trinityboringsolutions.com

Goldsmith Texas Directional Boring: Conger Loam, Highway 158, Gravelly Loam

Quick Answer: Can your line pass beneath Scharbauer Street without cutting the road? We take directional boring, also called horizontal directional drilling (HDD), work in Goldsmith, Texas, for crossings like that. Goldsmith is 470 road miles from our Yukon, Oklahoma main office, and Texas State Highway 158 is one of the local routes to plan around. Conger soil is mapped across 99 percent of the city, with gravelly loam about 40 inches down, so the hole needs support as it is reamed. We handle lines from 3/4 inch service lines to 48 inch casing, with Scharbauer Street work scoped to its actual route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Goldsmith bores at a glance

  • Incorporated city in Ector County, Texas. Population 229 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 470 miles, about 9.2 hours of driving.
  • Ground: Conger soil is mapped on 99 percent of the area, with gravelly loam about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 158 and FM 866. State permit office: TxDOT Odessa District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Goldsmith, groundwater bought from another system.
  • Electric: City of Goldsmith municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Goldsmith and Ector County?

Can your line go under a road without cutting it? We take directional boring work in Goldsmith, Ector County, where the Census Bureau Vintage 2024 estimate puts the population at 229. On Scharbauer Street, we can bore for water, sewer, gas, electric conduit or fiber rather than open cutting the street. The route and line size set the drilling plan.

Our main office is in Yukon, Oklahoma, and Goldsmith work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. That experience covers Goldsmith projects from a small service line to 48 inch casing, including routes along Midland Street.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Goldsmith and Conger soil?

The USDA soil survey maps Conger across 99 percent of Goldsmith, mainly as Conger loam on 0 to 2 percent slopes. Loam is the mapped surface texture throughout the city. At about 40 inches below the surface, 99 percent is mapped as gravelly loam, with the same area classified as CL. Average clay content at that depth is 26 percent, and no sandy area is mapped there. We use mapped Conger soil patterns for planning, not as substitutes for project specific test borings. For a bore near Scharbauer Street, the gravel can cut readily but may let the hole cave behind the drill head.

USDA soil survey, inside the Goldsmith city limitsWhat is mapped
Soil series mappedConger 99 percent
Texture at the surfaceloam 100 percent
Texture about 40 inches downgravelly loam 99 percent
Engineering class about 40 inches downlean clay (CL) 99 percent
Average clay content about 40 inches down26 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

The USDA soil survey maps no seasonal water table within 60 inches, no flood prone soils and no high steel corrosion risk in Goldsmith. Bedrock is not mapped in the top five feet, which helps with initial planning but does not rule out deeper rock below Conger loam. The geologic map includes the Blackwater Draw Formation, Cenozoic sand, silt and fine alluvium, as well as Paleocene sedimentary rocks. Gravelly material can shift the drill head, so depth and pitch need close tracking near Alma Street.

What does it take to bore Goldsmith gravelly loam?

Conger loam and gravelly material call for a bore that stays supported as the hole opens. For a route under Midland Street, we plan the entry and exit pits in dirt and keep the pavement between them intact.

  1. At a Scharbauer Street crossing, we use staged reaming and drilling fluid to help keep Goldsmith gravelly loam from falling in before the line is pulled.
  2. We lay out the pipe before the final ream near Midland Street, reducing the time an open hole sits in Conger gravel.
  3. Before drilling near marked utilities along Goldsmith Street, we expose each one with hydrovac potholing; surface paint shows position, not depth.
  4. We follow the drill head from the surface and record depth and pitch as it advances through the mapped Conger ground near Alma Street.
Bobcat E35 mini excavator lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in northeast Oklahoma City
Lowering a 6 inch PVC sleeve into a bore pit in sandy soil at NE 24th Street in Oklahoma City.

Where might a Goldsmith line go under Scharbauer Street?

Texas State Highway 158 and FM 866 run inside Goldsmith, with mapped roadway lengths of 0.4 miles and 0.3 miles in the city. No other highway is listed within 1.5 miles outside the limits. Scharbauer Street is the longest named street at 1.33 miles; Midland Street and Goldsmith Street each run 0.83 miles. A bore plan can keep those paved routes uncut, with pits set beyond the crossing and the path matched to the actual line location.

CrossingTypeMapped extentWho has a say
Texas State Highway 158State highway0.4 roadway miles insideState highway office
FM 866State highway0.3 roadway miles insideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Goldsmith or within 1 mile of its limits, so a mapped rail crossing is not part of the local route picture. The street and rail crossing count is also listed as none. No named streams or stream crossings are mapped in or within 1 mile of the city, and no lakes or ponds are mapped within 1 mile. A crossing plan for Scharbauer Street therefore focuses on pavement and buried utilities rather than a mapped track or water channel.

Who approves a Goldsmith bore under Texas State Highway 158?

Goldsmith is an incorporated city, so its city streets belong to the city itself. For work in the right of way of Texas State Highway 158 or FM 866, the utility owner, not the driller, applies for a TxDOT utility permit through RULIS. The TxDOT Odessa District reviews it. For work involving TxDOT Odessa District permits, we give the line owner the bore plan and profile and work under that owner’s permit. TxDOT rules call for boring or tunneling beneath existing highway pavement, casing at crossings, and cover depths set by line type and permit. No railroad or stream crossing is mapped near Goldsmith.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the lines near the City of Goldsmith water system?

The City of Goldsmith owns the public water system, which uses purchased groundwater and reports 237 service connections serving 257 people. A new service near Goldsmith Street needs to be planned against the existing water route and the connection point. In Ector County, we account for Goldsmith’s municipal electric system during underground planning. Oncor Electric Delivery Company and Southwestern Public Service report service in Ector County, so the line owner for a particular conduit route must be established before its specifications are set.

Line ownerWhat it isSourceSize
City of GoldsmithPublic water systemGroundwater bought from another system237 connections, 257 people served
City of Goldsmith municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration229 customers reported
Oncor Electric Delivery Company and Southwestern Public ServiceElectric utilities reporting service in Ector CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Goldsmith housing at a median build year of 1957; 64 percent of homes date before 1960, while 4 percent were built in 2000 or later. Older housing can mean replacement work beside buried lines, but age alone does not establish the pipe location. Before a drill approaches a marked line, we expose it with hydrovac potholing. For a proposed bore beneath Midland Street, that check confirms depth rather than relying on paint alone.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

What is near Goldsmith and West Odessa?

Goldsmith is in Ector County at an elevation of 3,154 feet and covers 0.32 square miles. Its ZIP code is 79741. West Odessa lies 12.1 miles southeast and is the nearest larger place listed; Odessa, the county seat, is 17.4 miles southeast. Gardendale is 15.2 miles east, while Andrews is 23.7 miles north. The Yukon, Oklahoma main office is 470 road miles away, a 9.2 hour drive, so that distance is part of planning a Goldsmith mobilization.

Places near Goldsmith

What boring work comes up near Goldsmith Midland Street?

  • Highway crossing: A line under Texas State Highway 158 needs a route and permit coordinated with the utility owner and TxDOT Odessa District.
  • Street crossing: A bore beneath Scharbauer Street can keep pavement intact, with entry and exit pits placed off the travel path.
  • Water service: A connection near the City of Goldsmith system needs its route checked against existing water lines before drilling.
  • Electric conduit: A route near Midland Street starts with identifying the line owner and confirming the conduit specifications.
  • Fiber drop: A fiber bore along Alma Street can avoid an open cut across pavement when the route and utility locations allow.
  • Service replacement: A replacement line near Goldsmith Street can use potholing to verify existing buried lines before the drill advances.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send to price a Goldsmith bore near Alma Street?

Start with a map pin or street address, because a few feet can move a planned route from Alma Street to a different pavement or utility crossing. Before we plan a bore through Goldsmith’s loam, tell us what will go in the ground, the pipe or conduit size and the footage. A sketch or plans help us see the entry pits, exit pits and nearby lines before we shape the bore plan.

The 470 road miles from Yukon affect mobilization for a Goldsmith job. Conger gravelly loam, bore length and pipe size affect the drilling plan, while a Texas State Highway 158 crossing brings permit and cover requirements. We also consider how many marked utilities need exposure, pavement or concrete, pit and excavator time, sand backfill, drainage crossings and emergency or high profile work. Alma Street access and the actual route help define the scope.

Questions people ask about boring in Goldsmith

Does Trinity take directional boring work in Goldsmith and Ector County, and who staffs it?

Yes. We take directional boring work in Goldsmith, Ector County, and handle the project from the first call through the bore log. Our own crews and vetted partner contractor yards support the work, with Trinity staying your contact whichever crew is on site. That lets a Scharbauer Street bore follow one plan and one point of contact.

Who runs the Goldsmith water system, and where does its water come from?

The City of Goldsmith owns the public water system, and its source is purchased groundwater. Public records list 237 service connections serving 257 people. For a new line near Goldsmith Street, the route still needs to be checked against existing water infrastructure before drilling begins.

Who owns electric lines in Goldsmith and Ector County, and who confirms conduit specs?

The City of Goldsmith owns its municipal electric system. Oncor Electric Delivery Company and Southwestern Public Service report electric service in Ector County, but that does not identify the owner at every address. Before planning conduit near Midland Street, we establish the line owner and confirm the specifications for that route.

Does Goldsmith control Goldsmith Street, and can a line go under it without a cut?

Goldsmith is an incorporated city, so we coordinate boring on Scharbauer Street with the city that owns its streets. A directional bore can pass beneath Goldsmith Street without opening the pavement when the route and site conditions allow. The marked utilities still need to be exposed before the drill approaches them, so their actual depth can be checked.

What do older homes near Goldsmith Midland Street mean for replacement bores?

Goldsmith housing has a median build year of 1957 in the American Community Survey 2019 to 2023 five year estimates, and 64 percent of homes were built before 1960. That can make replacement work relevant, but the home age does not locate a buried line. A bore near Midland Street starts with locating and exposing the lines on its path.

What ground does a bore pass through in Goldsmith Conger soil?

The USDA soil survey maps Conger loam across 99 percent of Goldsmith. About 40 inches down, the mapped texture is gravelly loam across 99 percent of the area. Gravel can let the hole cave behind the bit, so staged reaming and support from drilling fluid matter for a bore near Scharbauer Street.

What bore sizes and lengths can Trinity handle near Goldsmith Alma Street?

We handle lines from 3/4 inch service lines up to 48 inch casing, and bore lengths from 10 feet to 5,000 feet. The right size and length for Alma Street depend on what goes in the ground and the route available for pits. Send the location, line size and footage so we can scope it.

How early should I call Texas811 before a Goldsmith Scharbauer Street bore?

For a bore near Scharbauer Street, submit the Texas811 locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before. If work starts more than 14 days after the original notice, make a new request. If marks shift near Texas State Highway 158, we have them refreshed through Texas811 before continuing work.

What affects the cost of a Goldsmith bore under Texas State Highway 158?

We price each Goldsmith job by scope, not footage alone, and account for the 470 road miles from the Yukon main office when scheduling. For a Texas State Highway 158 crossing, permit needs and cover requirements affect planning. We also account for length, pipe size, Conger gravelly loam, marked utilities, pavement, pits, excavation time and mobilization from Yukon. A route near Scharbauer Street can add different crossing and access needs than a service line in dirt.

Where the Goldsmith facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Goldsmith

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Goldsmith, Texas

Type the address of your job in Goldsmith. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Goldsmith

All counties: Texas county list.