Clint Texas Directional Boring: Harkey Soil, Clint Lateral and Union Pacific
Quick Answer: Union Pacific track and Clint Lateral are among the crossings to plan around when Trinity Boring Solutions runs directional boring, also called horizontal directional drilling (HDD), in Clint, Texas. Alameda Avenue and the local drainage channels shape where a bore can enter and exit. Clint is 713 road miles from our Yukon, Oklahoma main office, and the Union Pacific Valentine Subdivision runs through town. Harkey silty clay loam is common here, so sticky soil can build on a reamer and grip pipe.
Clint bores at a glance
- Incorporated city in El Paso County, Texas. Population 1,069 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 713 miles, about 13.3 hours of driving.
- Ground: Harkey soil is mapped on 49 percent of the area, with silt loam about 40 inches down.
- Rock: no bedrock is mapped in the top 60 inches.
- Highways inside the boundary: Texas State Highway 20, FM 76 and FM 1110. State permit office: TxDOT El Paso District.
- Railroad track inside the boundary: Union Pacific, with 1 mapped street and rail crossings.
- Named streams inside the boundary: Clint Lateral, Salatral Lateral, Mesa Drain and Green Lateral.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near Alameda Avenue in Clint?
Alameda Avenue is one route where a buried line may need to pass beneath pavement instead of cutting across it. We take directional boring work in Clint, in El Paso County. The Census Bureau Vintage 2024 estimate puts the town population at 1,069. Along streets such as Alameda Avenue, we install water, sewer, gas, electric conduit and fiber lines by boring beneath the surface.
Our main office is in Yukon, Oklahoma, and Clint work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We handle jobs from 3/4 inch service lines to 48 inch casing, including small service bores and large crossings near Clint Lateral. Our family business began in 1965, and we have provided directional boring since 1982 for underground work in Clint.

What is Harkey soil like to bore in Clint?
The USDA soil survey maps Harkey across 49% of Clint, with Harkey silty clay loam covering 38% of the mapped area. Glendale soils cover 30%, and Glendale silty clay loam accounts for 17%. At about 40 inches below the surface, silt loam is mapped under 43% of the area; stratified fine sand to silty clay loam is mapped under 29%. Sandy ground accounts for 12% at that depth. These are mapped patterns, not test borings, so the actual route still needs field review.
| USDA soil survey, inside the Clint city limits | What is mapped |
|---|---|
| Soil series mapped | Harkey 49 percent, Glendale 30 percent, Saneli 5 percent, Gila 5 percent and Tigua 4 percent |
| Texture at the surface | silty clay loam 63 percent, silty clay 18 percent and loam 16 percent |
| Texture about 40 inches down | silt loam 43 percent, stratified fine sand to silty clay loam 29 percent and loam 11 percent |
| Engineering class about 40 inches down | silt (ML) 54 percent, silty sand (SM) 35 percent and sand with silt (SP SM) 5 percent |
| Average clay content about 40 inches down | 18 percent |
| Bedrock mapped within 60 inches | None mapped |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 43 percent of the area |
Across the Harkey and Glendale map units, bedrock is not mapped in the top five feet, but that does not rule out deeper rock. Seasonal water table and flood prone ground are not mapped in the survey. High steel corrosion risk is mapped under 43% of Clint, so the line owner should address coating needs for steel casing or tracer wire; HDPE avoids that soil corrosion concern. The geologic map identifies Holocene alluvium along streams, with sand, silt, clay and gravel that can vary along a route.
How is a bore run through Clint silt loam?
Clint has silt loam mapped at about 40 inches, alongside Harkey silty clay loam and sandy layers. We adjust fluid and reaming to the ground we meet along the route.
- At a Harkey silty clay loam location, we manage sticky cuttings with a thinner drilling fluid and staged reaming, then pull the pipe while the hole is open.
- Where silt loam is mapped around 40 inches deep, we keep fluid pressure controlled near Alameda Avenue pavement so soft ground is not washed out.
- If the bore reaches sandy layers mapped beneath Clint, we use drilling fluid to support the hole and have the pipe ready before the final ream.
- Before approaching utilities along Celum Road, we hydrovac pothole each marked line, then track the drill head from the surface and log depth and pitch.

What does a bore have to cross in Clint near Clint Lateral?
Texas State Highway 20, FM 76 and FM 1110 run through Clint, with Interstate 10 just outside town, 1.1 miles from the limits. A line crossing a state or farm to market highway needs a bore plan that fits the right of way and the required cover. Alameda Avenue is the longest named street in town at 1.78 miles. Loop Drive runs 1.38 miles, and Celum Road runs 0.95 miles. These roads give practical routes to assess for service lines and utility extensions.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 20 | State highway | 1.8 roadway miles inside | State highway office |
| FM 76 | State highway | 1.4 roadway miles inside | State highway office |
| FM 1110 | State highway | 1.3 roadway miles inside | State highway office |
| Interstate 10 | Highway nearby | 1.1 miles outside | State highway office |
| Union Pacific | Railroad | 0.79 track miles inside | The railroad |
| Clint Lateral | Stream | 1.76 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Salatral Lateral | Stream | 1.41 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Mesa Drain | Stream | 1.38 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Green Lateral | Stream | 1.03 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Middle Drain | Stream | 0.87 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Rodriquena Lateral | Stream | 0.77 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Clint Spur Drain | Stream | 0.1 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Franklin Canal | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Franklin Drain | Stream nearby | 0.3 miles outside | Checked for Corps of Engineers jurisdiction |
Union Pacific owns 0.79 track miles in Clint on the Valentine Subdivision, and one street and rail crossing is mapped inside town. A route near the track needs coordination with the railroad. Clint Lateral runs 1.76 channel miles, while Salatral Lateral runs 1.41 and Mesa Drain runs 1.38. Public records map 24 street crossings of named streams in town, so drainage crossings need a site specific path and access plan.
Who approves a Clint bore near Union Pacific track?
Because Clint is incorporated, we coordinate city street work with the city before planning a boring route. For work in the right of way of Texas State Highway 20, FM 76, FM 1110 or nearby Interstate 10, the utility owner files the utility permit through TxDOT’s RULIS system. TxDOT’s El Paso District reviews it, and we give the owner a bore plan and profile to support the filing. Electric and communication lines crossing a highway need 60 inches of cover below the lowest point of the crossed grade; water lines need 60 inches, and pressurized sewer lines need 60 inches. A Union Pacific track crossing needs an agreement from the railroad. Clint Lateral and other water crossings are checked for federal jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in El Paso County near Clint?
For a Clint address, confirm the water provider with the city, El Paso County or the local water district before planning a bore. EPA drinking water records do not tie a provider to this town, so the address needs to be checked directly. El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County; the owner of the line at the bore location needs confirmation before conduit specifications are set. Hydrovac potholing helps expose marked lines before a drill approaches Alameda Avenue or a mapped lateral.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| El Paso Electric and Rio Grande Electric Cooperative | Electric utilities reporting service in El Paso County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates place Clint’s median housing year at 1979, a consideration when planning underground work. The same survey estimates that 30% of homes were built before 1960, 45% from 1960 to 1999 and 25% in 2000 or later. That mix can mean a bore serves either a replacement line or a newer connection near Loop Drive. We pothole marked utilities on the planned path before drilling near them because surface marks do not show line depth.

Do you cover Clint and nearby San Elizario?
Clint is an incorporated town in El Paso County, Texas, with an area of 1.96 square miles and an elevation of 3,637 feet. Its ZIP code is 79836. San Elizario is 2.1 miles west, and Morning Glory is 2.1 miles southeast. Socorro is 3.7 miles northwest, while El Paso, the county seat, is 21.4 miles northwest. We serve work in Clint and across Texas from our Yukon, Oklahoma main office, 713 road miles away, a drive of 13.3 hours.
Places near Clint
- Directional boring in Morning Glory: 2.1 miles southeast
- Directional boring in San Elizario: 2.1 miles west
- Directional boring in Socorro: 3.7 miles northwest
- Directional boring in Sparks: 5.7 miles north
- Directional boring in Horizon City: 6.6 miles north
What boring work comes up near Celum Road in Clint?
- Highway crossing: A bore beneath Texas State Highway 20 keeps the line below the roadway, with the utility owner arranging the TxDOT permit.
- Water service: A service line near Celum Road needs its provider and route confirmed before the bore is planned.
- Fiber route: A fiber bore along Alameda Avenue can pass beneath pavement rather than opening a trench across the street.
- Drain crossing: A bore near Clint Lateral needs a route planned around the channel and access for pits on both sides.
- Rail crossing: A line under Union Pacific track needs railroad coordination for the crossing plan, casing and depth.
- Utility conduit: Before a conduit bore near Loop Drive, we expose marked lines so their actual depth is known.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Clint bore near Texas State Highway 20?
Start with a map pin or address. The exact spot matters near Texas State Highway 20, where a route may enter a highway right of way, or near Clint Lateral, where drainage affects the path. For a Clint boring request, we need the material going underground, the pipe or conduit size, and the footage to define the work. A sketch or plans help us lay out the route.
A clear route along Celum Road with no track or drainage crossing is simpler to plan than a bore under Texas State Highway 20 or Clint Lateral. Price depends on the bore length, pipe or conduit size, soil and rock, and the number of utilities that must be exposed. Pavement, pits, sand backfill and excavator time also affect the work. Union Pacific coordination and mobilization from Yukon matter for a job 713 road miles from our main office.
Questions people ask about boring in Clint
Does Trinity take directional boring jobs in Clint and El Paso County, and who staffs them?
Yes. We take directional boring work in Clint and El Paso County, with our crews and vetted partner drilling contractors available for jobs in the area. You work with Trinity from the first call through the bore log, including when a partner crew is on site near Alameda Avenue.
Who owns electric lines in El Paso County near Clint, and who confirms conduit specs?
El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County. Those county records do not identify the owner at every Clint address, so confirm the specific line owner before setting conduit requirements for a bore near FM 76.
Who is responsible for Clint streets like Celum Road, and does a bore cut the pavement?
Clint is incorporated, so city streets such as Celum Road belong to the city itself. Directional boring can place a line beneath pavement without opening a trench across the street. The entry and exit pits still need suitable ground access at the site.
How do older houses and buried lines near Loop Drive affect replacement bores in Clint?
Clint’s median housing year is 1979, according to the American Community Survey 2019 to 2023 five year estimates. Older homes near Loop Drive may need replacement connections, while newer properties may need new service routes. We pothole marked utilities on the bore path before drilling near them.
Does Harkey soil in Clint corrode steel, and what pipe should I use?
The USDA soil survey maps high steel corrosion risk under 43% of Clint, including areas with Harkey soil. The line owner should decide whether steel casing or tracer wire needs protection. HDPE is not affected by that soil corrosion concern, but material choice depends on the line design.
What ground does a bore pass through in Clint’s Harkey soil?
The USDA soil survey maps Harkey across 49% of Clint, with Harkey silty clay loam covering 38%. At about 40 inches, silt loam is mapped under 43% of the area and stratified fine sand to silty clay loam under 29%. Actual ground can vary along a bore route.
What bore sizes and lengths can you handle near Clint Cut-Off Road?
We handle lines from 3/4 inch service size to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. A route near Clint Cut-Off Road still needs to be checked for soil, crossings and access before we settle on equipment and a plan.
How much notice does Texas811 need for a bore near Alameda Avenue in Clint?
The person arranging work near Alameda Avenue must request locates through Texas811 at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If the Clint start date slips more than 14 days past the original notice, we submit a new request before work begins. Before continuing boring work in Clint, we have worn or moved marks refreshed through Texas811.
What affects the cost of a directional bore near Texas State Highway 20 in Clint?
For boring work in Clint, we set the price according to the job scope, including the work required underground. A bore near Texas State Highway 20 may need highway permit planning, while Harkey soil, pipe size, length, utility exposures, pavement, pits and backfill affect the work. Clint’s 713 road miles from Yukon also affect mobilization. Send the location and route details for a job specific review.
Where the Clint facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Clint
- U.S. Census Bureau, TIGER/Line 2024: Clint boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Clint
- U.S. Census Bureau, American Community Survey 2019 to 2023: Clint housing units and year built
- Macrostrat geologic map compilation: map units under Clint
- U.S. Department of Transportation, North American Rail Network: track owners in El Paso County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving El Paso County
- U.S. Geological Survey, Elevation Point Query Service: Clint elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Clint
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Clint
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Clint, Texas
Type the address of your job in Clint. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Clint
Same county: El Paso · Fort Bliss · Fabens · Homestead Meadows South · Canutillo · Homestead Meadows North · Anthony · Westway · Agua Dulce · Vinton · Tornillo · Prado Verde. All counties: Texas county list.
