trinityboringsolutions.com

O’Donnell Texas Directional Boring: Estacado Loam, US 87 Business and Clay Loam

Quick Answer: At 395 road miles from Yukon, an O’Donnell job is staffed by our crews or vetted partner contractor yards, with routes planned around US 87 Business. We take directional boring, also called horizontal directional drilling (HDD), for lines that need to pass beneath US 87 Business. The USDA soil survey maps Estacado soil across much of O’Donnell. Clay loam at about 40 inches can hold the bore open but may cling to the reamer, so the drilling plan matters.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

O’Donnell bores at a glance

  • Incorporated city in Lynn County and Dawson County, Texas. Population 740 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 395 miles, about 7.6 hours of driving.
  • Ground: Estacado soil is mapped on 50 percent of the area, with clay loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: US 87 Business and FM 2370. State permit office: TxDOT Lubbock District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of O’Donnell, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near O’Donnell’s 9th Street?

Trinity handles O’Donnell work from 395 road miles away in Yukon, staffing it with our crews or vetted partner drilling contractors working from satellite yards. The Census Bureau Vintage 2024 estimate puts O’Donnell’s population at 740, mostly in Lynn County. For a proposed route along 9th Street, we install water, sewer, gas, electric conduit and fiber lines by directional boring.

Our main office is in Yukon, Oklahoma, and O’Donnell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For directional boring near US 87 Business, we draw on a family business begun in 1965 and experience dating to 1982. That experience helps us plan for O’Donnell’s mapped Estacado soil and its clay loam below the surface.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What is O’Donnell’s Estacado soil like to bore?

O’Donnell’s mapped ground is mainly Estacado soil and Pep loams, with Amarillo fine sandy loam also covering a large share of the city. The USDA soil survey maps Estacado and Pep loams across 50 percent of the area and Amarillo fine sandy loam across 41 percent. At about 40 inches below the surface, clay loam is mapped under 50 percent of the area, while sandy clay loam is mapped under 41 percent. For O’Donnell planning, we consider the 31 percent average clay content at that depth alongside local Estacado soil conditions. These are mapped soil patterns, not test borings, so we use them to plan and verify conditions in the field.

USDA soil survey, inside the O’Donnell city limitsWhat is mapped
Soil series mappedEstacado 50 percent, Amarillo 41 percent and Portales 8 percent
Texture at the surfaceloam 58 percent and fine sandy loam 41 percent
Texture about 40 inches downclay loam 50 percent, sandy clay loam 41 percent and loam 8 percent
Engineering class about 40 inches downlean clay (CL) 100 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel50 percent of the area

Bedrock is not mapped in the top five feet of O’Donnell, which does not rule out rock deeper down. Seasonal water tables and flood prone soils are not mapped in the city, so the map does not point to those as routine shallow bore constraints. High steel corrosion risk is mapped across 50 percent of the area, a reason for the line owner to consider steel casing and tracer wire materials. The geologic map identifies the Blackwater Draw Formation, a Cenozoic unit of sand, silt and fine alluvium, along with Paleocene Cenozoic sedimentary rocks.

How do we run a bore through O’Donnell’s clay loam?

O’Donnell’s clay loam at about 40 inches calls for controlled fluid and a deliberate reaming plan. We track the drill head from the surface and log its depth and pitch as the bore advances.

  1. Because Estacado and Pep loams cover much of O’Donnell, we control drilling fluid and watch returns so pressure does not lift pavement on 9th Street.
  2. With clay loam mapped at about 40 inches, staged reaming helps manage sticky cuttings before they build up on the reamer near Doak Street.
  3. We lay out the pipe before the final ream and pull it the same day the hole is opened, a useful sequence for clay loam routes near Standefer Street.
  4. Before working near a marked line on US 87 Business, we hydrovac pothole it; the walkover locator tracks the head and we log depth and pitch.
Bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City
A bore pit with a 6 inch PVC sleeve, traffic cones and blue water line flags at NE 24th Street in Oklahoma City.

Where might a line go under O’Donnell’s US 87 Business?

US 87 Business and FM 2370 run inside O’Donnell, while US 87 runs along or touches the city limits. A line under an existing highway pavement is installed by boring or tunneling, rather than open trenching. The longest named streets include 9th Street at 0.97 miles, Doak Street at 0.96 miles and Standefer Street at 0.9 miles within the city. A route on any of them can be bored beneath the pavement and driveways, leaving those surfaces uncut while pits sit in the dirt on each side.

CrossingTypeMapped extentWho has a say
US 87 BusinessUS highway1.1 roadway miles insideState highway office
FM 2370State highway0.4 roadway miles insideState highway office
US 87Highway nearbyRuns along or touches the city limitsState highway office
Swipe the table sideways to see every column.

No railroad tracks are mapped inside O’Donnell or within one mile outside its limits, and no street and rail crossings are mapped in the city. No named streams are mapped inside or within one mile of O’Donnell, and no street crossings of named streams are mapped. With no lakes or ponds mapped within one mile of O’Donnell, we still verify the route before boring along FM 2370. That leaves the local crossing review focused on roads such as US 87 Business and FM 2370 rather than a mapped rail or water crossing.

Whose permission does an O’Donnell bore in Lynn County need?

For work in the right of way of US 87 Business or FM 2370, the line owner, not our drilling crew, applies for the TxDOT utility permit through RULIS; the TxDOT Lubbock District reviews it. We prepare the bore plan and profile for the owner’s application, then work under the permit issued to that owner. TxDOT cover rules call for 60 inches at highway crossings for electric, communication and water lines, and for pressurized sewer. Along the right of way, the stated cover is 48 inches for electric and communication and 36 inches for water. TxDOT rules call for boring or tunneling beneath existing highway pavement, with highway crossings encased.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are near the City of O’Donnell water system?

The City of O’Donnell public water system uses purchased surface water and reports 316 service connections for 704 people. Electric service reported in Lynn County includes Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric Cooperative. Those county reports do not identify the electric provider for every address on 9th Street or elsewhere in O’Donnell. We confirm the line owner for the specific route before planning an electric conduit bore.

Line ownerWhat it isSourceSize
City of O’DonnellPublic water systemSurface water bought from another system316 connections, 704 people served
Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric CooperativeElectric utilities reporting service in Lynn County and Dawson CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

For underground planning in O’Donnell, the 1957 median housing year in the American Community Survey 2019 to 2023 five year estimates gives us property age context. The survey estimates 60 percent of housing units were built before 1960, and 40 percent from 1960 to 1999. On a Doak Street replacement, older services may be part of the route, while a new connection has a different scope. We hydrovac pothole marked utilities on the bore path before drilling near them, since paint shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover O’Donnell and nearby Welch?

O’Donnell lies mostly in Lynn County, with part of the city extending into Dawson County. At an elevation of 3,046 feet, it covers 0.86 square miles and uses ZIP code 79351. Tahoka, the Lynn County seat, is 13.9 miles north; Welch is 17.1 miles west; and Lamesa, the nearest larger city, is 17.5 miles southwest. O’Donnell is 395 road miles and a 7.6 hour drive from our Yukon yard. That distance is part of planning mobilization for work near US 87 Business or the surrounding routes.

Places near O’Donnell

What kinds of bores come up around O’Donnell’s Doak Street?

  • Highway crossing: A route beneath US 87 Business needs a bore plan that accounts for highway pavement and the TxDOT right of way.
  • Water service: A connection near Doak Street can be routed from the City of O’Donnell system without cutting the street surface.
  • Fiber route: Conduit along 9th Street can pass below pavement and driveways, with marked utilities exposed before the drill approaches them.
  • Electric conduit: A crossing near FM 2370 starts with confirming which county reported electric line owner serves that specific route.
  • Street replacement: A water or sewer replacement near Standefer Street can use pits on either side instead of an open cut through pavement.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near O’Donnell’s 9th Street?

For a 9th Street quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help. That lets us place the proposed route against O’Donnell’s streets and nearby highway crossings. Include any known pavement or driveway limits so we can plan the entry and exit pits.

A short route with clear access on a local street can be simpler to plan than a longer highway crossing. The answer changes with footage, pipe size, O’Donnell’s clay loam, and the number of marked utilities to expose. Pavement on US 87 Business, pits, excavator time and sand backfill can also shape the work. Creek or drainage crossings affect planning where present, and the 395 road miles from Yukon factor into mobilization.

Questions people ask about boring in O’Donnell

Does Trinity Boring Solutions take directional boring work in O’Donnell and Lynn County?

Yes, we take directional boring work in O’Donnell, including routes in its Lynn County portion. Our crews or vetted partner drilling contractors working from satellite yards staff the job, and you work with Trinity through the bore log. A route near 9th Street can be planned around its pavement and marked utilities.

Which company owns the electric lines in O’Donnell’s Lynn County area, and who confirms conduit specs?

County reports list Oncor Electric Delivery Company, Southwestern Public Service, Lyntegar Electric Cooperative and South Plains Electric Cooperative for Lynn County. They do not establish which provider serves a particular O’Donnell address. We confirm the line owner for the route before planning conduit, and the owner confirms the required conduit specifications.

Who controls Standefer Street in O’Donnell, and does a bore mean cutting it?

O’Donnell is an incorporated city, so its city streets, including Standefer Street, belong to the city. Directional boring can pass below street pavement, with pits set in the dirt on either side instead of cutting across the surface. The exact route and access still need to fit the proposed work.

How old are buried lines near O’Donnell’s Doak Street, and what does that mean for replacement bores?

O’Donnell’s American Community Survey 2019 to 2023 estimates put the median housing year at 1957, with 60 percent of housing units built before 1960. That age is a reason to check the route carefully, not proof of a line’s age. For a Doak Street replacement, potholing helps expose marked utilities before the drill nears them.

Can Estacado soil in O’Donnell corrode steel, and what pipe should I use?

The USDA soil survey maps high steel corrosion risk across 50 percent of O’Donnell. That is a consideration for the line owner when choosing steel casing or tracer wire materials. Estacado soil mapping does not determine the pipe for a particular job; the line owner selects materials for the planned installation.

What ground does a bore pass through in O’Donnell’s Estacado soil?

The USDA soil survey maps Estacado and Pep loams across 50 percent of O’Donnell. At about 40 inches, clay loam is mapped under 50 percent of the area and sandy clay loam under 41 percent. Those mapped patterns help us plan fluid and reaming, but they are not a substitute for checking conditions along a proposed route.

How far is O’Donnell from the Yukon office, and does Lamesa change the job plan?

O’Donnell is 395 road miles from our Yukon yard, with a 7.6 hour drive. Lamesa is 17.5 miles southwest and is the nearest larger city, but that does not replace planning for the actual O’Donnell route. Distance from Yukon is one mobilization consideration for work near US 87 Business or local streets.

How much Texas811 notice does a bore near O’Donnell’s 9th Street need, and what if marks fade?

For a bore near 9th Street, Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. For work in Lynn County, if the start slips more than 14 days past the original notice, we make a new request. Before work continues near Doak Street, we refresh worn or moved marks through Texas811 to keep the boring route aligned with current markings.

What affects the cost of a directional bore under US 87 Business in O’Donnell?

The price depends on the route and work involved, not one local feature alone. For US 87 Business, pavement and the highway crossing affect planning. O’Donnell’s clay loam, pipe size, footage, utilities to expose, pits and backfill also matter. Mobilization from Yukon is another factor because O’Donnell is 395 road miles from the yard.

Where the O’Donnell facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in O’Donnell

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in O'Donnell, Texas

Type the address of your job in O'Donnell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for O'Donnell

County: Dawson County directional boring. Same county: Ackerly · New Home. All counties: Texas county list.