trinityboringsolutions.com

Fabens Texas Directional Boring: Bluepoint Soil, Interstate 10 and Salatral Lateral

Quick Answer: From our Yukon, Oklahoma main office, Fabens is 704 road miles away, so we coordinate our own crews and vetted partner contractor yards for work near Interstate 10. Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), for crossings such as Salatral Lateral. The USDA soil survey maps Bluepoint association across 49% of the community, with sandy layers that need support as the hole is opened. That ground can cave behind the drill, so staged reaming and ready pipe help keep the bore moving.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Fabens bores at a glance

  • Unincorporated community in El Paso County, Texas. Population 7,498 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 704 miles, about 13.1 hours of driving.
  • Ground: Bluepoint soil is mapped on 49 percent of the area, with stratified sand to loamy fine sand to very fine sandy loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Interstate 10, Texas State Highway 20, FM 76, FM 793 and FM 258. State permit office: TxDOT El Paso District.
  • Railroad track inside the boundary: Union Pacific, with 5 mapped street and rail crossings.
  • Named streams inside the boundary: Salatral Lateral, San Felipe Arroyo, River Drain and I- 243 Lateral.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring near Salatral Lateral in Fabens?

From our Yukon yard, Fabens is 704 road miles away, and we staff work with our own crews or from vetted partner contractor yards. The 2020 Census counted 7,498 people in this El Paso County community. Along routes such as Fabens Road and G Avenue, we install water, sewer, gas, electric conduit and fiber lines by directional boring when the route and ground suit a bore.

Our main office is in Yukon, Oklahoma, and Fabens work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have completed bores in Texas, including a roughly 4,100 foot, 48 inch casing bore under the Arkansas River in Tulsa. A typical Fabens job, such as a service crossing near 1st Street, is much shorter and smaller.

Trinity Boring Solutions Ditch Witch JT922 HDD rig and vacuum excavation truck on a commercial bore in Oklahoma City
Our Ditch Witch JT922 drill and vacuum excavation truck on a commercial bore in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show about Bluepoint soil in Fabens?

The USDA soil survey maps Bluepoint association, rolling, across 49% of Fabens. Harkey silty clay loam accounts for 12%, and Pajarito association, level, covers 12%. At the surface, loamy fine sand is mapped across 50% and fine sandy loam across 21%. About 40 inches down, 49% is mapped as stratified sand to loamy fine sand to very fine sandy loam. The mapped area at that depth averages 11% clay, and 13% is sandy. These are mapped patterns, not test borings; a route near Salatral Lateral still needs job specific planning.

USDA soil survey, inside the Fabens mapped community boundaryWhat is mapped
Soil series mappedBluepoint 49 percent, Harkey 17 percent, Pajarito 12 percent, Vinton 6 percent and Gila 4 percent
Texture at the surfaceloamy fine sand 50 percent, fine sandy loam 21 percent and silty clay loam 19 percent
Texture about 40 inches downstratified sand to loamy fine sand to very fine sandy loam 49 percent, silt loam 16 percent and fine sandy loam 12 percent
Engineering class about 40 inches downsilt (ML) 20 percent, clayey sand (SC) 12 percent and silty sand (SM) 11 percent
Average clay content about 40 inches down11 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel60 percent of the area

Bedrock is not mapped in the top five feet of the Fabens area, which helps with initial planning but does not rule out deeper rock. The USDA soil survey maps no seasonal water table within 60 inches and no flood prone soils, though Salatral Lateral still calls for care at a channel crossing. High steel corrosion risk is mapped across 60% of the area, so the line owner should address casing or tracer wire protection. The geologic map identifies Holocene alluvium, with sand, silt, clay and gravel that can vary along channels.

How do we bore through Bluepoint soil in Fabens?

Bluepoint soil in Fabens includes loamy fine sand and variable alluvium, so the bore plan has to account for ground that may not hold open. We match fluid, reaming and pipe timing to the mapped ground and the crossing.

  1. Because Fabens soil includes loamy fine sand, we use drilling fluid to support the hole, ream in stages and have the pipe ready before the last pass.
  2. Where the mapped silt loam occurs near Fabens roads, we control fluid pressure so softened ground does not wash out beneath pavement.
  3. At a Salatral Lateral crossing, we plan the bore beneath the channel and check during planning whether Army Corps jurisdiction applies.
  4. Before drilling near a marked utility on G Avenue, we hydrovac pothole it; a walkover locator then tracks the head while depth and pitch are logged.
Walkover locator held over a flowing creek while tracking the drill head on a 385 foot rock bore in Guthrie, Oklahoma
Tracking the drill head with a walkover locator over a flowing creek on a 385 foot bore in Guthrie, Oklahoma.

Where might a Fabens bore go under Interstate 10?

Interstate 10 runs 1.2 mapped roadway miles inside the Fabens community, while Texas State Highway 20 has 2.0 miles and FM 76 has 2.4 miles. FM 793 and FM 258 also run inside the mapped boundary. US 80 runs along or touches it. These roads can mean state right of way work and a bore beneath pavement. Fabens Road, 1st Street and G Avenue are among the longest named local streets, so a route plan should show which roadway and driveway crossings are involved.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate1.2 roadway miles insideState highway office
Texas State Highway 20State highway2 roadway miles insideState highway office
FM 76State highway2.4 roadway miles insideState highway office
FM 793State highway1.4 roadway miles insideState highway office
FM 258State highway0.4 roadway miles insideState highway office
US 80Highway nearbyRuns along or touches the city limitsState highway office
Union PacificRailroad2.37 track miles insideThe railroad
Salatral LateralStream2.42 channel miles insideChecked for Corps of Engineers jurisdiction
San Felipe ArroyoStream2.09 channel miles insideChecked for Corps of Engineers jurisdiction
River DrainStream1.1 channel miles insideChecked for Corps of Engineers jurisdiction
I- 243 LateralStream0.95 channel miles insideChecked for Corps of Engineers jurisdiction
Tornillo CanalStream0.69 channel miles insideChecked for Corps of Engineers jurisdiction
Mesa DrainStream0.23 channel miles insideChecked for Corps of Engineers jurisdiction
Franklin CanalStream0.21 channel miles insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific has 2.37 track miles inside Fabens on its Valentine Subdivision, and Amtrak uses the track. Public mapping shows 5 street and rail crossings in the community. A bore beneath the track needs an agreement from Union Pacific, with casing, depth and flagging addressed in that agreement. Salatral Lateral runs 2.42 channel miles, and mapped streets cross named streams 23 times. A channel route needs site planning, including a check for Army Corps jurisdiction.

Who has to sign off on a Fabens bore in El Paso County?

Fabens is an unincorporated census designated place, so it has no city government. El Paso County or the state has authority over the route, depending on the road. For Interstate 10, Texas State Highway 20, FM 76, FM 793, FM 258 or US 80 right of way work, the line owner files the utility application through TxDOT RULIS, and TxDOT’s El Paso District reviews it. We prepare the bore plan and profile for the utility owner to submit, then work under its permit. TxDOT sets cover by line type, with different depths for highway crossings and right of way runs.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose buried lines should we check in El Paso County near Fabens?

EPA drinking water records cannot match a public water provider to the specific Fabens address, so the provider serving that address has to be confirmed with the city, the county or the local water district before a bore is planned. El Paso Electric and Rio Grande Electric Cooperative report electric service in El Paso County; that does not establish which one owns a line at a particular G Avenue address. Confirm the line owner and conduit specifications before planning an electric conduit bore.

Line ownerWhat it isSourceSize
El Paso Electric and Rio Grande Electric CooperativeElectric utilities reporting service in El Paso CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Fabens’ median housing year at 1988. The same estimates show 16% of homes built before 1960, 74% from 1960 to 1999, and 10% in 2000 or later. A replacement bore near 1st Street may meet older buried services, while a new service can take a different route. We hydrovac pothole marked utilities on the path before drilling near them; paint shows position, not depth.

Hydrovac truck and boring equipment staged beside an airport taxiway for utility daylighting in Oklahoma City
Our hydrovac truck and boring equipment beside an airport taxiway in Oklahoma City, set up to expose a utility crossing.

Do you cover Fabens and nearby Socorro?

Fabens is an unincorporated community in El Paso County, with a mapped area of 4.33 square miles and an elevation of 3,659 feet. Its ZIP code is 79838. Morning Glory is 5.1 miles northwest, Tornillo is 5.9 miles southeast, and Clint is 7.2 miles northwest. Socorro, the nearest larger city, is 10.8 miles northwest; El Paso, the county seat, is 28.5 miles northwest. From the Yukon, Oklahoma yard, the drive to Fabens is 704 road miles and 13.1 hours, which affects how we plan crew and equipment mobilization.

Places near Fabens

What kinds of bores come up along Fabens Road in Fabens?

  • Highway crossing: A bore beneath Interstate 10 or FM 76 needs a route plan that accounts for TxDOT right of way and pavement.
  • Water service: A service bore near Fabens Road can avoid an open cut across a driveway, once the address water provider is confirmed.
  • Fiber drop: A conduit route along G Avenue can pass beneath pavement and sidewalks without cutting the surface.
  • Drain crossing: A bore beneath Salatral Lateral needs channel specific planning and a check for Army Corps jurisdiction.
  • Rail crossing: A bore under Union Pacific track requires an agreement with the railroad covering the crossing details.
  • Street replacement: A replacement line near 1st Street can be bored after marked utilities are exposed along the planned path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Union Pacific in Fabens?

For a Fabens quote, send the address or map pin, what is going in the ground, pipe or conduit size and footage; a sketch or plans help. That lets us see whether a route near Union Pacific, Salatral Lateral or Interstate 10 needs a crossing plan, potholes or more site detail before we price the work.

A short route in mapped Bluepoint soil, away from pavement and crossings, is simpler to plan than a long route through several obstacles. The price reflects bore length, pipe or conduit size, soil, utilities that must be crossed and exposed, pavement, drainage crossings, pits, excavator time, sand backfill and mobilization. For Fabens, the 704 road miles from Yukon matter to mobilization; an Interstate 10 crossing, Union Pacific track or Salatral Lateral crossing can add planning and field work.

Questions people ask about boring in Fabens

Does Trinity take directional boring work in Fabens and El Paso County?

Yes. We take directional boring work in Fabens, El Paso County, with our own crews and partner contractor yards that we have vetted. You work with Trinity from the first call through the bore log, whether our crew or a partner crew is on site. We can review a route near Fabens Road or another mapped street.

What does a Fabens bore beneath Union Pacific track need?

A crossing beneath the 2.37 miles of Union Pacific track in Fabens needs an agreement from Union Pacific. That agreement addresses the crossing details, including casing, depth and flagging. The track is on the Valentine Subdivision, and a route plan should identify the precise crossing before the railroad review.

Can a line be bored under Salatral Lateral in Fabens?

It may be possible, depending on the route, soil and channel conditions. Salatral Lateral runs 2.42 channel miles inside Fabens, so we would plan the bore beneath the channel and check during planning whether the crossing falls under Army Corps jurisdiction. The route and line details are needed to assess it.

Which electric company owns a Fabens line in El Paso County, and who confirms conduit specs?

El Paso Electric and Rio Grande Electric Cooperative report service in El Paso County, but that does not identify the owner at a specific Fabens address. The line owner needs to be confirmed before a conduit bore near G Avenue is planned, and that owner should confirm conduit specifications for its line.

Who handles a Fabens street near G Avenue, and does the road have to be cut?

Fabens has no city government, so its streets fall to county or state authority rather than a city street department. Whether a cut is allowed depends on the road and its authority. A bore across G Avenue can keep the roadway surface uncut, subject to the route and any applicable approval.

What do Fabens housing ages near 1st Street mean for a replacement bore?

The American Community Survey 2019 to 2023 five year estimates give Fabens a median housing year of 1988, with 16% of homes built before 1960. A replacement route near 1st Street may encounter older services, so we expose marked utilities before drilling close to them. A new service may follow a different path.

Can I reach Trinity after hours about an urgent bore near G Avenue in Fabens?

Yes. A person answers Trinity’s phone 24 hours a day at (405) 409-7423. For an urgent issue near G Avenue, tell us what line or crossing is involved and where the work is needed so we can discuss the response and site details.

How much notice does Texas811 need before a Fabens Road bore, and what about the marks?

For a bore along Fabens Road, Texas law requires a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. If work slips more than 14 days past the original notice, make a new request. Have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of directional boring near Interstate 10 in Fabens?

The route, bore length, pipe or conduit size, soil, pavement, utility crossings, drainage work, pits and equipment time all affect the price. Near Interstate 10, TxDOT right of way requirements can add planning. A Union Pacific track or Salatral Lateral crossing and the 704 road miles from Yukon can also affect the job scope.

Where the Fabens facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Fabens

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Fabens, Texas

Type the address of your job in Fabens. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Fabens

Same county: El Paso · Horizon City · Fort Bliss · Homestead Meadows South · Canutillo · Homestead Meadows North · Anthony · Sparks · Westway · Agua Dulce · Vinton · Prado Verde. All counties: Texas county list.