Como Texas Directional Boring: Woodtell Loam, Texas State Highway 11, CPKC Track
Quick Answer: City of Como groundwater lines and electric service reported by Oncor Electric Delivery Company are already part of the picture; we confirm the line owner before a conduit bore near Main Street. We take directional boring, also called horizontal directional drilling (HDD), work in Como, Texas, including routes near the CPKC (Kansas City Southern) track. Como is 270 road miles from our Yukon yard, so that distance matters for work near Texas State Highway 11. Woodtell soil and clay mapped about 40 inches down can make the reamer sticky and grip pipe.
Como bores at a glance
- Incorporated city in Hopkins County, Texas. Population 750 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 270 miles, about 5.5 hours of driving.
- Ground: Woodtell soil is mapped on 49 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 35 percent of the area.
- Highways inside the boundary: Texas State Highway 11 and FM 69. State permit office: TxDOT Paris District.
- Railroad track inside the boundary: CPKC (Kansas City Southern), with 7 mapped street and rail crossings.
- Named streams inside the boundary: East Caney Creek.
- Public water: City of Como, groundwater wells.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring in Hopkins County near Como?
City of Como runs the local groundwater system, while Oncor Electric Delivery Company reports electric service in Hopkins County; confirming the line owner matters before a bore near Main Street. The Census Bureau Vintage 2024 estimate puts Como at 750 people. We install water, sewer, gas, electric conduit and fiber for routes along streets such as Main Street or Katy Street, with the path set by the project.
Our main office is in Yukon, Oklahoma, and Como work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We started directional boring in 1982, building on a family business that began in 1965. Four decades of boring helps us plan for the sticky Woodtell clay mapped below Como streets.

What kind of ground does Como Woodtell soil point to?
The USDA soil survey maps Woodtell soil across 49 percent of Como, Crockett across 35 percent and Freestone across 16 percent. Woodtell loam with 2 to 5 percent slopes is the leading map unit. At about 40 inches below the surface, the mapped texture is clay across 51 percent and clay loam across 49 percent, with average clay content of 43 percent. That deep clay can cling to a reamer and grip pipe, so we plan staged reaming and a same day pull rather than leaving an open hole.
| USDA soil survey, inside the Como city limits | What is mapped |
|---|---|
| Soil series mapped | Woodtell 49 percent, Crockett 35 percent and Freestone 16 percent |
| Texture at the surface | loam 83 percent and fine sandy loam 16 percent |
| Texture about 40 inches down | clay 51 percent and clay loam 49 percent |
| Engineering class about 40 inches down | fat clay (CH) 100 percent |
| Average clay content about 40 inches down | 43 percent |
| Bedrock mapped within 60 inches | 35 percent of the area (0 percent hard rock, 35 percent weathered rock) |
| Seasonal water table within 60 inches | 17 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 100 percent of the area |
The USDA soil survey maps weathered bedrock within 60 inches across 35 percent of Como, with typical bedrock depth of 53 inches; hard bedrock is not mapped within that depth. A seasonal water table is mapped within 60 inches across 17 percent, so pits may need pumping. For Como crossings, we use available soil mapping, which does not identify flood prone soils. High steel corrosion risk is mapped throughout Como, so the line owner should weigh casing and tracer wire materials. The Wilcox Group, undivided, of Paleogene age includes mudstone and sand, which can mean changing drilling conditions along a route.
How do crews bore Como clay without losing control?
Woodtell soil and clay mapped below Como call for controlled fluid and a planned pull. We track the drill head from the surface and log depth and pitch, especially where a route approaches Main Street.
- Woodtell clay can stick to the reamer, so we use a thinner drilling fluid with polymer and enlarge the hole in stages before pulling pipe.
- Clay can build pressure beneath pavement near Texas State Highway 11, so we watch fluid returns and keep pressure controlled.
- A seasonal water table is mapped within 60 inches across 17 percent of Como, so pits near Main Street may need pumping.
- Como’s high mapped steel corrosion risk makes casing and tracer wire material a line owner decision; HDPE has no soil corrosion concern.

Which roads, tracks or creeks can a Como bore cross at East Caney Creek?
Texas State Highway 11 runs 1.8 mapped roadway miles inside Como, and FM 69 accounts for 1.6 miles. A route beneath either road needs a bore plan that fits the road corridor. Main Street is the longest named street at 1.65 miles, followed by Smith Street at 0.82 miles and Gaskins Street at 0.77 miles. Katy Street adds another possible route at 0.63 miles. Those street lengths help locate a proposed crossing, but the address and utility marks determine the actual bore path.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 11 | State highway | 1.8 roadway miles inside | State highway office |
| FM 69 | State highway | 1.6 roadway miles inside | State highway office |
| CPKC (Kansas City Southern) | Railroad | 2.38 track miles inside | The railroad |
| East Caney Creek | Stream | 0.13 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Morris Creek | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Carroll Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
The CPKC (Kansas City Southern) Greenville Subdivision has 2.38 track miles in Como, and public mapping shows 7 street and rail crossings. East Caney Creek runs 0.13 channel miles inside town, with 1 mapped street crossing of a named stream. Morris Creek touches or follows the boundary, and Carroll Creek is 0.7 miles from the limits. Around Como, our route review shows no lakes or ponds mapped within one mile. Creek banks and track limits need to be reflected in the route plan.
Do I need a permit to bore Como roads or CPKC (Kansas City Southern) track?
For Texas State Highway 11 and FM 69, TxDOT utility accommodation cover depths help set the bore profile: electric and communication crossings need 60 inches below the lowest crossed grade, water crossings need 60 inches, and pressurized sewer crossings need 60 inches. Lines running along the right of way have different cover requirements. The utility owner files through TxDOT’s RULIS system, and the TxDOT Paris District reviews it; we prepare the bore plan and profile for that filing. Beneath existing highway pavement, the installation is bored or tunneled, with rural highway crossings extending beneath all travel lanes.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns lines near the City of Como water system?
The City of Como public water system uses groundwater wells and reports 332 service connections serving 702 people. That is a useful starting point for a proposed water route near Main Street, but the specific line still needs to be located before drilling. Electric providers reporting service in Hopkins County are Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative and Wood County Electric Cooperative. We confirm the line owner for the address before planning an electric conduit bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Como | Public water system | Groundwater wells | 332 connections, 702 people served |
| Oncor Electric Delivery Company, Southwestern Electric Power, Farmers Electric Cooperative and Wood County Electric Cooperative | Electric utilities reporting service in Hopkins County | EIA Form 861 | Confirm the line owner by address |
For Como planning, the 2019 to 2023 five year estimates place median housing year at 1977, a useful context for underground work. The estimates show 15 percent of housing built before 1960, 68 percent from 1960 to 1999 and 17 percent in 2000 or later. That mix can mean replacement work as well as new service routes near Katy Street. We expose every marked utility on the bore path before drilling near it; a proposed crossing under Katy Street gets the same hydrovac potholing check.

What places near Como and Yantis can crews reach?
Como is in Hopkins County at an elevation of 525 feet and covers 1.1 square miles. Its ZIP code is 75431. Sulphur Springs, the county seat and nearest larger city, is 9.9 miles northwest; Yantis is 10.8 miles southwest, Winnsboro is 12.9 miles southeast, Mount Vernon is 16.6 miles northeast and Quitman is 18.4 miles south. Como is 270 road miles and a 5.5 hour drive from our Yukon yard. We take work in Texas, including rural routes beyond Como’s limits.
Places near Como
- Directional boring in Sulphur Springs: 9.9 miles northwest
- Directional boring in Yantis: 10.8 miles southwest
- Directional boring in Winnsboro: 12.9 miles southeast
- Directional boring in Mount Vernon: 16.6 miles northeast
- Directional boring in Quitman: 18.4 miles south
What boring work comes up near Como Main Street?
- Highway crossing: A bore under Texas State Highway 11 stays beneath the roadway, with its profile set to the utility and crossing requirements.
- Water service: A new water connection near the City of Como system needs a route that avoids marked lines along Main Street.
- Fiber conduit: A fiber route crossing Katy Street can be bored below the pavement instead of cutting across the street.
- Creek crossing: A proposed line under East Caney Creek needs a planned depth and a check for federal waterway jurisdiction.
- Rail crossing: A route beneath the CPKC (Kansas City Southern) track needs the railroad’s crossing agreement and its conditions for the bore.
- Street service: A sewer or electric conduit route along Smith Street can be planned around existing marked utilities and access.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Como bore near Katy Street?
For a quote, send the address or map pin, what goes in the ground, the pipe or conduit size and the footage; a sketch or plans help show the route near Katy Street. Tell us whether the work is by Texas State Highway 11, the CPKC track or East Caney Creek, since those crossings shape the bore plan. We stay with the job from the first call through the bore log.
The 270 road miles from Yukon set a mobilization factor before we look at the route. Woodtell clay can affect reaming and fluid management, while a crossing of Texas State Highway 11 or the CPKC track adds crossing details to plan. Length, pipe size, utilities to expose, pavement, creek or drainage crossings, pits, excavator time and sand backfill all affect the scope. In Texas, we can adjust the plan when high profile or emergency work changes it.
Questions people ask about boring in Como
Does Trinity take directional boring work in Como and Hopkins County?
Yes. We take directional boring work in Como and across Texas, planning each crossing around local conditions. Our main office is in Yukon, and Como projects are staffed by our own crews or partner contractor crews from satellite yards. You work with Trinity from the first call through the bore log, including on a route near Main Street.
Does Woodtell soil in Como corrode steel, and what pipe can I use?
The USDA soil survey maps high steel corrosion risk across Como, including Woodtell soil areas. The line owner should consider the corrosion exposure when choosing steel casing or tracer wire materials. For Como installations, we consider HDPE where soil corrosion is a concern; HDPE does not share that concern. The final material choice depends on the line and its owner.
What ground will a bore pass through in Como Woodtell soil?
The USDA soil survey maps Woodtell across 49 percent of Como, with loam at the surface. At about 40 inches down, clay is mapped across 51 percent and clay loam across 49 percent. That sticky ground can ball up on the reamer, so we plan controlled fluid, staged reaming and a prompt pipe pull.
Is there rock near the surface on a Como bore route?
Weathered bedrock is mapped within 60 inches across 35 percent of Como, and typical bedrock depth is 53 inches. For Como bore depth planning, the available mapping does not show hard bedrock within that depth. The Wilcox Group map unit includes mudstone and sand, so a route can encounter changes in material even where hard rock is not mapped.
Who approves a Como bore under Texas State Highway 11?
TxDOT handles the utility permit for a bore on Texas State Highway 11 right of way, with review by the TxDOT Paris District. The utility owner applies through RULIS, and we prepare the bore plan and profile. Cover needs depend on the line type and crossing, and the permit can set a different depth.
What does a Como bore under CPKC (Kansas City Southern) track need?
A crossing beneath CPKC (Kansas City Southern) track needs an agreement from the railroad that owns it. For Como crossings, we follow the agreement’s conditions for casing, depth and flagging. Como has 2.38 track miles of the railroad’s Greenville Subdivision inside town, so a proposed route needs to account for that corridor.
Does Trinity cover Sulphur Springs and rural places outside Como?
Yes. We take work in Sulphur Springs, 9.9 miles northwest of Como, and at rural sites outside town limits. Our Yukon main office is 270 road miles away, and projects are staffed by our crews or vetted partner contractors. The route and access at each address shape the plan.
How much notice does Texas811 need for a bore near Como Main Street?
For a bore near Main Street, request a Texas811 locate at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If our Como start slips more than 14 days past the original notice, we submit a new request. Before work continues in Como, we have worn or moved marks refreshed through Texas811.
What affects the cost of directional boring in Como near Texas State Highway 11?
The price depends on the job scope, not one single measure. Distance from Yukon, bore length, pipe or conduit size, Woodtell clay, pavement, utilities to expose and crossings all matter. A Texas State Highway 11 or CPKC track crossing can add planning needs, while creek work, pits, equipment time and emergency timing also affect the job.
Where the Como facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Como
- U.S. Census Bureau, TIGER/Line 2024: Como boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Como
- U.S. Census Bureau, American Community Survey 2019 to 2023: Como housing units and year built
- Macrostrat geologic map compilation: map units under Como
- U.S. EPA Safe Drinking Water Information System: public water systems serving Como
- U.S. Department of Transportation, North American Rail Network: track owners in Hopkins County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hopkins County
- U.S. Geological Survey, Elevation Point Query Service: Como elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Como
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Como
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Como, Texas
Type the address of your job in Como. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Como
Same county: Cumby · Tira. All counties: Texas county list.