Clyde Texas Directional Boring: Chaney Loamy Fine Sand, Interstate 20 and Kaiser Creek
Quick Answer: The City of Clyde runs the surface water system, while three electric utilities report service in Callahan County; confirming the line owner matters before a conduit bore. At Interstate 20, Trinity Boring Solutions takes directional boring, also called horizontal directional drilling (HDD), work in Clyde, Texas, for utility crossings. Clyde is 307 road miles from our Yukon, Oklahoma main office, and the Union Pacific track adds a crossing to plan around. Chaney loamy fine sand covers 64 percent of mapped area, with sandy clay common at 40 inches, so hole support and fluid control matter.
Clyde bores at a glance
- Incorporated city in Callahan County, Texas. Population 4,051 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 307 miles, about 6.1 hours of driving.
- Ground: Chaney soil is mapped on 64 percent of the area, with sandy clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 2 percent of the area.
- Highways inside the boundary: Interstate 20, FM 18, FM 604 and FM 2700. State permit office: TxDOT Abilene District.
- Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
- Named streams inside the boundary: Kaiser Creek.
- Public water: City of Clyde, surface water.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who can I call for directional boring in Clyde and Callahan County?
Trinity Boring Solutions takes directional boring work in Clyde, in Callahan County, where the Census Bureau Vintage 2024 estimate puts the population at 4,051. We install water, sewer, gas, electric conduit and fiber, including service runs along 1st Street or connections near the City of Clyde water system. Before a conduit route is set, the electric line owner needs to be confirmed for the address.
Our main office is in Yukon, Oklahoma, and Clyde work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We have had no utility strike in over 25 years, a record that matters around the City of Clyde water lines and the electric lines reported in Callahan County. Trinity is a family business started in 1965, with directional boring work dating to 1982.

What kind of ground does Clyde’s Chaney soil create for a bore?
The USDA soil survey maps Chaney loamy fine sand across 64 percent of Clyde, and the mapped surface texture is loamy fine sand across 66 percent. That surface can cut readily but may cave behind the drill, so we plan fluid and reaming to support the hole. At about 40 inches below the surface, sandy clay is mapped under 77 percent of the area, and 83 percent is mapped as heavy clay at that depth. These are mapped soil patterns, not test borings, so the route still needs field judgment.
| USDA soil survey, inside the Clyde city limits | What is mapped |
|---|---|
| Soil series mapped | Chaney 64 percent, Abilene 17 percent, Pedernales 13 percent and Sagerton 3 percent |
| Texture at the surface | loamy fine sand 66 percent, loam 20 percent and fine sandy loam 13 percent |
| Texture about 40 inches down | sandy clay 77 percent, clay loam 17 percent and clay 6 percent |
| Engineering class about 40 inches down | lean clay (CL) 85 percent and clayey sand (SC) 13 percent |
| Average clay content about 40 inches down | 41 percent |
| Bedrock mapped within 60 inches | 2 percent of the area (0 percent hard rock, 2 percent weathered rock) |
| Seasonal water table within 60 inches | 2 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 23 percent of the area |
Bedrock within 60 inches is mapped in 2 percent of the area, so bedrock is not mapped in the top five feet across most Clyde sites. Seasonal water table is mapped within 60 inches in 2 percent, and flood prone soils are not mapped. High steel corrosion risk is mapped in 23 percent, a concern for uncoated steel casing or tracer wire that the line owner should address. The geologic map includes Quartz Sand Disintegration Residuum of Quaternary age and Antlers Sand of Early Cretaceous age, indicating sand and sandstone as well as claystone below the soil.
How is a bore run through Clyde’s sandy clay?
Clyde’s sandy clay at about 40 inches can cling to a reamer and grip pipe. We adjust the drilling fluid and ream in stages, with the route and actual returns guiding the work.
- Chaney loamy fine sand can fall behind the bit, so we use drilling fluid to support the hole and stage the reaming before pulling in pipe.
- With sandy clay mapped under 77 percent of Clyde at about 40 inches, we watch fluid returns and keep pressure controlled beneath pavement.
- We hydrovac pothole marked utilities near the City of Clyde water system and confirmed electric lines before the drill reaches them.
- At a Kaiser Creek crossing, we track the drill head from the surface, log depth and pitch, and plan the route around the channel.

Where does a line have to go under Union Pacific in Clyde?
Interstate 20 runs 4.3 mapped roadway miles inside Clyde, with FM 18, FM 604 and FM 2700 also crossing the city. US 80 runs along or touches the limits. A bore under a state road needs a route and depth that fit the roadway permit, rather than an open cut through pavement. The longest named street is 1st Street at 3.46 miles in the city, followed by 4th Street at 1.63 miles and Stephens Street at 1.24 miles. Those corridors can involve pavement and existing service lines.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 20 | Interstate | 4.3 roadway miles inside | State highway office |
| FM 18 | State highway | 3.7 roadway miles inside | State highway office |
| FM 604 | State highway | 1.4 roadway miles inside | State highway office |
| FM 2700 | State highway | 0.4 roadway miles inside | State highway office |
| US 80 | Highway nearby | Runs along or touches the city limits | State highway office |
| Union Pacific | Railroad | 2.14 track miles inside | The railroad |
| Kaiser Creek | Stream | 0.87 channel miles inside | Checked for Corps of Engineers jurisdiction |
Union Pacific has 2.14 track miles in Clyde on its Baird Subdivision, and public mapping shows 3 street and rail crossings in the city. A line under the track needs an agreement from Union Pacific, which sets the crossing conditions. Kaiser Creek runs 0.87 channel miles through Clyde, with 6 mapped street crossings of named streams. Creek work is checked for possible U.S. Army Corps of Engineers jurisdiction during planning. With no lakes or ponds mapped within one mile of Clyde, we can focus our review on underground utilities.
Who has to sign off on a Clyde bore under Interstate 20?
Interstate 20, FM 18, FM 604 and FM 2700 are TxDOT roads, so utility work in their right of way needs a TxDOT utility permit. The TxDOT Abilene District reviews the application, and the utility owner, not the drilling contractor, files it through RULIS. We prepare the bore plan and profile and work under the permit issued to that utility owner. TxDOT depth requirements depend on line type and route, and the district can set a different depth in the permit. Clyde is incorporated, so city streets such as 1st Street belong to the city itself. For a Clyde crossing of Union Pacific track, we also need an agreement with the railroad before planning the bore. Planning a Kaiser Creek crossing includes checking for Corps jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Clyde near the City of Clyde system?
The City of Clyde public water system uses surface water and lists 1,708 service connections serving 3,820 people. Those lines matter when setting a path near 1st Street or other service corridors. AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative report electric service in Callahan County, but that does not identify the owner at every address. We confirm the line owner before planning a conduit bore, then use hydrovac potholing to expose marked lines before the drill approaches.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Clyde | Public water system | Surface water | 1,708 connections, 3,820 people served |
| AEP Texas North, Comanche County Electric Cooperative Association and Taylor Electric Cooperative | Electric utilities reporting service in Callahan County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Clyde’s median housing year at 1972; 37 percent of homes were built before 1960, and 15 percent were built in 2000 or later. That mix can mean both replacement work on older services and new connections. Near 1st Street, paint marks show a utility’s position, not its depth, so we pothole marked lines before crossing them.

Where is Clyde in relation to Baird and our Yukon office?
Clyde is an incorporated city in Callahan County, covering 3.28 square miles at an elevation of 2,007 feet, and its ZIP code is 79510. Baird is 6.3 miles east and is the county seat; Abilene, the nearest larger city, is 14.1 miles west. Potosi is 11.6 miles southwest, Impact is 15.6 miles northwest and Putnam is 18.2 miles east. From our Yukon, Oklahoma main office, the road trip to Clyde is 307 miles and takes 6.1 hours, which can affect mobilization for work near Interstate 20 or Kaiser Creek.
Places near Clyde
- Directional boring in Baird: 6.3 miles east
- Directional boring in Potosi: 11.6 miles southwest
- Directional boring in Abilene: 14.1 miles west
- Directional boring in Impact: 15.6 miles northwest
- Directional boring in Putnam: 18.2 miles east
Which jobs call for a bore near Kaiser Creek in Clyde?
- Highway crossing: A utility line beneath Interstate 20 needs a bored route that follows the TxDOT permit and protects the pavement.
- Water service: A new or replacement connection near 1st Street must be planned around the City of Clyde surface water system.
- Fiber route: A conduit bore along FM 18 can avoid an open cut through pavement while crossing marked utilities by plan.
- Creek crossing: A route beneath Kaiser Creek needs channel planning and a check for possible Corps jurisdiction.
- Rail crossing: A bore under the Union Pacific Baird Subdivision needs an agreement with the railroad before the crossing is set.
- Electric conduit: Near 4th Street, the serving line owner must be confirmed because several utilities report service in Callahan County.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What do you need to quote a directional bore near 1st Street in Clyde?
Start with a map pin or address, because a spot near 1st Street can have different pavement, utilities or access than a crossing at Kaiser Creek. When we plan underground work in Clyde, tell us what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the route and identify nearby roads, tracks or drainage crossings.
The price follows the conditions at the proposed route. In Clyde, Chaney soil and sandy clay at about 40 inches matter because sticky ground can change fluid use and reaming. The number of utilities to expose, pavement or concrete, and any Kaiser Creek or Union Pacific crossing affect the work plan. Pit needs, excavator time and sand backfill also count. A job far from Yukon adds mobilization, while emergency or high profile work can add planning demands.
Questions people ask about boring in Clyde
Does Trinity take directional boring jobs in Clyde and Callahan County, and how are crews assigned?
Yes. Trinity takes directional boring work in Clyde and across Texas. Our Yukon, Oklahoma main office coordinates each job, and our crews or vetted partner contractor crews may handle the field work. One Trinity contact stays involved from the first call through the bore log, including work near Interstate 20 or Kaiser Creek.
Will a bore in Clyde hit rock along the planned route and affect how we set the drilling depth?
Rock is possible, but the soil survey maps bedrock within 60 inches in only 2 percent of the area, so it is not mapped in the top five feet across most sites. The geologic map shows Quartz Sand Disintegration Residuum and Antlers Sand. A site check is still needed for a route near 1st Street.
Who approves a Clyde bore under Interstate 20, and which state office reviews it?
TxDOT reviews utility work in the Interstate 20 right of way through its Abilene District. The utility owner submits the application through RULIS, while we prepare the bore plan and profile and work under the issued permit. The permit sets the route conditions for the crossing.
What agreement do we need before boring beneath Union Pacific track in Clyde?
A crossing under the Union Pacific Baird Subdivision needs an agreement with Union Pacific. The railroad sets the crossing requirements, including casing, depth and flagging. Clyde has 2.14 track miles in the city, so the agreement needs to match the specific track location and proposed line.
Can a line be bored beneath Kaiser Creek in Clyde?
A bore beneath Kaiser Creek can be planned, subject to the route and site conditions. The creek has 0.87 channel miles within Clyde, and planning includes checking whether the crossing falls under U.S. Army Corps of Engineers jurisdiction. We would also account for the creek channel when setting the bore path.
Who runs Clyde’s public water system, and where does its water come from when we plan underground work nearby?
The City of Clyde owns and runs the public water system, which uses surface water. It lists 1,708 service connections serving 3,820 people. Near 1st Street, we locate and expose marked water lines before drilling close to them because surface paint does not show line depth.
Does Trinity cover Baird and rural sites outside Clyde?
Yes. Trinity takes work in Texas beyond Clyde, including projects near Baird and rural sites outside the city limits. Baird is 6.3 miles east and is the Callahan County seat. The route, access and distance from our Yukon office help determine how a job is staffed and planned.
How much notice does Texas811 need for a bore near Clyde’s 1st Street?
For a bore near 1st Street, Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For work in Clyde, we follow Texas811’s notice window of at least two working days before digging. If marks are worn or moved, request refreshed marks before work continues.
What affects the cost of a Clyde directional bore under Interstate 20?
The scope sets the price, with soil and crossing conditions high on the list. Sandy clay mapped at about 40 inches can affect drilling and reaming, while an Interstate 20 crossing brings permit and pavement requirements. Length, pipe size, potholing, pits, concrete, creek or rail crossings and mobilization from Yukon also affect the work.
Where the Clyde facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Clyde
- U.S. Census Bureau, TIGER/Line 2024: Clyde boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Clyde
- U.S. Census Bureau, American Community Survey 2019 to 2023: Clyde housing units and year built
- Macrostrat geologic map compilation: map units under Clyde
- U.S. EPA Safe Drinking Water Information System: public water systems serving Clyde
- U.S. Department of Transportation, North American Rail Network: track owners in Callahan County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Callahan County
- U.S. Geological Survey, Elevation Point Query Service: Clyde elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Clyde
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Clyde
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Clyde, Texas
Type the address of your job in Clyde. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Clyde
Same county: Cross Plains. All counties: Texas county list.