boring work in Uvalde County, and how is the crew assigned?

Yes, we take directional boring jobs in Uvalde County. Our own crews handle the work, and partner drilling contractors we have personally vetted may work from satellite yards. You deal with Trinity through the job, whichever crew is on site. A Main Street or US 90 route still needs its own site plan and utility checks.

What do older homes near Park Street mean for replacement bores in Uvalde?

Uvalde’s housing stock includes homes from several eras, so replacement routes can encounter existing buried lines. The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1980, with 20 percent built before 1960. Along Park Street, we expose marked utilities before drilling near them so the bore plan accounts for what is there.

Does Uvalde soil create a corrosion concern for steel pipe in Uvalde?

Yes, the USDA soil survey maps high steel corrosion risk across 87 percent of Uvalde. The line owner should consider casing and tracer wire materials for a route near Main Street. HDPE avoids this mapped soil corrosion concern. The survey describes mapped conditions, so the owner’s material choice should reflect the actual project.

What ground does a bore pass through in Uvalde soil around 40 inches down?

The USDA soil survey maps clay loam across 59 percent of Uvalde at about 40 inches, with silty clay loam at 27 percent and clay at 7 percent. Uvalde clay loam can cling to a reamer and grip the pipe. That calls for staged reaming and a plan to pull the pipe soon after opening the hole.

Will a directional bore in Uvalde hit rock?

Bedrock is not mapped in Uvalde’s top five feet, but that does not rule out rock deeper down. The geologic map also shows Late Cretaceous sedimentary material beneath the area. A route near the Leona River still needs site specific planning, since mapped geology is not a substitute for checking the actual bore path.

Who approves a bore under US 90 in Uvalde?

The utility owner applies for a TxDOT utility permit through RULIS, and the TxDOT San Antonio District reviews work in the US 90 right of way. We prepare the bore plan and profile for the owner’s application. The permit covers crossing requirements, including depth and casing conditions for the specific US 90 location.

How does Uvalde’s distance from the Yukon main office affect a bore?

Our Yukon, Oklahoma main office is 560 road miles and a 10.9 hour drive from Uvalde, so we plan mobilization accordingly. That distance affects mobilization for a job near US 83 or Camp Street. The route, line size, soil, crossings and access also shape the work, so we scope the specific location before planning the crew and equipment.

How early should I request utility marks for a bore on Main Street in Uvalde?

For a Main Street bore, submit a locate request to Texas811 at least 48 hours before excavation starts, not counting Saturdays, Sundays and legal holidays, and no earlier than 14 days beforehand. For Uvalde requests, if the start slips more than 14 days past the original notice, we ask for a new request. Before work continues in Uvalde, we have worn or moved marks refreshed through Texas811.

What affects the price of directional boring under US 90 in Uvalde?

The US 90 crossing length and pavement, Uvalde clay loam, pipe or conduit size, utilities to expose and access pits all affect the job scope. Mobilization from Yukon also matters for this location. Creek or drainage crossings, excavator time, sand backfill and emergency or high profile work can change the equipment and planning needed.

Where the Uvalde facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Uvalde

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Uvalde, Texas

Type the address of your job in Uvalde. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Uvalde

Same county: Utopia. All counties: Texas county list.