Greenville Texas Directional Boring: Leson Clay, Interstate 30, Long Branch
Quick Answer: Interstate 30 cuts through Greenville, and Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), for crossings here. Greenville is 235 road miles from our Yukon, Oklahoma yard, with US 67 also crossing the city. Leson soil covers 38 percent of the mapped area, and heavy clay can cling to the reamer and grip pipe. At Long Branch, we plan the bore to stay below the channel and keep the creek bank uncut.
Greenville bores at a glance
- County seat of Hunt County, Texas. Population 34,355 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 235 miles, about 4.7 hours of driving.
- Ground: Leson soil is mapped on 38 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 27 percent of the area.
- Highways inside the boundary: Interstate 30, US 67, US 67 Business, US 69 Business and US 69. State permit office: TxDOT Paris District.
- Railroad track inside the boundary: Dallas, Garland and Northeastern Railroad, CPKC (Kansas City Southern) and a short line railroad (reporting mark NTRW), with 51 mapped street and rail crossings.
- Named streams inside the boundary: Long Branch, Farber Creek, Cowleech Fork Sabine River and Horse Creek.
- Public water: City of Greenville, surface water.
- Electric: City of Greenville municipal electric system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring in Greenville near Interstate 30?
Interstate 30 and US 67 create route crossings for Greenville projects, and we take directional boring work in Hunt County. The Census Bureau Vintage 2024 estimate puts Greenville at 34,355 people. We install water and sewer lines, gas lines, electric conduit and fiber beneath routes such as Jack Finney Boulevard or Wesley Street, with the bore path set to the site rather than assuming every address has the same underground layout.
Our main office is in Yukon, Oklahoma, and Greenville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our range runs from a 3/4 inch service line near Lee Street to a 48 inch casing bore for a major crossing such as Interstate 30. We are a family business that started in 1965 and has done directional boring since 1982.

How does Leson soil affect boring in Greenville?
The USDA soil survey maps Leson as Greenville’s leading soil series, covering 38 percent of the city. Leson clay, 1 to 3 percent slopes, makes up 25 percent of mapped area, and Leson Urban land complex covers another 12 percent. Surface texture is clay across 59 percent of Greenville. At about 40 inches below the surface, 94 percent is mapped as clay, with average clay content of 50 percent. These are mapped patterns, not test borings; the actual route near Long Branch still needs site specific planning.
| USDA soil survey, inside the Greenville city limits | What is mapped |
|---|---|
| Soil series mapped | Leson 38 percent, Crockett 23 percent, Kaufman 12 percent, Wilson 11 percent and Ferris 3 percent |
| Texture at the surface | clay 59 percent, loam 27 percent and silt loam 11 percent |
| Texture about 40 inches down | clay 94 percent |
| Engineering class about 40 inches down | fat clay (CH) 86 percent and lean clay (CL) 12 percent |
| Average clay content about 40 inches down | 50 percent |
| Bedrock mapped within 60 inches | 27 percent of the area (0 percent hard rock, 27 percent weathered rock) |
| Seasonal water table within 60 inches | 11 percent of the area |
| Flood prone soils | 13 percent of the area |
| High corrosion risk for uncoated steel | 96 percent of the area |
Weathered bedrock is mapped within 60 inches across 27 percent of Greenville, while hard bedrock is not mapped at that depth. The USDA geology map names Silty Clay Decomposition Residuum of Cenozoic age and Neylandville Marl of Maastrichtian age. Seasonal water tables are mapped within 60 inches in 11 percent of the area, and flood prone soils cover 13 percent, so Long Branch crossings need careful pit and channel planning. High steel corrosion risk is mapped across 96 percent, making the line owner’s material choice important for casing and tracer wire.
How do crews handle Greenville clay during a bore?
Greenville’s mapped clay can stay open but turn sticky on the reamer. Along routes such as Joe Ramsey Boulevard, we match the fluid and reaming sequence to the ground and monitor returns near pavement.
- For Leson clay, we use thinner drilling fluid with polymer and open the hole in stages, helping sticky cuttings clear the reamer.
- Because heavy clay can build pressure beneath pavement on Interstate 30, we watch fluid returns and adjust pressure to protect the surface.
- We hydrovac pothole each marked utility along Joe Ramsey Boulevard before drilling near it; locator paint shows position, not burial depth.
- At Long Branch, we plan below the channel, set pits on the banks and track drill depth and pitch from the surface.

Which Greenville roads, tracks or creeks include Long Branch?
Interstate 30 and US 67 each have 15.4 mapped roadway miles within Greenville. US 67 Business adds 7.3 miles, while Texas State Highway 34 has 9.7 miles and FM 1570 has 8.6 miles. A utility crossing beneath existing highway pavement is bored or tunneled, not cut open. The long local streets also shape access: Joe Ramsey Boulevard runs 10.87 miles, Wesley Street 8.41 miles and Jack Finney Boulevard 5.01 miles within the city. We plan pits outside the pavement and keep the route clear of marked lines.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Interstate 30 | Interstate | 15.4 roadway miles inside | State highway office |
| US 67 | US highway | 15.4 roadway miles inside | State highway office |
| US 67 Business | US highway | 7.3 roadway miles inside | State highway office |
| US 69 Business | US highway | 6.7 roadway miles inside | State highway office |
| US 69 | US highway | 3.2 roadway miles inside | State highway office |
| US 380 | US highway | 1 roadway miles inside | State highway office |
| Texas State Highway 34 | State highway | 9.7 roadway miles inside | State highway office |
| FM 1570 | State highway | 8.6 roadway miles inside | State highway office |
| Spur 302 | State highway | 3.8 roadway miles inside | State highway office |
| Texas State Highway 224 | State highway | 1.7 roadway miles inside | State highway office |
| Texas State Highway 66 | State highway | 1.7 roadway miles inside | State highway office |
| FM 499 | State highway | 1.2 roadway miles inside | State highway office |
| FM 2101 | State highway | 1 roadway miles inside | State highway office |
| FM 1569 | State highway | 1 roadway miles inside | State highway office |
The Dallas, Garland and Northeastern Railroad has 8.7 track miles in Greenville; CPKC has 6.46 and the NTRW short line has 5.73. Public mapping shows 51 street and rail crossings, so identify the track owner before setting a crossing plan. Long Branch runs 4.98 channel miles, and Greenville has 31 mapped street crossings of named streams. Farber Creek and Cowleech Fork Sabine River also cross the city. A creek or reservoir route needs channel and bank planning.
Does Greenville need permits near the Dallas, Garland and Northeastern Railroad?
A bore beneath Interstate 30, US 67, Texas State Highway 34 or an FM road falls under TxDOT right of way permitting, with review by the TxDOT Paris District. The utility that owns the line files through TxDOT’s online RULIS system; we prepare the bore plan and profile for that application and work under the owner’s permit. TxDOT rules set cover by line type, including 60 inches for electric and communication crossings and water crossings. A Dallas, Garland and Northeastern Railroad crossing needs an agreement from that track owner. Long Branch planning includes a check for U.S. Army Corps of Engineers jurisdiction.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What is already in the ground in Hunt County and Greenville?
The City of Greenville public water system uses surface water and reports 15,323 service connections serving 33,354 people. That makes the system a key line owner to confirm for a water service near Lee Street. Greenville also owns its municipal electric system, so the city is the electric line owner to contact when sizing conduit along Joe Ramsey Boulevard. We confirm the owner and conduit requirements for the specific route before planning the bore.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Greenville | Public water system | Surface water | 15,323 connections, 33,354 people served |
| City of Greenville municipal electric system | City owned electric system | Reports to the U.S. Energy Information Administration | 16,075 customers reported |
| Oncor Electric Delivery Company, Texas-New Mexico Power, City of Greenville, Fannin County Electric Cooperative, Farmers Electric Cooperative and Trinity Valley Electric Cooperative | Electric utilities reporting service in Hunt County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Greenville’s median housing year at 1978: 17 percent of homes were built before 1960, 61 percent from 1960 to 1999 and 22 percent in 2000 or later. A replacement bore near Wesley Street may need to pass older buried lines as well as newer services. We hydrovac expose each marked utility on the route before drilling near it, since paint shows position, not depth.

How far is Greenville from Neylandville and our Yukon yard?
Greenville is the Hunt County seat, at 567 feet in elevation, and covers 32.29 square miles. Addresses use ZIP codes 75402 and 75401. Caddo Mills is 7.2 miles west, while Neylandville is 7.9 miles northeast; Campbell is 9.3 miles east. Greenville is also 32.6 miles east of Allen, the nearest larger city listed. From our Yukon, Oklahoma yard, the drive to Greenville is 235 road miles and 4.7 hours, a distance that can affect crew mobilization and equipment planning.
Places near Greenville
- Directional boring in Caddo Mills: 7.2 miles west
- Directional boring in Neylandville: 7.9 miles northeast
- Directional boring in Campbell: 9.3 miles east
- Directional boring in Josephine: 12.4 miles west
- Directional boring in Lone Oak: 12.7 miles southeast
- Directional boring in Allen: 32.6 miles west
What would we bore near Joe Ramsey Boulevard in Greenville?
- Highway crossing: An Interstate 30 bore keeps the existing pavement and travel lanes uncut, with the route designed for the required right of way permit.
- Water service: A connection near Lee Street needs the City of Greenville water line owner confirmed before we choose the tie in route.
- Fiber conduit: A run beneath Joe Ramsey Boulevard can avoid opening pavement while marked utilities are exposed along the planned path.
- Creek crossing: A Long Branch bore needs channel depth planning and a check for U.S. Army Corps of Engineers jurisdiction.
- Rail crossing: A bore beneath the Dallas, Garland and Northeastern Railroad needs an agreement with the owner before the crossing is designed.
- Electric conduit: Near Wesley Street, we confirm the City of Greenville municipal electric line owner and the conduit specification before drilling.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
How do I get a quote for a Greenville bore near Lee Street?
For a Lee Street quote, send the address or map pin, what is going in the ground, the pipe or conduit size and the footage; a sketch or plans help us lay out the route. That lets us see whether the work is a short service connection or a longer crossing and what access the pits need. We use the route details to scope the bore, not just the street name.
The scope sets the price, with ground, crossings and logistics carrying different weight on each Greenville route. Leson clay can call for staged reaming and fluid control. Interstate 30 pavement, a railroad track or Long Branch adds crossing planning and exposure work. Pipe size, bore length, concrete or pavement, pit work and excavator time also matter. Greenville’s 235 road miles from Yukon affect mobilization, while emergency timing or a high profile route can change the equipment and crew plan.
Questions people ask about boring in Greenville
Does Trinity Boring Solutions take directional boring work in Hunt County, including Greenville?
Yes. We take directional boring and horizontal directional drilling (HDD) work in Greenville and across Hunt County. Our main office is in Yukon, and our crews and vetted drilling partners handle the site work. You work with Trinity from the first call through the bore log, including for a route near Interstate 30.
Who owns electric lines in Hunt County for a Greenville conduit bore?
The City of Greenville owns its municipal electric system, so confirm the owner for the address before setting conduit specifications. Utilities reporting electric service in Hunt County also include Oncor Electric Delivery Company, Texas New Mexico Power, Fannin County Electric Cooperative, Farmers Electric Cooperative and Trinity Valley Electric Cooperative. The provider can vary by location.
Does the city control Jack Finney Boulevard in Greenville, and must we cut the street?
Greenville is incorporated, so its city streets belong to the city itself. A directional bore can keep Jack Finney Boulevard pavement intact by placing the line below it, with pits outside the pavement. The specific route and line owner still need to be checked before the work is laid out.
Can older buried lines near Wesley Street affect a Greenville replacement bore?
Yes. The American Community Survey 2019 to 2023 estimates put the median Greenville housing year at 1978, with 17 percent of homes built before 1960. A replacement route near Wesley Street can encounter existing services, so we expose each marked utility with hydrovac before drilling close to it.
Will groundwater or flooding near Long Branch cause trouble for Greenville bore pits?
It can affect the plan. The USDA soil survey maps seasonal water tables within 60 inches in 11 percent of Greenville and flood prone soils across 13 percent. For a Long Branch crossing, we plan pit placement around the channel and use pumping if water collects in a pit.
Does Leson soil in Greenville corrode steel, and what pipe should we use?
The USDA soil survey maps high steel corrosion risk across 96 percent of Greenville, including areas with Leson soil. The line owner should consider casing and tracer wire materials and select any needed coating. HDPE avoids the steel corrosion concern, but the owner chooses the pipe and specification for the project.
Does Trinity cover Caddo Mills and rural sites outside Greenville?
Yes. We take work in Caddo Mills, 7.2 miles west of Greenville, and at rural sites in the surrounding area. The route, access and utility crossings determine the plan. For a location outside city limits, the road owner and any applicable highway or railroad crossing authority must be identified.
How much 811 notice is needed for a Greenville bore near Joe Ramsey Boulevard?
Texas811 needs a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Texas811 describes that as at least two working days. For Joe Ramsey Boulevard, worn or moved marks must be refreshed through Texas811 before work continues; a delayed start beyond 14 days needs a new notice.
What affects the cost of a directional bore beneath Interstate 30 in Greenville?
The route and scope determine the price. At Interstate 30, pavement and permit requirements add planning, while Leson clay can change reaming and fluid needs. Bore length and pipe size, utilities to expose, crossings of tracks or Long Branch, pits, excavator time, backfill and mobilization from Yukon also affect the work.
Where the Greenville facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Greenville
- U.S. Census Bureau, TIGER/Line 2024: Greenville boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Greenville
- U.S. Census Bureau, American Community Survey 2019 to 2023: Greenville housing units and year built
- Macrostrat geologic map compilation: map units under Greenville
- U.S. EPA Safe Drinking Water Information System: public water systems serving Greenville
- U.S. Department of Transportation, North American Rail Network: track owners in Hunt County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Hunt County
- U.S. Geological Survey, Elevation Point Query Service: Greenville elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Greenville
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Greenville
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Greenville, Texas
Type the address of your job in Greenville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Greenville
Same county: Commerce · Royse City · West Tawakoni · Quinlan · Wolfe City · Poetry · Celeste · Hawk Cove · Union Valley. All counties: Texas county list.
