Fulshear Texas Directional Boring: Katy Soil, Bessies Creek And FM 1093

Quick Answer: City of Fulshear groundwater wells supply its water system, and CenterPoint Energy reports electric service in Fort Bend County; we confirm the line owner before boring near FM 1093. At Bessies Creek, we take directional boring, also called horizontal directional drilling (HDD), work in Fulshear, Texas, to place utility lines without cutting the channel. Cross Creek Bend Lane is 463 road miles from our Yukon, Oklahoma, main office, a distance that shapes mobilization. USDA maps clay loam below, where sticky soil can grip pipe and call for staged reaming.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Fulshear bores at a glance

  • Incorporated city in Fort Bend County, Texas. Population 54,629 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 463 miles, about 9.2 hours of driving.
  • Ground: Katy soil is mapped on 44 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: FM 1093, FM 1463 and FM 359. State permit office: TxDOT Houston District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Bessies Creek, Flewellen Creek, Jones Creek and Cottonwood Creek.
  • Public water: City of Fulshear, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring in Fulshear, Fort Bend County?

Fulshear is in Fort Bend County, where the Census Bureau Vintage 2024 estimate puts the population at 54,629. We take directional boring work for water, sewer, gas, electric conduit and fiber. On Bois d’Arc Lane, those lines can run beneath streets or driveways, where a bore can avoid opening the paved surface.

Our main office is in Yukon, Oklahoma, and Fulshear work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore was roughly 4,100 feet of 48 inch pipe under the Arkansas River in Tulsa. A typical Fulshear job is much shorter, perhaps carrying a service beneath Fulshear-Katy Road. Our family business started in 1965, and since 1982 we have done directional boring, including planning for FM 1093 crossings.

Trinity Boring Solutions Ditch Witch JT922 HDD rig and vacuum excavation truck on a commercial bore in Oklahoma City
Our Ditch Witch JT922 drill and vacuum excavation truck on a commercial bore in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is Fulshear soil like to bore through near Katy?

The USDA soil survey maps Katy soil across 44 percent of Fulshear, with Katy fine sandy loam mapped across 15 percent. At the surface, fine sandy loam covers 64 percent of the city and clay covers 19 percent. About 40 inches down, clay loam is mapped across 45 percent, with sandy clay loam across 21 percent. Katy and Cyfair soil series show mapped patterns, not test borings, so we do not treat them as site specific subsurface results. The clay loam and clay can stay on the reamer and grip pipe, so the bore plan has to account for sticky cuttings rather than assuming the surface texture continues below.

USDA soil survey, inside the Fulshear city limitsWhat is mapped
Soil series mappedKaty 44 percent, Cyfair 18 percent, Brazoria 12 percent, Norwood 5 percent and Belk 5 percent
Texture at the surfacefine sandy loam 64 percent, clay 19 percent and loamy fine sand 6 percent
Texture about 40 inches downclay loam 45 percent, sandy clay loam 21 percent and clay 16 percent
Engineering class about 40 inches downlean clay (CL) 70 percent, fat clay (CH) 21 percent and silty clay (CL ML) 5 percent
Average clay content about 40 inches down35 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches31 percent of the area
Flood prone soils2 percent of the area
High corrosion risk for uncoated steel47 percent of the area

The geology map identifies the Lissie Formation, a Pleistocene unit of sand, silt and clay. Bedrock is not mapped in the top five feet, which does not rule out rock at greater depth. The USDA soil survey maps a seasonal water table within 60 inches across 31 percent of the area, so pits may need pumping. Flood prone soils cover 2 percent. High steel corrosion risk is mapped across 47 percent, a reason to discuss casing and tracer wire materials with the line owner. The clay loam can hold an open hole but may swell around pipe.

How do crews bore Fulshear clay loam?

Clay loam is mapped below Fulshear, where it can stick to tooling and tighten around the pipe. Near Katy soil areas, we match fluid and reaming steps to the ground rather than forcing one long pull.

  1. Clay loam at about 40 inches can cling to the reamer, so we use staged reaming and plan to pull pipe while the hole is ready.
  2. With 31 percent of Fulshear mapped for a seasonal water table within 60 inches, we keep pits practical and plan to manage water.
  3. Near Bessies Creek, we plan depth beneath the channel and check the proposed water crossing for possible federal jurisdiction.
  4. Along Cross Creek Bend Lane, a walkover locator tracks the drill head; we log depth and pitch and expose marked lines before approaching them.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

What is in the way of a new line in Fulshear near Bessies Creek?

FM 1093, FM 1463 and FM 359 run through Fulshear, so a route may need a state highway crossing or work beside a highway right of way. TxDOT maps 4.8 roadway miles of FM 1093 inside the city. Cross Creek Bend Lane stretches 6.89 miles within the limits, Bois d’Arc Lane 3.58 miles, and Fulshear-Katy Road 2.0 miles. A bore beneath those streets can keep pavement intact, but its route still needs utility locates and a workable entry and exit pit.

CrossingTypeMapped extentWho has a say
FM 1093State highway4.8 roadway miles insideState highway office
FM 1463State highway3.4 roadway miles insideState highway office
FM 359State highway2 roadway miles insideState highway office
Bessies CreekStream3.35 channel miles insideChecked for Corps of Engineers jurisdiction
Flewellen CreekStream3.18 channel miles insideChecked for Corps of Engineers jurisdiction
Jones CreekStream1.07 channel miles insideChecked for Corps of Engineers jurisdiction
Cottonwood CreekStream0.04 channel miles insideChecked for Corps of Engineers jurisdiction
Brazos RiverStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Brookshire CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Oxbow LakeLake or pond65 acres, nearbyChecked for Corps of Engineers jurisdiction
Fulshear LakeLake or pond4 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Fulshear or within one mile outside the limits, and no street and rail crossings are mapped in the city. Bessies Creek runs 3.35 channel miles inside Fulshear, with 10 mapped street crossings of named streams across the city. Flewellen Creek adds 3.18 channel miles. Fulshear Lake is inside the limits, while Oxbow Lake is within one mile outside them. A creek or lake route needs early review for possible federal jurisdiction and enough depth beneath the channel.

Who approves a bore under FM 1093 in Fulshear?

For a bore in FM 1093 right of way, the utility owner files the TxDOT permit application in its online RULIS system; the TxDOT Houston District reviews it. For a Main Street crossing, we give the line owner the bore plan and profile and work under the permit issued to that owner. At FM 1463 crossings, we follow TxDOT Houston District permitting and bore or tunnel beneath existing highway pavement as TxDOT rules call for. For electric and communication lines, cover is at least 60 inches below the lowest point of the crossed grade and 48 inches along the right of way. Water lines need 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. The permit may set another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried in Fulshear near the City of Fulshear system?

The City of Fulshear public water system uses groundwater wells and reports 10,230 service connections serving 34,000 people. That makes water lines a likely locate concern near Fulshear-Katy Road, but the specific route still needs marks before drilling. CenterPoint Energy reports electric service in Fort Bend County. We confirm the electric line owner for the actual address before planning conduit, since the county listing does not identify the provider at every Fulshear property.

Line ownerWhat it isSourceSize
City of FulshearPublic water systemGroundwater wells10,230 connections, 34,000 people served
CenterPoint EnergyElectric utilities reporting service in Fort Bend CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Fulshear’s median housing year at 2015; for underground work, we plan around site conditions. It estimates 3 percent of homes were built before 1960, 4 percent from 1960 to 1999, and 93 percent in 2000 or later. A replacement bore along Bois d’Arc Lane may meet newer service lines as well as older buried facilities. Paint shows a marked line’s position, not its depth, so we hydrovac expose marked utilities before the drill approaches them.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

What is near Fulshear, including Simonton?

Fulshear is an incorporated city entirely in Fort Bend County, with 12.92 square miles of land and an elevation of 111 feet. The ZIP codes are 77441 and 77406. Weston Lakes lies 3.6 miles southwest and Simonton 5.3 miles west; Katy is 7.3 miles north. Richmond, the county seat, is 10.8 miles southeast, and Sugar Land is 16.7 miles southeast. From our Yukon yard, the drive is 463 road miles and 9.2 hours. That distance matters when planning mobilization for work near FM 359 or Bessies Creek.

Places near Fulshear

What kinds of bores come up in Fulshear near Bois d’Arc Lane?

  • Highway crossing: A bore beneath FM 1093 uses a planned route under the roadway instead of opening the existing pavement.
  • Street service: At Bois d’Arc Lane, a water or sewer service can pass beneath pavement while entry and exit pits stay off the travel surface.
  • Creek crossing: A route under Bessies Creek needs channel depth planning and a check for possible federal jurisdiction.
  • Fiber route: Cross Creek Bend Lane’s 6.89 miles in the city offer a long street corridor where conduit routing and utility locates matter.
  • Water connection: A service near the City of Fulshear system needs the existing groundwater lines located before the drill advances.
  • Drainage bore: Near Flewellen Creek, pit placement and a route beneath the channel help keep banks and surface drainage intact.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore in Fulshear near Fulshear Bend Road?

A map pin at Fulshear Bend Road matters because a few blocks can change the utilities, pavement and access a bore must work around. For a proposed bore near Cross Creek Bend Lane, send us the address or pin, what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us check the proposed route against the street and nearby crossings.

The price follows the work at that specific Fulshear location. The 463 road miles from Yukon affect mobilization, while clay loam can mean staged reaming and careful fluid control. A route beneath FM 1093 or Bessies Creek adds crossing details to plan. Pipe size and bore length matter, as do marked utilities to expose, pavement, pits, excavator time and sand backfill. Near Bessies Creek, high profile or emergency work can also change scope, so we confirm the bore plan before scheduling.

Questions people ask about boring in Fulshear

Does Trinity Boring Solutions take jobs in Fulshear, Fort Bend County, and how is the crew staffed?

Yes. We take directional boring work in Fulshear and across Texas, including sites mapped with fine sandy loam near Cottonwood Creek. Our Yukon office coordinates the job, whether our own crew or a vetted partner contractor is on site, and you work with Trinity through the bore log. For a route near Bois d’Arc Lane, the crew plan depends on the job location and scope.

Can a utility line be bored under Bessies Creek in Fulshear?

A bore under Bessies Creek can be planned, with the route and depth set for the channel crossing. Bessies Creek runs 3.35 channel miles in Fulshear, and creek crossings are checked during planning for possible U.S. Army Corps of Engineers jurisdiction. The entry and exit pits also need suitable ground access.

Who runs Fulshear’s public water system, and where does its water come from before we plan underground work near Jones Creek?

The City of Fulshear runs the public water system, which gets its water from groundwater wells. Public records list 10,230 service connections and 34,000 people served in Fulshear; we use that context when coordinating underground utility work. Before a bore near Fulshear-Katy Road, the route still needs locates to identify the actual buried water lines.

Who owns electric lines in Fulshear, Fort Bend County, and who confirms conduit requirements?

CenterPoint Energy reports electric service in Fort Bend County, but that does not establish the provider at every Fulshear address. The line owner for the specific route should confirm conduit specifications before a conduit bore is planned. Along FM 1463, locate marks and potholing help establish where existing facilities sit.

Who controls Fulshear-Katy Road in Fulshear, and must it be cut for a bore?

Because Fulshear is incorporated, we treat Main Street as a city street and coordinate street work with the city. A bore beneath Fulshear-Katy Road can avoid cutting the pavement, subject to the route and approvals that apply to the work. We locate and expose marked utilities first, since surface paint does not show their depth.

How old are homes and buried lines near Bois d’Arc Lane in Fulshear?

Fulshear’s median housing year is 2015, and the American Community Survey estimates 93 percent of homes were built in 2000 or later. That does not date every buried line along Bois d’Arc Lane. A replacement bore can still meet older or newer facilities, so marked utilities need exposure before drilling near them.

Does Trinity cover Weston Lakes and rural sites outside Fulshear?

Yes. We take work in Fulshear and nearby areas, including Weston Lakes, 3.6 miles southwest, and Simonton, 5.3 miles west. Routes outside city limits can involve different access and crossing conditions. Share the location near Bessies Creek or FM 359 so we can review the route and scope.

How much notice does Texas811 need for a Fulshear bore near Cross Creek Bend Lane?

Texas law requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If work on Cross Creek Bend Lane slips more than 14 days past the original notice, make a new request. Along Fulshear Bend Road, we arrange to have worn or moved marks refreshed through Texas811 before work continues.

What affects the cost of directional boring in Fulshear near FM 1093?

The job’s route and scope drive the price, not just its footage. Near FM 1093, highway crossing requirements can shape planning; clay loam affects the drilling approach, and distance from Yukon affects mobilization. Pipe size, length, utilities to expose, pavement, creek or drainage crossings, pits, equipment time, backfill and emergency conditions also matter.

Where the Fulshear facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Fulshear

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Fulshear, Texas

Type the address of your job in Fulshear. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.