trinityboringsolutions.com

Gail Texas Directional Boring: Olton Clay Loam, US 180 and Mesquite Creek

Quick Answer: Willow Valley Road is one of Gail’s longest streets, and we do directional boring, also called horizontal directional drilling (HDD), for utility runs beneath local streets and US 180. Gail has 17.62 public road miles, and the Yukon main office is 363 road miles away; FM 669 also runs through the community. Olton clay loam covers 47 percent of the mapped area; its sticky clay can grip pipe, so we stage the reaming and keep the pipe pull close behind the final pass.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Gail bores at a glance

  • County seat of Borden County, Texas. Population 249 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 363 miles, about 7.5 hours of driving.
  • Ground: Olton soil is mapped on 47 percent of the area, with clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 4 percent of the area.
  • Highways inside the boundary: US 180 and FM 669. State permit office: TxDOT Abilene District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Mesquite Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near US 180 in Gail?

Gail is an unincorporated community in Borden County, with 249 residents in the 2020 Census count. We install water, sewer, gas, electric conduit and fiber lines, routing them beneath streets such as Oak Street or along routes near US 180 when the job plan calls for it. The mapped community has 17.62 public road miles.

Our main office is in Yukon, Oklahoma, and Gail work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and since 1982 we have done directional boring, planning crossings around US 180 in Gail. Our range from 3/4 inch service lines to 48 inch casing fits work from a short Kincaid Avenue service to a longer route beside FM 669.

Horizontal directional drill rig set up on an open grass field with support trucks and a vacuum excavation truck
Our horizontal directional drill set up in an open field with the support trucks and the vacuum excavation truck. Photos on this page are from our jobs in Oklahoma and Texas.

What kind of ground does Olton soil mean for a bore in Gail?

The USDA soil survey maps Olton clay loam across 47 percent of Gail’s area, with a 1 to 3 percent slope. At about 40 inches below the surface, 80 percent is mapped as clay loam and 16 percent as sandy clay loam; the soil classification at that depth is CL across 96 percent of the mapped area. The average clay content there is 36 percent, and 64 percent of the area is mapped as heavy clay. These are survey patterns, not test borings. Sticky clay can ball on a reamer and grip pipe.

USDA soil survey, inside the Gail mapped community boundaryWhat is mapped
Soil series mappedOlton 47 percent, Rough broken land (miscellaneous area) 15 percent, Berda 14 percent, Acuff 14 percent and Colorado 4 percent
Texture at the surfaceclay loam 67 percent, loam 29 percent and fine sandy loam 4 percent
Texture about 40 inches downclay loam 80 percent, sandy clay loam 16 percent and bedrock 3 percent
Engineering class about 40 inches downlean clay (CL) 96 percent
Average clay content about 40 inches down36 percent
Bedrock mapped within 60 inches4 percent of the area (0 percent hard rock, 4 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel49 percent of the area

Bedrock is mapped within 60 inches in 4 percent of the area, usually at about 30 inches, and mapped hard bedrock is absent from that depth range. The USDA soil survey maps no seasonal water table within 60 inches, while flood prone soils cover 4 percent. High steel corrosion risk is mapped across 49 percent, so the line owner should consider casing and tracer wire coatings; HDPE is not affected by soil corrosion; in Gail, we consider Olton soil conditions when planning underground routes. The Quaternary red siltstone and shale clast loamy colluvium includes clay, siltstone, shale and minor gypsum, which can mean variable drilling conditions.

How do we drill Gail’s clay loam?

Olton clay loam is common in Gail, and the mapped clay content at about 40 inches averages 36 percent. We choose fluid and reamer passes to manage sticky returns, keep the hole stable and protect pavement.

  1. With Olton clay loam, we use thinner drilling fluid and polymer, then open the hole in stages so sticky cuttings do not build up on the reamer.
  2. At the mapped heavy clay areas around Gail, we watch fluid returns and keep pressure controlled near pavement to reduce the chance of lifting it.
  3. Where the red siltstone and shale clast colluvium meets underlying rock, we adjust the pace and monitor the drill head as ground conditions change.
  4. Near Mesquite Creek, we plan the bore depth around the channel and check the crossing for federal jurisdiction before setting the route.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

What does a bore have to cross near Willow Valley Road in Gail?

US 180 and FM 669 run through the mapped community, so a utility route may need to pass under a state highway as well as local streets. Willow Valley Road is the longest named street at 1.48 miles inside the boundary; Oak Street measures 0.87 miles, and Cherry Street 0.75 miles. A bore beneath pavement can leave the surface uncut, with entry and exit pits placed in dirt where the route allows. The road and utility layout determines the crossing plan.

CrossingTypeMapped extentWho has a say
US 180US highway1.5 roadway miles insideState highway office
FM 669State highway5.4 roadway miles insideState highway office
Mesquite CreekStream0.24 channel miles insideChecked for Corps of Engineers jurisdiction
Little Grape CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Gail or within 1 mile outside the community boundary. Mesquite Creek runs 0.24 channel miles inside the area, and two mapped street crossings intersect named streams; Little Grape Creek is 0.7 miles from the boundary. Unnamed drainage adds 2.19 miles within the community. These creek and drainage features can affect depth and access, so a creek crossing is checked for federal jurisdiction during planning. We consider Mesquite Creek when planning boring in Gail; no lakes or ponds are mapped within 1 mile.

Who approves a bore near US 180 in Borden County in Gail?

Gail has no city government, so local street decisions belong to the county or state, depending on the road. Work in the right of way of US 180 or FM 669 needs a TxDOT utility permit reviewed by the Abilene District. The line owner, not the drilling contractor, submits it through TxDOT’s RULIS system; we provide a bore plan and profile for the proposed route. TxDOT rules set highway cover by line type, including 60 inches at crossings for electric and communication lines and 60 inches for water lines. The permit can set different depths.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

What is already in the ground in Borden County near Gail?

The water provider for a specific address on Oak Street or elsewhere in Gail has to be confirmed with Borden County or the local water district before a bore is planned. Electric utilities reporting service in Borden County to EIA are Oncor Electric Delivery Company, Southwestern Public Service, Big Country Electric Cooperative and Lyntegar Electric Cooperative. That county list does not identify the provider at every address, so the line owner must be confirmed before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Oncor Electric Delivery Company, Southwestern Public Service, Big Country Electric Cooperative and Lyntegar Electric CooperativeElectric utilities reporting service in Borden CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

For Gail in Borden County, the American Community Survey 2019 to 2023 five year estimates put the median housing year at 1997, helping frame underground work planning. The survey estimates 9 percent of homes were built before 1960, 52 percent from 1960 to 1999 and 39 percent in 2000 or later. A replacement line near Cherry Street may have to work around older buried utilities, while newer homes may call for a service extension. We hydrovac pothole marked utilities before drilling near them, since surface marks do not show burial depth.

Reel of yellow polyethylene gas pipe on a trailer staged for a directional bore
A reel of yellow polyethylene gas pipe on a trailer, staged for a directional bore.

Do you cover Gail and nearby Ackerly?

Gail is the Borden County seat, covers 2.01 square miles and sits at an elevation of 2,624 feet. The ZIP code is 79738. Fluvanna is 19.9 miles northeast, Ackerly is 22.6 miles southwest, and O’Donnell is 25.7 miles northwest. Lamesa, the nearest larger city, is 29.0 miles west. From our Yukon, Oklahoma main office, the road distance is 363 miles and the drive is 7.5 hours, which affects mobilization for work around US 180 or FM 669.

Places near Gail

What kinds of bores come up near Oak Street in Gail?

  • Highway crossing: A utility route beneath US 180 needs a TxDOT permit for work in the highway right of way.
  • Street service: A water or sewer service beneath Oak Street can use pits in dirt to avoid opening the paved street.
  • Electric conduit: Near Cherry Street, we confirm the electric line owner and expose marked utilities before drilling close to them.
  • Fiber route: A fiber bore beside FM 669 can follow the planned alignment while staying clear of marked lines.
  • Creek crossing: A route near Mesquite Creek needs depth and access planning around the channel and drainage.
  • Drainage crossing: Unnamed drainage within Gail can affect the bore route, depth and placement of entry and exit pits.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Kincaid Avenue in Gail?

For a Kincaid Avenue quote, send the address or map pin, what will go underground, pipe or conduit size and footage; a sketch or plans help. The route matters here: a line near US 180 may involve a highway right of way, while a route near Mesquite Creek can bring drainage and depth into the plan.

A short service under Oak Street in Olton clay loam may be simpler to plan than a longer crossing near US 180 or Mesquite Creek. Price depends on length, pipe or conduit size, soil and rock, utilities to expose, pavement, creek or drainage crossings, pits, excavator time, sand backfill and the work profile. Gail’s 363 road miles from Yukon also affect mobilization. We need the route details to judge how those conditions combine.

Questions people ask about boring in Gail

Does Trinity take directional boring work in Gail and Borden County?

Yes. Trinity takes directional boring work in Gail, with the Yukon office coordinating the job whether our own crew or a vetted partner contractor is on site. We stay involved from the first call through the bore log. For a route near US 180, the crew and plan depend on the line, size and crossing.

Which electric company should I ask about a conduit bore in Gail, Borden County?

The electric line owner must be confirmed for the specific address before a conduit bore. Oncor Electric Delivery Company, Southwestern Public Service, Big Country Electric Cooperative and Lyntegar Electric Cooperative report service in Borden County, but that does not establish which one serves an Oak Street address. Check the conduit size and route with the confirmed owner.

Who controls Cherry Street in Gail, and does a bore require cutting it?

Gail is unincorporated and has no city government, so Cherry Street decisions belong to the county or state, depending on the road. Directional boring can pass below pavement without cutting the street when the route and access allow it. The location of the pits and the marked utilities still need to be checked.

Could older buried lines near Oak Street affect a replacement bore in Gail?

They could. The American Community Survey 2019 to 2023 estimates put the median housing year in Gail at 1997, with 9 percent of homes built before 1960. A replacement route near Oak Street may have older utilities to locate and expose. We use hydrovac potholing to verify marked lines before drilling close to them.

Does Olton soil in Gail pose a corrosion concern, and what pipe is used?

The USDA soil survey maps high steel corrosion risk across 49 percent of Gail, so the line owner should consider coatings for steel casing and tracer wire. HDPE is not affected by soil corrosion; in Gail, we consider Olton soil conditions when planning underground routes. Olton clay loam is widespread, but the pipe material and any coating depend on the line owner’s requirements.

What ground does a bore pass through in Gail’s Olton soil?

Olton clay loam covers 47 percent of Gail’s mapped area. At about 40 inches below the surface, 80 percent is mapped as clay loam and 16 percent as sandy clay loam; the average clay content at that depth is 36 percent. That sticky ground can cling to a reamer, so we plan staged passes and a close pipe pull.

How far is Gail from the Yukon office, and does Lamesa change mobilization?

Gail is 363 road miles and 7.5 drive hours from the Yukon, Oklahoma main office. Lamesa is 29.0 miles west and is the nearest larger city, but it does not change the measured distance from Yukon. The route, equipment and crew mobilization for a job near FM 669 are part of the quote.

How much notice does a Willow Valley Road bore in Gail need, and what if marks fade?

For a bore near Willow Valley Road, count back at least two working days for Texas811, excluding Saturdays, Sundays and legal holidays. The notice cannot be earlier than 14 days before excavation, and a new notice is needed if the start slips more than 14 days past the original notice. Along Willow Valley Road in Gail, we refresh worn or moved marks before continuing work to keep the boring route clear.

What affects the cost of directional boring near US 180 in Gail?

The route and scope set the cost. Length, pipe or conduit size, Olton clay loam, rock, utilities to expose, pavement and any drainage crossing all matter. A bore near US 180 may need highway permit planning, while Mesquite Creek can affect depth and access. Mobilization from Yukon also matters for Gail.

Where the Gail facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Gail

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Gail, Texas

Type the address of your job in Gail. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Gail

All counties: Texas county list.