trinityboringsolutions.com

Bridgeport Texas Directional Boring: Truce Soil, Union Pacific and West Fork Trinity River

Quick Answer: We take directional boring, also called horizontal directional drilling (HDD), in Bridgeport, Texas, where routes may pass beneath Union Pacific track or the West Fork Trinity River. Our Yukon, Oklahoma main office is 199 road miles away, and US 380 is one route to consider for mobilization. At about 40 inches, clay is mapped across 40 percent of Bridgeport, so sticky cuttings call for controlled fluid and staged reaming. A bore beneath 10th Street can leave the pavement uncut.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Bridgeport bores at a glance

  • Incorporated city in Wise County, Texas. Population 6,763 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 199 miles, about 4 hours of driving.
  • Ground: Truce soil is mapped on 26 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 47 percent of the area.
  • Highways inside the boundary: US 380, Texas State Highway 114, FM 1658, Loop 373 and FM 920. State permit office: TxDOT Fort Worth District.
  • Railroad track inside the boundary: Union Pacific, with 8 mapped street and rail crossings.
  • Named streams inside the boundary: West Fork Trinity River, Dry Creek, Turkey Creek and Ramsey Creek.
  • Public water: City of Bridgeport, surface water.
  • Electric: City of Bridgeport municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Bridgeport and the West Fork Trinity River?

Trinity Boring Solutions takes directional boring work in Bridgeport, an incorporated city in Wise County where routes may follow Cates Street or reach the West Fork Trinity River. The Census Bureau Vintage 2024 estimate puts Bridgeport at 6,763 residents, a figure we consider when planning underground work. We install water, sewer, gas, electric conduit and fiber along local routes, including connections to the City of Bridgeport water system; the route and line owner determine the scope.

Our main office is in Yukon, Oklahoma, and Bridgeport work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Bridgeport’s City of Bridgeport water system and city owned electric system mean existing lines must be located before replacement work. We have had no utility strike in over 25 years, and Bridgeport’s municipal electric system informs our underground planning. Our family business began in 1965, and we have done directional boring since 1982, experience we bring to Bridgeport planning.

Aerial view of Trinity Boring Solutions crew and service van at a multifamily apartment underground utility jobsite in Oklahoma City
Our crew and service van at a multifamily underground utility job in Oklahoma City, seen from above. Photos on this page are from our jobs in Oklahoma and Texas.

How does Truce soil affect drilling in Bridgeport?

The USDA soil survey maps Truce across 26 percent of Bridgeport, including Truce fine sandy loam on 1 to 3 percent slopes across 17 percent and on 3 to 5 percent slopes across 9 percent. Fine sandy loam is the surface texture across 56 percent, while loamy fine sand covers 13 percent. At about 40 inches, clay is mapped across 40 percent and sandy clay loam across 28 percent; sandy clay adds 5 percent. That deeper clay can grip a reamer and pipe, so the route and fluid plan matter.

USDA soil survey, inside the Bridgeport city limitsWhat is mapped
Soil series mappedTruce 26 percent, Bastsil 17 percent, Hassee 9 percent, Bonti 7 percent and Windthorst 6 percent
Texture at the surfacefine sandy loam 56 percent, loamy fine sand 13 percent and very fine sandy loam 6 percent
Texture about 40 inches downclay 40 percent, sandy clay loam 28 percent and bedrock 11 percent
Engineering class about 40 inches downlean clay (CL) 68 percent, fat clay (CH) 15 percent and silty clay (CL ML) 4 percent
Average clay content about 40 inches down37 percent
Bedrock mapped within 60 inches47 percent of the area (4 percent hard rock, 43 percent weathered rock)
Seasonal water table within 60 inches12 percent of the area
Flood prone soils7 percent of the area
High corrosion risk for uncoated steel63 percent of the area

The USDA soil survey maps bedrock within 60 inches across 47 percent of Bridgeport, with typical bedrock depth at 45 inches; the mapped ground may slow drilling or change steering near a soil to rock contact. A seasonal water table is mapped within 60 inches across 12 percent, and flood prone soils across 7 percent, so pits near the West Fork Trinity River need attention to water and channel depth. High steel corrosion risk is mapped across 63 percent, a concern for uncoated casing and tracer wire. The geologic map lists Quaternary terrace deposits and Gzhelian sedimentary rock of Kasimovian age, described as sandstone, shale and coal.

How do we bore through clay in Bridgeport while accounting for its municipal electric system?

For Bridgeport’s mapped clay, we match fluid and reaming to the ground, then track the drill head as it advances. The 40 percent clay share at about 40 inches makes returns and pressure important to watch.

  1. Fluid and reaming: With clay mapped across 40 percent of Bridgeport at about 40 inches, we use thinner fluid with polymer and open the hole in stages to limit sticky buildup.
  2. Pull timing: Truce fine sandy loam overlies deeper clay in mapped areas, so we have pipe ready and pull it soon after the final ream to reduce the chance of grip.
  3. Pressure control: Heavy clay is mapped across 51 percent of Bridgeport at about 40 inches, so we watch fluid returns and keep pressure down near pavement to avoid lifting it.
  4. Utility checks: Along Cates Street, we expose marked utilities by hydrovac before drilling near them, then use a walkover locator to track depth and pitch.
Vermeer D24x40 S3 Navigator and water truck at the entry of a 385 foot sandstone rock bore above the wetland in Guthrie, Oklahoma
Our Vermeer D24x40 and water truck at the entry of a 385 foot sandstone rock bore in Guthrie, Oklahoma.

What might a Bridgeport bore cross near Union Pacific track?

Bridgeport bore routes may need to pass beneath US 380, Texas State Highway 114, FM 1658, Loop 373, FM 920, Texas State Highway 101 or FM 2123, all listed inside city limits. US 380 has 9.2 mapped roadway miles in town and Texas State Highway 114 has 8.7, so a route in either corridor needs right of way planning. For street work, 10th Street, Pioneer and Cates Street are the longest named public roads, with 1.8, 1.77 and 1.7 miles mapped in the city. Boring can keep their pavement uncut.

CrossingTypeMapped extentWho has a say
US 380US highway9.2 roadway miles insideState highway office
Texas State Highway 114State highway8.7 roadway miles insideState highway office
FM 1658State highway1.8 roadway miles insideState highway office
Loop 373State highway1.6 roadway miles insideState highway office
FM 920State highway0.8 roadway miles insideState highway office
Texas State Highway 101State highway0.5 roadway miles insideState highway office
FM 2123State highway0.1 roadway miles insideState highway office
Union PacificRailroad5.57 track miles insideThe railroad
West Fork Trinity RiverStream2.29 channel miles insideChecked for Corps of Engineers jurisdiction
Dry CreekStream1.15 channel miles insideChecked for Corps of Engineers jurisdiction
Turkey CreekStream0.5 channel miles insideChecked for Corps of Engineers jurisdiction
Ramsey CreekStream0.04 channel miles insideChecked for Corps of Engineers jurisdiction
Village CreekStream0.02 channel miles insideChecked for Corps of Engineers jurisdiction
North Fork Rush CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 5.57 track miles in Bridgeport, and 8 street and rail crossings are mapped in the city. A route near the tracks needs the railroad’s crossing agreement. The West Fork Trinity River runs 2.29 channel miles in town, with Dry Creek at 1.15 miles and Turkey Creek at 0.5 miles; 9 street crossings of named streams are mapped. Lake Bridgeport is 3.4 miles west of town, so water crossings need to be considered in route planning.

Who signs off on a Bridgeport bore near US 380?

Bridgeport is incorporated, so streets such as Pioneer belong to the city, while work in the US 380 right of way goes through TxDOT. The line owner, not the driller, files the utility application in RULIS; we prepare the bore plan and profile, and the TxDOT Fort Worth District reviews it. Under an existing highway, the line goes in by boring or tunneling, with casing and a bore extending beneath all travel lanes on rural highways. Crossing cover depends on the line: electric and communication need 60 inches, water 60 inches, and pressurized sewer 60 inches. A Union Pacific crossing needs the railroad’s agreement, and the West Fork Trinity River is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns lines in Bridgeport and Wise County?

The City of Bridgeport owns the public water system, which uses surface water and reports 2,442 service connections serving 6,083 people. Bridgeport owns its municipal electric system, which we account for when planning underground work in the city. Across Wise County, EIA records list Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric Cooperative among utilities reporting service. We confirm the line owner for the specific route before planning an electric conduit bore near Cates Street.

Line ownerWhat it isSourceSize
City of BridgeportPublic water systemSurface water2,442 connections, 6,083 people served
City of Bridgeport municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration2,318 customers reported
Oncor Electric Delivery Company, Cooke County Electric Cooperative Association, Denton County Electric Cooperative, Tri-County Electric Cooperative and Wise Electric CooperativeElectric utilities reporting service in Wise CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Bridgeport’s median housing year at 1976: 17 percent of homes were built before 1960, 56 percent from 1960 to 1999, and 27 percent in 2000 or later. A replacement bore near Pioneer may meet older services as well as newer lines. Before drilling near a marked utility, we use hydrovac potholing to expose it; paint shows its position, not its depth.

Large HDPE conduit reels staged on a Rotate A Reel trailer for a fiber and utility installation in Oklahoma
HDPE conduit reels on a reel trailer for a fiber and utility installation in Oklahoma.

How far is Bridgeport from Azle and our Yukon office?

Bridgeport is in Wise County, at an elevation of 770 feet, and covers 7.86 square miles. We use ZIP code 76426 as a location reference for underground work serving Bridgeport. Lake Bridgeport is 3.4 miles west, Chico is 6.1 miles north, Runaway Bay is 6.4 miles west, Paradise is 6.4 miles southeast, and Decatur, the county seat, is 10.8 miles east. Azle, the nearest larger city listed, is 25.6 miles southeast. The Yukon yard is 199 road miles away, about a 4.0 hour drive, which matters when planning equipment mobilization for a Bridgeport route.

Places near Bridgeport

What kinds of bores come up near Pioneer in Bridgeport?

  • Highway crossing: A bore beneath US 380 can carry a water or communication line while leaving the highway pavement uncut.
  • Water service: A connection to the City of Bridgeport water system may follow a local street such as Cates Street, with the route checked for existing utilities.
  • Fiber route: Fiber conduit along 10th Street can pass beneath pavement rather than requiring an open cut across the roadway.
  • Creek crossing: A route beneath the West Fork Trinity River needs channel depth planning and a check for Corps jurisdiction during planning.
  • Rail crossing: A utility route beneath Union Pacific track needs an agreement from the railroad that owns the line.
  • Airport service: A line near Bridgeport Municipal Airport can be planned as a directional bore to avoid cutting pavement along its route.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near 10th Street in Bridgeport?

For a Bridgeport quote, start with the address or map pin, such as a route near 10th Street. Tell us what will go underground, such as water service to the City of Bridgeport system, then give the pipe or conduit size and estimated footage. A sketch or plans showing nearby streets, the Union Pacific line or a creek crossing help us define the route.

We set the price from Bridgeport job details, so the underground work determines what each project requires. Ground conditions matter: Bridgeport’s mapped clay and possible bedrock can affect reaming and drilling time. Crossings also count, including a Union Pacific track route, US 380 right of way, marked utilities, pavement, or a creek. Logistics depend on pits, excavator time, sand backfill and how far the work is from the Yukon office, which is 199 road miles from Bridgeport. High profile or emergency work can also change the plan.

Questions people ask about boring in Bridgeport

Does Trinity take directional boring jobs in Bridgeport and Wise County?

Yes. Trinity takes directional boring work in Bridgeport and across Texas, with our own crews and vetted partner contractor satellite yards supporting the work. Bridgeport is in Wise County, and you deal with Trinity from the first call through the bore log, whichever crew is on site.

Who controls Cates Street in Bridgeport, and does a bore require cutting it?

Bridgeport is incorporated, so Cates Street is a city street. Directional boring can install a line beneath the pavement without cutting across it; entry and exit pits sit in the ground on either side of the route. Existing utility marks still need to be exposed before drilling nearby.

Could a replacement bore near Pioneer in Bridgeport encounter older lines?

Yes. The American Community Survey 2019 to 2023 estimates put Bridgeport’s median housing year at 1976, with 17 percent of homes built before 1960. A replacement route near Pioneer may meet older buried services, so marked utilities are pothole exposed before the drill approaches.

Can groundwater or flooding affect bore pits near the West Fork Trinity River in Bridgeport?

It can. The USDA soil survey maps a seasonal water table within 60 inches across 12 percent of Bridgeport and flood prone soils across 7 percent. Near the West Fork Trinity River, we plan pit placement and bore depth around water and the channel, and check Corps jurisdiction during planning.

Does Truce soil in Bridgeport pose a corrosion concern for steel pipe?

The USDA soil survey maps high steel corrosion risk across 63 percent of Bridgeport, so the line owner should consider casing and tracer wire materials. Truce is the leading mapped soil series at 26 percent. HDPE can be used where suitable; the line owner selects any coating for steel.

What ground does a bore pass through in Bridgeport’s Truce soil areas?

The USDA soil survey maps Truce across 26 percent of Bridgeport, with fine sandy loam common at the surface. At about 40 inches, clay is mapped across 40 percent and sandy clay loam across 28 percent. That sticky deeper material can grip the reamer, so fluid control and staged reaming matter.

Does Trinity cover Lake Bridgeport and rural sites outside Bridgeport city limits?

Yes. Trinity takes work around Bridgeport, including Lake Bridgeport, which is 3.4 miles west, and rural sites beyond the city limits. The route, line owner and access determine the work plan; a map pin helps us assess a site outside town.

How much notice does Texas811 need for a Bridgeport bore along 10th Street?

Before excavation for a bore along 10th Street, the party arranging the work calls Texas811 and describes the route. Texas law requires notice at least 48 hours before work, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the notice, submit a new request; refresh worn or moved marks through Texas811 before work continues.

What affects the cost of directional boring near US 380 in Bridgeport?

The job scope determines the price, including length, pipe or conduit size, ground, exposed utilities, pavement, pits and equipment time. Near US 380, highway crossing requirements can affect the plan; Bridgeport’s clay and possible bedrock affect drilling, and the Yukon office is 199 road miles away. Creek crossings and urgent scheduling can also change the work involved.

Where the Bridgeport facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Bridgeport

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Bridgeport, Texas

Type the address of your job in Bridgeport. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Bridgeport

Same county: Briar · Pecan Acres · Boyd · Rhome · New Fairview · Aurora · Alvord · Newark. All counties: Texas county list.