Bluff Dale Texas Directional Boring: Lewisville Clay Loam, US 377 and Paluxy River
Quick Answer: US 377 is a main road to plan around, and Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Bluff Dale and across Texas. From our Yukon, Oklahoma main office, the drive is 267 road miles, so access near Church Street needs planning before mobilization. The USDA soil survey maps Lewisville clay loam across much of Bluff Dale. That sticky ground can cling to the reamer and grip pipe, so we stage the reaming and pull pipe promptly.
Bluff Dale bores at a glance
- Unincorporated community in Erath County, Texas. Population 151 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 267 miles, about 5.3 hours of driving.
- Ground: Lewisville soil is mapped on 55 percent of the area, with clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 1 percent of the area.
- Highways inside the boundary: US 377 and FM 2481. State permit office: TxDOT Fort Worth District.
- Railroad track inside the boundary: Fort Worth and Western Railroad, with 4 mapped street and rail crossings.
- Public water: Bluff Dale Water Supply Corporation, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles boring near US 377 in Bluff Dale?
US 377 runs through Bluff Dale, where Trinity Boring Solutions takes directional boring work for water, sewer, gas, electric conduit and fiber. Those lines may run beneath Church Street, Holt Street or the highway, depending on the route. The Census Bureau counted 151 people in Bluff Dale in the 2020 Census; it does not publish yearly estimates for this unincorporated place. We plan the bore around the route and the marked utilities.
Our main office is in Yukon, Oklahoma, and Bluff Dale work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982; that experience informs planning in Bluff Dale. For a Church Street service or a US 377 crossing, we handle lines from 3/4 inch service size up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet.

What does the soil survey show beneath Bluff Dale and Lewisville soil?
The USDA soil survey maps Lewisville soil across 55 percent of Bluff Dale, Altoga across 23 percent and Venus across 20 percent. Lewisville and Altoga clay loams are common map units, and clay loam makes up 77 percent of the mapped surface texture. At about 40 inches, clay loam is also mapped across 77 percent of the area, with loam across 20 percent. The survey reports an average clay content of 33 percent at that depth. These mapped patterns point to sticky ground that can build up on a reamer and grip the pipe.
| USDA soil survey, inside the Bluff Dale mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Lewisville 55 percent, Altoga 23 percent and Venus 20 percent |
| Texture at the surface | clay loam 77 percent and loam 20 percent |
| Texture about 40 inches down | clay loam 77 percent and loam 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 97 percent |
| Average clay content about 40 inches down | 33 percent |
| Bedrock mapped within 60 inches | 1 percent of the area (0 percent hard rock, 1 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 2 percent of the area |
Across most of Bluff Dale, bedrock is not mapped in the top five feet; the survey maps bedrock within 60 inches in a small area. The geologic map shows the Early Cretaceous Twin Mountains Formation, with sandstone, claystone and conglomerate, so deeper rock or changing material can still affect a route. The USDA soil survey maps no seasonal water table within 60 inches and flood prone soils across 2 percent of the area. High steel corrosion risk is mapped across 2 percent, so the line owner should consider casing and tracer wire materials for a Church Street bore.
How do crews handle Bluff Dale clay loam?
Lewisville and Altoga clay loams cover much of Bluff Dale, so we plan for sticky cuttings rather than treating the route like loose sand. At US 377, we also manage fluid returns carefully near pavement.
- Lewisville clay loam holds an open hole but can stick to the reamer and grip pipe, so we use thinner fluid with polymer and ream in stages.
- On a US 377 route, we watch fluid returns near pavement and keep pressure low enough to avoid lifting the surface.
- Before drilling near a marked line on Holt Street, we hydrovac pothole it; the paint marks its position, not its depth.
- At a Paluxy River route, we plan the depth below the channel and check the crossing for federal waterway jurisdiction.

What does a bore have to cross in Bluff Dale near the Fort Worth and Western Railroad?
US 377 and FM 2481 run through the mapped Bluff Dale community. A line beneath either route needs a path that fits the road right of way and the highway requirements. Church Street is the longest named street in the community, followed by Holmes Street and Holt Street. Their mapped lengths are 0.7 miles, 0.47 miles and 0.38 miles. We can plan a bore beneath pavement rather than cut across it, with the entry and exit pits placed off the traveled surface where the site allows.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 377 | US highway | 1 roadway miles inside | State highway office |
| FM 2481 | State highway | 0.4 roadway miles inside | State highway office |
| Fort Worth and Western Railroad | Railroad | 1.19 track miles inside | The railroad |
| Paluxy River | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| South Paluxy River | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| North Paluxy River | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Wolf Creek | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
The Fort Worth and Western Railroad has 1.19 track miles inside Bluff Dale, and public mapping shows 4 street and rail crossings. No other railroad is mapped within one mile outside the community boundary. The Paluxy River and South Paluxy River run along or touch that boundary; North Paluxy River is 0.2 miles away. No street crossings of named streams are mapped inside Bluff Dale, and no lakes or ponds are mapped within one mile. A creek or river route needs its own crossing review.
Who has to sign off on a Bluff Dale bore in Erath County?
Bluff Dale is an unincorporated community with no city government, so street and permit authority rests with Erath County or the state, depending on the road. Work in the right of way of US 377 or FM 2481 needs a TxDOT utility permit. The utility owner files through TxDOT’s RULIS system, and the TxDOT Fort Worth District reviews it; we prepare the bore plan and profile for that filing. TxDOT cover rules set the bore depth, and lines crossing existing highway pavement are bored or tunneled, encased and extended beneath all rural travel lanes. A Fort Worth and Western Railroad crossing also needs an agreement with the railroad. A Paluxy River crossing is checked for federal waterway jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines near Bluff Dale Water Supply Corporation?
Bluff Dale Water Supply Corporation operates the public water system, using groundwater wells to serve 270 people through 88 service connections. Before planning a water service near Church Street, we confirm the existing line locations and the water line owner. Oncor Electric Delivery Company, Texas-New Mexico Power and United Electric Cooperative Service report electric service in Erath County. Before planning an electric conduit bore at a Bluff Dale address, we confirm the line owner for that specific location.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Bluff Dale Water Supply Corporation | Public water system | Groundwater wells | 88 connections, 270 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power and United Electric Cooperative Service | Electric utilities reporting service in Erath County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Bluff Dale’s median housing year at 1983: 10 percent of homes were built before 1960, 50 percent from 1960 to 1999 and 40 percent in 2000 or later. That mix can mean a route past Holmes Street serves either a replacement or a newer connection. Before drilling near marked water or electric lines, we hydrovac pothole each one on the bore path; paint shows position, not depth.

What is near Bluff Dale, including Tolar?
Bluff Dale is in Erath County, at an elevation of 910 feet, and covers 0.31 square miles within its mapped community boundary. Its ZIP code is 76433. Tolar is 6.7 miles northeast, Lipan is 11.7 miles north, and Stephenville is 14.7 miles southwest. Stephenville is both the county seat and the nearest larger city. From our Yukon, Oklahoma main office, Bluff Dale is 267 road miles away and a 5.3 hour drive. That distance can affect mobilization for a bore near US 377.
Places near Bluff Dale
- Directional boring in Tolar: 6.7 miles northeast
- Directional boring in Lipan: 11.7 miles north
- Directional boring in Stephenville: 14.7 miles southwest
- Directional boring in Oak Trail Shores: 14.8 miles northeast
- Directional boring in Huckabay: 15.6 miles west
What boring work comes up on Holt Street in Bluff Dale?
- Highway crossing: A line under US 377 is planned as a bore beneath the roadway, with the route and cover coordinated through TxDOT.
- Water service: A connection near Church Street can be routed from the Bluff Dale Water Supply Corporation system after existing lines are exposed.
- Rail crossing: A route beneath the Fort Worth and Western Railroad needs the railroad’s agreement and its crossing conditions.
- Creek crossing: A bore near the Paluxy River is planned below the channel, with jurisdiction checked during planning.
- Fiber route: A fiber conduit along Holt Street can pass below pavement while pits stay outside the traveled surface where access allows.
- Electric conduit: Before planning a conduit route near US 377, we confirm which county reported electric line owner serves that address.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Bluff Dale quote near Church Street?
For a Church Street quote, send the address or map pin, what is going in the ground, the pipe or conduit size and footage; a sketch or plans help. Tell us if the route crosses US 377 or the Fort Worth and Western Railroad. That detail helps us see which plans and crossing conditions may shape the bore.
The job route sets the price, and the 267 road miles from Yukon affect mobilization to Bluff Dale. Lewisville clay loam can mean staged reaming and careful fluid control. A US 377 pavement crossing or Fort Worth and Western Railroad agreement adds crossing work. We also consider bore length and line size, utilities to expose, pavement or concrete, creek crossings, pits, excavator time, sand backfill and any high profile or emergency scope.
Questions people ask about boring in Bluff Dale
Does Trinity Boring Solutions take directional boring jobs in Bluff Dale, Erath County?
Yes. We take directional boring work in Bluff Dale and staff it with our own crews or crews from satellite yards run by drilling contractors we have vetted. Our main office is in Yukon, Oklahoma, and Trinity remains your contact from the first call through the bore log, including a route near US 377.
Will a bore in Bluff Dale hit rock beneath the mapped soil?
The USDA soil survey maps bedrock within the top five feet only in a small part of Bluff Dale, not across most of the community. Below that, the geologic map identifies the Early Cretaceous Twin Mountains Formation, including sandstone, claystone and conglomerate. A route near Lewisville soil still needs field checks because mapped conditions are not test borings.
For a bore under US 377 in Bluff Dale, who approves the crossing?
For work in the US 377 right of way, the utility owner applies for a TxDOT utility permit through RULIS. The TxDOT Fort Worth District reviews the application. We prepare the bore plan and profile for the owner, and the permit establishes the required conditions for a crossing in Bluff Dale.
What does a bore under the Fort Worth and Western Railroad in Bluff Dale require?
A crossing under the Fort Worth and Western Railroad needs an agreement from the railroad that owns the track. That agreement sets crossing details such as casing, depth and flagging. Since 1.19 track miles are mapped inside Bluff Dale, the planned route and its relationship to the railroad need to be established before drilling.
Can a line be bored under the Paluxy River near Bluff Dale?
A bore can be planned for a Paluxy River crossing, but the route needs to stay below the channel and be checked for federal waterway jurisdiction during planning. The river runs along or touches the Bluff Dale boundary, so the crossing location and access on each side matter to the plan.
For underground planning in Bluff Dale, who runs the public water system and where does its water come from?
Bluff Dale Water Supply Corporation runs the public water system, and its source is groundwater wells. Public records list 88 service connections serving 270 people. We confirm the existing water line owner and location before planning a new connection near Church Street or another Bluff Dale route.
How much 811 notice do I need for a bore on Church Street in Bluff Dale?
Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days before. Texas811 describes this as at least two working days. If work on Church Street starts more than 14 days after the original notice, make a new request; worn or moved marks must be refreshed before work continues.
How far is Bluff Dale from Yukon, and does nearby Stephenville change the job?
At 267 road miles and a 5.3 hour drive from our Yukon, Oklahoma main office, Bluff Dale calls for travel planning around underground work. Stephenville is 14.7 miles southwest and is the county seat, but the Yukon distance still affects mobilization. The bore route near US 377, access and crossing requirements also shape the work.
What affects the cost of directional boring under US 377 in Bluff Dale?
The job details determine the price, not a single standard rate. For a US 377 crossing, we account for bore length and size, the highway conditions, Lewisville clay loam, utilities to expose, pavement, pits and equipment time. A Fort Worth and Western Railroad or Paluxy River crossing can add different planning and crossing work.
Where the Bluff Dale facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Bluff Dale
- U.S. Census Bureau, TIGER/Line 2024: Bluff Dale boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Bluff Dale population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Bluff Dale housing units and year built
- Macrostrat geologic map compilation: map units under Bluff Dale
- U.S. EPA Safe Drinking Water Information System: public water systems serving Bluff Dale
- U.S. Department of Transportation, North American Rail Network: track owners in Erath County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Erath County
- U.S. Geological Survey, Elevation Point Query Service: Bluff Dale elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Bluff Dale
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Bluff Dale
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Bluff Dale, Texas
Type the address of your job in Bluff Dale. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Bluff Dale
Same county: Dublin · Lingleville. All counties: Texas county list.