Putnam Texas Directional Boring: Throck Soil, Interstate 20 And Union Pacific
Quick Answer: EPA drinking water records do not match a provider to a Putnam address, while AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative report service in Callahan County; verify line owners before boring. For Interstate 20 crossings, Trinity does directional boring, also called horizontal directional drilling (HDD), in Putnam, Texas. Putnam is 277 road miles from our Yukon, Oklahoma main office, with Travis Street among routes to assess. Throck soils and clay at depth can grip tooling and pipe, so staged reaming and fluid control matter.
Putnam bores at a glance
- Incorporated city in Callahan County, Texas. Population 77 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 277 miles, about 5.9 hours of driving.
- Ground: Throck soil is mapped on 33 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 79 percent of the area.
- Highways inside the boundary: Interstate 20 and FM 880. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: Union Pacific, with 2 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Lovelady Creek in Putnam?
EPA records do not identify the water provider for a Putnam address, and AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative report service in Callahan County; verify the actual line owners before laying out a bore. The Census Bureau Vintage 2024 estimate puts Putnam at 77 people. We can install water, sewer, gas, electric conduit or fiber along a proposed Travis Street route, subject to locating existing lines.
Our main office is in Yukon, Oklahoma, and Putnam work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. The family started in 1965 and has focused on directional boring since 1982; our work ranges from 3/4 inch service lines to 48 inch casing and from 10 feet to 5,000 feet, useful scope range when planning around Interstate 20 or the Union Pacific track.

What does the soil survey show about Throck soil in Putnam?
The USDA soil survey names Throck as the leading soil series at 33%, with Owens at 27% and Callahan at 12%. Its mapped surface includes stony clay loam across 36% and stony clay across 27%; about 40 inches down, clay covers 80% of the mapped area and silty clay 12%. CH covers 47% and CL 45% at that depth. That clay rich profile can hold an open hole but stick to the reamer and grip pipe, so the bore plan needs controlled fluid and staged reaming. These are mapped patterns, not site tests.
| USDA soil survey, inside the Putnam city limits | What is mapped |
|---|---|
| Soil series mapped | Throck 33 percent, Owens 27 percent, Callahan 12 percent, Nukrum 11 percent and Leeray 9 percent |
| Texture at the surface | stony clay loam 36 percent, stony clay 27 percent and clay 20 percent |
| Texture about 40 inches down | clay 80 percent, silty clay 12 percent and bedrock 8 percent |
| Engineering class about 40 inches down | fat clay (CH) 47 percent and lean clay (CL) 45 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 79 percent of the area (8 percent hard rock, 72 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 99 percent of the area |
USDA mapping places bedrock within 60 inches across 79% of Putnam; weathered bedrock is mapped across 72%, while hard bedrock is mapped across 8%. A typical mapped depth is 25 inches, so crews should expect possible slower drilling and a shift at soil to rock contacts. The geology map names the Santa Anna Branch shale of Cisuralian age, with shale, mudstone and sandstone. Seasonal water table and flood prone soils are not mapped. High steel corrosion risk covers 99%, making uncoated casing and tracer wire a line owner discussion; HDPE avoids that soil corrosion concern.
What does it take to bore Putnam clay without losing control?
On Putnam’s clay mapped at about 40 inches, we keep fluid from overworking the hole and get the pipe ready before the final ream. A Travis Street route still starts with utility locates.
- Throck and Owens mapped soils can be sticky; we use a thinner fluid mix with polymer so clay does not build up on the reamer.
- With CH and CL soils mapped near 40 inches, we ream in stages and plan to pull the pipe the same day the hole is opened.
- Before a bore near Travis Street, we hydrovac expose each marked line because surface paint does not show its depth.
- On a route toward Interstate 20, we track the drill head from the surface and log depth and pitch as the bore advances.

What does a bore have to cross near Travis Street in Putnam?
Interstate 20 has 2.0 mapped roadway miles inside Putnam, and FM 880 adds 1.3 miles; both are state routes where a crossing or right of way run can bring TxDOT into the plan. Travis Street is the longest named street at 0.92 miles, followed by Front Street at 0.86 and Ash Street at 0.69. Putnam’s public streets belong to the incorporated town, and directional boring can leave the pavement uncut while pits stay off the travel surface.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 2 roadway miles inside | State highway office |
| FM 880 | State highway | 1.3 roadway miles inside | State highway office |
| Union Pacific | Railroad | 1 track miles inside | The railroad |
| Lovelady Creek | Stream nearby | 0.5 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 1.0 track mile inside Putnam on the Union Pacific Baird Subdivision, and the map shows 2 street and rail crossings. A bore beneath that track needs the railroad’s crossing agreement, which sets casing, depth and flagging. No named stream runs inside town limits; Lovelady Creek is 0.5 miles outside them, and no mapped street crossing of a named stream lies inside Putnam. The map includes 0.15 miles of unnamed drainage in town, so a route should account for drainage even without a named creek crossing. No lake or pond is mapped within one mile.
Do I need a permit to bore under Interstate 20 in Putnam?
For a bore within Interstate 20 or FM 880 right of way, the utility owner applies for the TxDOT utility permit through RULIS, and the TxDOT Abilene District reviews it; we prepare the bore plan and profile for that filing. TxDOT cover rules set minimum depths by line type, and a highway crossing is bored or tunneled, with casing and an extension beneath all rural travel lanes. Putnam’s streets such as Travis Street belong to the incorporated town. A Union Pacific crossing needs its railroad agreement, while a Lovelady Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the lines already in the ground in Callahan County near Putnam?
EPA drinking water records do not tie a named public water system to Putnam, so the provider for the specific address must be confirmed with the town, Callahan County or the local water district before a bore is planned. For electric conduit near Travis Street, AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative are the utilities reporting service in Callahan County; the actual line owner and conduit specifications need confirmation before drilling.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative | Electric utilities reporting service in Callahan County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Putnam’s median housing year at 1958; 53% of units predate 1960, while 9% were built in 2000 or later. Along Houston Street, that mix can mean a proposed connection is either replacement work near older service or a new service, not something to assume from age alone. We hydrovac each marked utility on a bore path before drilling near it, since paint does not show depth.

How far is Putnam from Moran and Trinity’s Yukon office?
Putnam is in Callahan County at elevation 1,602 feet and covers 1.01 square miles, with ZIP code 76469. Baird, the county seat, is 11.8 miles west; Moran is 12.3 miles north, Cisco is 12.5 miles east, Cross Plains is 16.9 miles south, and Clyde is 18.2 miles west. Breckenridge, the nearest larger city, is 31.4 miles northeast. From our Yukon, Oklahoma main office, the road trip is 277 miles and 5.9 hours, a distance that affects mobilization for a Putnam bore.
Places near Putnam
- Directional boring in Baird: 11.8 miles west
- Directional boring in Moran: 12.3 miles north
- Directional boring in Cisco: 12.5 miles east
- Directional boring in Cross Plains: 16.9 miles south
- Directional boring in Clyde: 18.2 miles west
- Directional boring in Breckenridge: 31.4 miles northeast
What would we bore near Front Street in Putnam?
- Interstate crossing: A proposed conduit beneath Interstate 20 needs a route and profile suited to TxDOT right of way, cover and pavement rules.
- FM 880 crossing: A water or fiber line crossing FM 880 is planned as a bored route, with the utility owner handling the TxDOT permit filing.
- Street service: A service along Travis Street can use pits outside the pavement and hydrovac checks where marked lines meet the planned path.
- Rail crossing: A proposed line beneath the Union Pacific Baird Subdivision requires the railroad’s agreement on casing, depth and flagging.
- Drainage crossing: Near Lovelady Creek, a route needs channel review and a check for U.S. Army Corps of Engineers jurisdiction.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a bore near Houston Street in Putnam?
For a Putnam quote, send the street address or map pin, what will go underground, the pipe or conduit size, and the footage; a sketch or plans showing a Travis Street, Interstate 20 or Union Pacific route help us see crossings and access before we set the drilling scope.
We set the price from the planned scope: Throck clay and possible shallow bedrock affect tooling and reaming; each utility exposed and crossed changes the work; Interstate 20 pavement or Union Pacific track adds crossing requirements. Pit size, excavator time and sand backfill also count, as can concrete and drainage work near Lovelady Creek. Putnam is 277 road miles from Yukon, so mobilization is part of the logistics. Emergency or high profile work can require added planning.
Questions people ask about boring in Putnam
Does Trinity Boring Solutions take directional boring work in Putnam and Callahan County?
Yes. Trinity takes work in Putnam and staffs it with our own crews or partner contractor satellite yards we have vetted; you coordinate with Trinity from first call through bore log. Since EPA records do not match a named water provider to an address and electric service is reported by three utilities in Callahan County, locating the actual lines is part of planning.
Is there rock beneath Putnam, and how much bedrock is mapped within five feet?
The USDA soil survey maps bedrock within 60 inches across 79% of Putnam, including weathered bedrock across 72% and hard bedrock across 8%. The typical mapped depth is 25 inches. The Santa Anna Branch shale map unit adds shale and sandstone context, so expect variable progress rather than assuming a clean clay bore.
Who approves a bore under Interstate 20 in Putnam, and which state office reviews it?
TxDOT handles the state right of way approval for Interstate 20 through its Abilene District. The utility that owns the line submits the permit application in RULIS; Trinity develops the bore plan and profile. For Putnam work, permitted depth and highway crossing details depend on line type and the district’s permit, so identify the owner and crossing limits first.
What does a Putnam bore under Union Pacific track require?
Union Pacific owns the 1.0 track mile mapped in Putnam. A proposed bore beneath its Union Pacific Baird Subdivision needs a crossing agreement from the railroad, which sets casing, depth and flagging. If the same line also occupies Interstate 20 right of way, TxDOT asks for a copy of that agreement.
Can a line be bored under Lovelady Creek near Putnam?
A bore beneath Lovelady Creek may be planned, but the mapped creek is 0.5 miles outside Putnam’s limits, not inside town. The creek crossing should be checked for U.S. Army Corps of Engineers jurisdiction during planning. The town map also shows unnamed drainage, so the actual alignment and channel conditions need review before selecting the bore path.
Which electric company owns a line in Putnam, Callahan County, and who confirms conduit specs?
AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative report service in Callahan County; that does not identify which one owns a particular Putnam line. Confirm the line owner and conduit specifications before a conduit bore along Travis Street or another route. Hydrovac potholes expose marked lines because surface marks show location, not depth.
How far is Putnam from Breckenridge and the Yukon main office, and does distance affect the job?
Putnam is 277 road miles and 5.9 drive hours from Trinity’s Yukon, Oklahoma main office; Breckenridge is 31.4 miles northeast of town. That distance can affect mobilization and job logistics, especially for a route involving Interstate 20 or the Union Pacific track. It does not change the bore design facts, such as Throck clay or the actual crossings.
How much notice does Texas811 need for a Putnam bore near Travis Street, and what happens to the marks?
Texas811 needs a notice at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. For a planned Travis Street bore, a delay more than 14 days past the original notice requires a new request. If marks wear off or move, have them refreshed through Texas811 before continuing.
What affects the cost of a Putnam directional bore beneath Interstate 20?
No single price applies to a Putnam bore beneath Interstate 20. The scope depends on length and pipe size, Throck clay or bedrock, utility exposures and crossings, pavement, pits, excavator time, backfill and any drainage work. Union Pacific crossings and the 277 road miles from Yukon can also affect requirements and mobilization. Plans or a site pin help us define those conditions.
Where the Putnam facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Putnam
- U.S. Census Bureau, TIGER/Line 2024: Putnam boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Putnam
- U.S. Census Bureau, American Community Survey 2019 to 2023: Putnam housing units and year built
- Macrostrat geologic map compilation: map units under Putnam
- U.S. Department of Transportation, North American Rail Network: track owners in Callahan County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Callahan County
- U.S. Geological Survey, Elevation Point Query Service: Putnam elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Putnam
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Putnam
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Putnam, Texas
Type the address of your job in Putnam. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.