Cisco Texas Directional Boring: Chaney Loamy Sand, Interstate 20 and Union Pacific
Quick Answer: At about 40 inches, the USDA soil survey maps sandy clay across 50 percent of Cisco and bedrock within 60 inches across 84 percent. We take directional boring, also called horizontal directional drilling (HDD), work beneath Interstate 20 in Cisco, Texas. The route is 264 road miles from our Yukon, Oklahoma main office, and Union Pacific track is another local crossing to plan around. Chaney soil covers 49 percent of the mapped area; clay can grip the pipe, so we manage fluid and ream in stages.
Cisco bores at a glance
- Incorporated city in Eastland County, Texas. Population 4,029 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 264 miles, about 5.7 hours of driving.
- Ground: Chaney soil is mapped on 49 percent of the area, with sandy clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 84 percent of the area.
- Highways inside the boundary: Interstate 20, US 183, Texas State Highway 6, FM 2807 and FM 2945. State permit office: TxDOT Brownwood District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Named streams inside the boundary: North Fork Leon River.
- Public water: City of Cisco, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring under Interstate 20 in Cisco?
We take directional boring work in Cisco, an incorporated city in Eastland County with a Census Bureau Vintage 2024 estimate of 4,029 people. Along US 183 or 16th Street, we can bore for water, sewer, gas, electric conduit or fiber. The line type and route determine the bore plan, especially where the path meets a street or existing utility.
Our main office is in Yukon, Oklahoma, and Cisco work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, with directional boring work dating to 1982. The 3/4 inch service line to 48 inch casing range includes options for a long crossing beneath Interstate 20.

What does the soil survey show for Chaney soil in Cisco?
The USDA soil survey maps Chaney soil across 49 percent of Cisco, including Chaney loamy sand on 44 percent of the mapped area. That surface texture can cut readily but may cave behind the drill, so staged reaming and a supporting fluid matter. At about 40 inches, the mapped texture is sandy clay across 50 percent and clay across 31 percent of the area. These are mapped soil patterns, not test borings. A route along 14th Street still needs site specific checks before drilling.
| USDA soil survey, inside the Cisco city limits | What is mapped |
|---|---|
| Soil series mapped | Chaney 49 percent, Truce 17 percent, Thurber 13 percent, Bonti 9 percent and Owens 5 percent |
| Texture at the surface | loamy sand 44 percent, fine sandy loam 19 percent and clay loam 14 percent |
| Texture about 40 inches down | sandy clay 50 percent, clay 31 percent and bedrock 13 percent |
| Engineering class about 40 inches down | lean clay (CL) 67 percent and fat clay (CH) 19 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 84 percent of the area (2 percent hard rock, 82 percent weathered rock) |
| Seasonal water table within 60 inches | 1 percent of the area |
| Flood prone soils | 1 percent of the area |
| High corrosion risk for uncoated steel | 96 percent of the area |
The survey maps bedrock within 60 inches across 84 percent of Cisco, mostly weathered bedrock at 82 percent; hard bedrock is mapped across 2 percent. Typical bedrock depth is 47 inches, so a bore may slow as it reaches rock. Seasonal water table and flood prone soils are each mapped across 1 percent. High steel corrosion risk is mapped across 96 percent, so the line owner should choose protection for steel casing or tracer wire; HDPE avoids that soil corrosion concern. The Harpersville Formation, a Paleozoic unit, includes siltstone, mudstone and limestone.
How do we bore through sandy clay in Cisco?
Cisco’s sandy clay and clay at about 40 inches can cling to a reamer or pipe. On a route near 16th Street, we match fluid and reaming stages to the ground we encounter.
- Chaney loamy sand can fall in behind the bit, so we support the hole and stage the reaming before pulling pipe on a Cisco route.
- With sandy clay and clay mapped at about 40 inches, we use fluid suited to sticky ground and keep the pull moving after the final ream.
- Weathered bedrock is mapped across 82 percent of Cisco within 60 inches; we allow for slower drilling as the bore reaches the Harpersville Formation.
- Before a bore near 16th Street, we hydrovac marked utilities and track the drill head from the surface, logging depth and pitch.

Which roads, tracks or creeks could a Cisco bore cross near 16th Street?
Interstate 20 has 8.4 mapped roadway miles inside Cisco, while US 183 has 2.3 and Texas State Highway 6 has 3.3. FM 2807, FM 2945 and FM 2943 also run within the limits. A bore in a state highway right of way needs the proper TxDOT utility permit and highway cover. The longest named streets include 16th Street at 1.91 miles, 14th Street at 1.88 miles and 8th Street at 1.63 miles. Boring can keep pavement and driveways uncut, with entry and exit pits placed off the paved route.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 8.4 roadway miles inside | State highway office |
| US 183 | US highway | 2.3 roadway miles inside | State highway office |
| Texas State Highway 6 | State highway | 3.3 roadway miles inside | State highway office |
| FM 2807 | State highway | 0.8 roadway miles inside | State highway office |
| FM 2945 | State highway | 0.4 roadway miles inside | State highway office |
| FM 2943 | State highway | 0.2 roadway miles inside | State highway office |
| Union Pacific | Railroad | 2.73 track miles inside | The railroad |
| North Fork Leon River | Stream | 1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Sandy Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
| Lake Cisco | Lake or pond | 544 acres, nearby | Checked for Corps of Engineers jurisdiction |
| Twin Lake | Lake or pond | 12 acres, inside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.73 track miles inside Cisco on the Baird Subdivision, and public records map 2 street and rail crossings. A crossing needs an agreement with Union Pacific before the route is set. The North Fork Leon River runs for 1.0 channel mile in the city, and 9 street crossings of named streams are mapped. Twin Lake is inside the limits; Lake Cisco is just outside. A creek or lake route calls for checking whether Corps of Engineers review applies.
Who approves a Cisco bore in Eastland County?
Cisco is incorporated, so its city streets belong to the city; do not treat a street bore on 8th Street like a state highway filing. For Interstate 20, US 183, Texas State Highway 6 or a farm to market road, the utility owner applies for the TxDOT utility permit through RULIS. TxDOT’s Brownwood District reviews the filing, and we provide the bore plan and profile under the utility owner’s permit. At a highway crossing, cover is at least 60 inches for electric, communication and water lines, and pressurized sewer also needs 60 inches. Union Pacific sets crossing terms for its track, while a North Fork Leon River crossing is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground near the City of Cisco water system?
The City of Cisco public water system uses surface water and reports 2,769 service connections serving 4,076 people. A water service bore near 10th Street needs its route checked against existing mains. Electric service is reported in Eastland County by AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Comanche County Electric Cooperative Association, Taylor Electric Cooperative and United Electric Cooperative Service. Before an electric conduit route is set, we identify the line owner and hydrovac pothole marked utilities on the path.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Cisco | Public water system | Surface water | 2,769 connections, 4,076 people served |
| AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power, Comanche County Electric Cooperative Association, Taylor Electric Cooperative and United Electric Cooperative Service | Electric utilities reporting service in Eastland County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Cisco’s median housing year at 1954; 63 percent of units were built before 1960 and 9 percent in 2000 or later. That age range can mean a replacement route needs to pass existing lines as well as make room for a new service. Near 14th Street, we hydrovac pothole marked utilities before drilling close to them because surface paint shows position, not depth.

Where is Cisco in relation to Abilene and our Yukon office?
Cisco is in Eastland County, at an elevation of 1,640 feet, and covers 5.37 square miles. Its ZIP code is 76437. Eastland, the county seat, is 9.6 miles east; Carbon is 12.2 miles southeast, Putnam 12.5 miles west, Moran 15.4 miles northwest and Ranger 18.7 miles east. Abilene is 44.3 miles west. For a Cisco project, our Yukon, Oklahoma main office is 264 road miles away, a drive of 5.7 hours, so that distance is part of planning the crew mobilization.
Places near Cisco
- Directional boring in Eastland: 9.6 miles east
- Directional boring in Carbon: 12.2 miles southeast
- Directional boring in Putnam: 12.5 miles west
- Directional boring in Moran: 15.4 miles northwest
- Directional boring in Ranger: 18.7 miles east
- Directional boring in Abilene: 44.3 miles west
Which jobs call for a bore near 14th Street in Cisco?
- Highway crossing: A bore beneath Interstate 20 keeps the paved route intact while the utility owner obtains the TxDOT right of way permit.
- Water service: A new or replacement line near the City of Cisco system can be routed under a street rather than through its pavement.
- Fiber conduit: A route along 14th Street can use a bore to cross pavement without an open cut through the street.
- Rail crossing: A route under the Union Pacific Baird Subdivision needs an agreement with the railroad before casing and depth are set.
- Creek crossing: A bore near the North Fork Leon River can pass below the channel, with jurisdiction checked during planning.
- Electric conduit: Near 10th Street, we identify the electric line owner and expose marked utilities before the drill reaches them.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Cisco bore near 10th Street?
For a route near 10th Street, send the address or map pin, what goes in the ground, pipe or conduit size and footage; a sketch or plans help. The route matters because Cisco has city streets, Interstate 20 and Union Pacific track to account for, and each can change access or the bore layout.
In Cisco, the ground is the first price factor: Chaney loamy sand overlies mapped sandy clay and bedrock, affecting reaming and drilling time. Next are length and pipe or conduit size, then utilities to expose and crossings such as Interstate 20 or Union Pacific track. Pavement, creek or drainage crossings, pits, excavator time and sand backfill also affect the scope. Mobilization from Yukon matters at 264 road miles, while emergency or high profile work can add planning needs.
Questions people ask about boring in Cisco
Does Trinity take directional boring jobs in Cisco and Eastland County, and how are crews assigned?
Yes. We take work in Cisco and Eastland County, with our own crews and satellite yards operated by partner drilling contractors we have vetted. You work with Trinity through the job, from the first call to the bore log. The route, such as a crossing near Interstate 20, helps determine how the work is staffed.
Who controls Cisco streets like 8th Street, and does a bore require cutting pavement?
Cisco is incorporated, so its city streets, including 8th Street, belong to the city. Directional boring can place a line beneath the pavement with pits on either side rather than an open cut through the street. The route still needs to account for marked utilities and the line being installed.
What do Cisco’s older homes near 14th Street mean for replacement bores?
The American Community Survey 2019 to 2023 five year estimates put the median housing year at 1954, with 63 percent of units built before 1960. A replacement bore near 14th Street may need to pass older buried lines. We expose marked utilities along the planned path before the drill gets close.
Does Chaney soil in Cisco create a corrosion concern for steel pipe?
The USDA soil survey maps high steel corrosion risk across 96 percent of Cisco, including areas with Chaney soil. The line owner chooses any coating needed for steel casing or tracer wire. HDPE does not share that soil corrosion concern, but the suitable pipe material depends on the line and project requirements.
What ground does a bore pass through in Cisco’s Chaney soil?
Chaney is mapped across 49 percent of Cisco, with Chaney loamy sand mapped across 44 percent. At about 40 inches, the USDA soil survey maps sandy clay across 50 percent of the area and clay across 31 percent. Sandy ground can cave behind the bit, while clay can cling to the reamer and pipe.
Is rock mapped within five feet of the surface in Cisco?
Yes. Bedrock is mapped within 60 inches across 84 percent of Cisco, with weathered bedrock across 82 percent and hard bedrock across 2 percent. Typical mapped depth is 47 inches. That can slow a bore as it reaches rock; the Harpersville Formation is mapped as a Paleozoic unit with siltstone, mudstone and limestone.
How much notice does Texas811 need for a bore along 16th Street in Cisco?
For a bore along 16th Street, the Texas811 locate request must be made at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the start slips more than 14 days past the original notice, make a new request. Worn or moved marks must be refreshed through Texas811 before work continues.
How far is Cisco from Trinity’s Yukon office, and does Abilene help with mobilization?
Cisco is 264 road miles and a 5.7 hour drive from our Yukon, Oklahoma main office. Abilene is 44.3 miles west of Cisco, but the job’s mobilization is planned around the actual route and work scope. We use our own crews and vetted partner contractor satellite yards for Cisco work.
What affects the cost of directional boring in Cisco under Interstate 20?
The scope sets the price. Chaney loamy sand, sandy clay and mapped bedrock affect drilling and reaming; length and pipe size also matter. For an Interstate 20 crossing, the highway route, utilities to expose, pavement, pits and access can change the work. Union Pacific or creek crossings, mobilization from Yukon, and emergency or high profile work can add planning or equipment needs.
Where the Cisco facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Cisco
- U.S. Census Bureau, TIGER/Line 2024: Cisco boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Cisco
- U.S. Census Bureau, American Community Survey 2019 to 2023: Cisco housing units and year built
- Macrostrat geologic map compilation: map units under Cisco
- U.S. EPA Safe Drinking Water Information System: public water systems serving Cisco
- U.S. Department of Transportation, North American Rail Network: track owners in Eastland County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Eastland County
- U.S. Geological Survey, Elevation Point Query Service: Cisco elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Cisco
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Cisco
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Cisco, Texas
Type the address of your job in Cisco. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Cisco
Same county: Gorman · Rising Star. All counties: Texas county list.
