Quick Answer: At Main Street, the top five feet are mostly mapped as loam and fine sandy loam, with clay below; what is under it varies by soil map unit. We do directional boring, also called horizontal directional drilling (HDD), for lines crossing Campbell streets, CPKC (Kansas City Southern) track and Caney Creek. The Yukon, Oklahoma main office is 242 road miles away, with Interstate 30 among the local route features to plan around. Rader soil and heavy clay at about 40 inches can make a reamer sticky, so the bore plan has to account for the ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Campbell bores at a glance

  • Incorporated city in Hunt County, Texas. Population 612 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 242 miles, about 4.9 hours of driving.
  • Ground: Rader soil is mapped on 35 percent of the area, with clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 33 percent of the area.
  • Highways inside the boundary: Interstate 30, US 67, Texas State Highway 24, Texas State Highway 50 and FM 499. State permit office: TxDOT Paris District.
  • Railroad track inside the boundary: CPKC (Kansas City Southern), with 5 mapped street and rail crossings.
  • Named streams inside the boundary: Caney Creek, Timber Creek and West Caney Creek.
  • Public water: Campbell Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Which contractor handles directional boring near Main Street in Campbell?

We take directional boring work in Campbell, Hunt County, where the Census Bureau Vintage 2024 estimate puts the population at 612. Along Main Street or beneath US 67, we can install water, sewer, gas, electric conduit and fiber, with the route and crossings set for the specific line. The marked utilities on a proposed path need to be exposed before drilling near them.

Our main office is in Yukon, Oklahoma, and Campbell work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have focused on directional boring since 1982. The range from 3/4 inch service lines to 48 inch casing and 10 feet to 5,000 feet of bore length can fit work from a Main Street service to a CPKC crossing.

Compact Ditch Witch drill rig boring a new utility line across a front yard on a residential street in Edmond, Oklahoma
Our compact Ditch Witch drill boring a new utility line across a front yard on a residential street in Edmond, Oklahoma. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Campbell and its Rader soil?

The USDA soil survey maps Rader fine sandy loam across 35 percent of Campbell, with Crockett loam at 32 percent and Lufkin soil at 15 percent. At the surface, loam accounts for 58 percent and fine sandy loam for 35 percent. At about 40 inches, the mapped texture is clay across 53 percent and sandy clay across 35 percent; average clay content at that depth is 42 percent. For Campbell, we treat mapped patterns as planning context, not test borings. The clay can cling to a reamer and grip pipe, so ground conditions matter to the pull plan.

USDA soil survey, inside the Campbell city limitsWhat is mapped
Soil series mappedRader 35 percent, Crockett 32 percent, Lufkin 15 percent, Axtell 8 percent and Nahatche 3 percent
Texture at the surfaceloam 58 percent, fine sandy loam 35 percent and clay 4 percent
Texture about 40 inches downclay 53 percent, sandy clay 35 percent and clay loam 10 percent
Engineering class about 40 inches downfat clay (CH) 58 percent and lean clay (CL) 42 percent
Average clay content about 40 inches down42 percent
Bedrock mapped within 60 inches33 percent of the area (0 percent hard rock, 33 percent weathered rock)
Seasonal water table within 60 inches41 percent of the area
Flood prone soils4 percent of the area
High corrosion risk for uncoated steel85 percent of the area

Weathered bedrock is mapped within 60 inches across 33 percent of Campbell, with typical bedrock depth at 52 inches; that can mean slower drilling where the route meets weathered material. A seasonal water table within 40 inches is mapped across 41 percent, so pits may need pumping. Flood prone soils cover 4 percent, including ground near Caney Creek. Across Campbell, the mapped high steel corrosion risk covers 85 percent, so we plan material review before underground installation. The mapped units include Fine Silty Clay Decomposition Residuum of Cenozoic age and Navarro Group, undivided, of Late Cretaceous age.

How do we drill through Campbell clay and Rader soil?

Campbell’s soil map shows clay at about 40 inches across much of the mapped area. Around Main Street and Caney Creek, we plan the bore for sticky cuttings, changing moisture and any marked lines on the route.

  1. Rader soil is mapped across 35 percent of Campbell. In sticky clay, we use thinner drilling fluid with polymer, ream in stages and plan the pipe pull for the same work window.
  2. With heavy clay mapped at about 40 inches, we watch fluid returns closely near Main Street pavement so pressure does not lift the surface.
  3. A seasonal water table within 40 inches is mapped across 41 percent of Campbell. Near Caney Creek, small pits and pumping can help manage water at the work area.
  4. Before drilling near a marked line along Patterson, we hydrovac pothole it to expose its depth; a walkover locator tracks the drill head and records depth and pitch.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Where might a Campbell bore pass under CPKC (Kansas City Southern)?

Interstate 30 and US 67 each have 0.3 mapped roadway miles in Campbell. Texas State Highway 24 and Texas State Highway 50 each have 8.7 mapped roadway miles, while FM 499 has 6.9. Main Street is the longest named street at 2.05 miles, followed by Patterson at 2.01 miles and Ocean Drive at 0.58 miles. A route along these roads needs to account for pavement and the particular right of way. Under existing highway pavement, the utility line is installed by boring or tunneling rather than an open cut.

CrossingTypeMapped extentWho has a say
Interstate 30Interstate0.3 roadway miles insideState highway office
US 67US highway0.3 roadway miles insideState highway office
Texas State Highway 24State highway8.7 roadway miles insideState highway office
Texas State Highway 50State highway8.7 roadway miles insideState highway office
FM 499State highway6.9 roadway miles insideState highway office
FM 513State highway1.9 roadway miles insideState highway office
FM 2736State highway0.1 roadway miles insideState highway office
CPKC (Kansas City Southern)Railroad1.99 track miles insideThe railroad
Caney CreekStream0.41 channel miles insideChecked for Corps of Engineers jurisdiction
Timber CreekStream0.16 channel miles insideChecked for Corps of Engineers jurisdiction
West Caney CreekStream0.04 channel miles insideChecked for Corps of Engineers jurisdiction
Lynn CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Watson BranchStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Dunbar CreekStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

CPKC (Kansas City Southern) has 1.99 track miles in Campbell on its Greenville Subdivision, and public mapping shows 5 street and rail crossings in the city. A track crossing needs an agreement with the railroad owner, which sets crossing conditions such as casing, depth and flagging. Caney Creek runs 0.41 channel miles in Campbell, and 3 mapped street crossings cross named streams. Creek work is checked for U.S. Army Corps of Engineers jurisdiction during planning. With no lakes or ponds mapped within one mile of Campbell, we can focus route review on the planned underground alignment.

Who approves a Campbell bore in Hunt County?

For work in a Texas highway right of way, the utility line owner files the application in TxDOT’s online RULIS system; the contractor does not file it. The TxDOT Paris District reviews work on Interstate 30, US 67, state highways and farm to market roads. We give the utility owner the bore plan and profile for its application. Cover depends on the line: electric and communication lines need 60 inches at a highway crossing and 48 inches along the right of way; water needs 60 inches at crossings and 36 inches along it. Pressurized sewer needs 60 inches at crossings. The permit can set another depth.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Campbell through Campbell Water Supply Corporation?

Campbell Water Supply Corporation uses groundwater wells and reports 866 service connections serving 2,598 people. That system is a useful starting point when planning water work near Main Street, but the line owner and exact route still need confirmation. Electric service reported in Hunt County includes Oncor Electric Delivery Company, Texas New Mexico Power, City of Greenville, Fannin County Electric Cooperative, Farmers Electric Cooperative and Trinity Valley Electric Cooperative. We confirm the electric line owner for the address before planning a conduit bore.

Line ownerWhat it isSourceSize
Campbell Water Supply CorporationPublic water systemGroundwater wells866 connections, 2,598 people served
Oncor Electric Delivery Company, Texas-New Mexico Power, City of Greenville, Fannin County Electric Cooperative, Farmers Electric Cooperative and Trinity Valley Electric CooperativeElectric utilities reporting service in Hunt CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Campbell’s median housing year at 1987; 13 percent of homes predate 1960, 77 percent date from 1960 to 1999, and 10 percent were built in 2000 or later. A replacement along Patterson may follow older buried lines, while a new service may take a different route. We hydrovac pothole each marked utility on the bore path before drilling near it; paint shows position, not depth.

Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building
Yellow polyethylene gas pipe pulled through a directional bore beside a commercial building.

Do you cover Campbell, Texas, and nearby Neylandville?

Campbell is in Hunt County at an elevation of 587 feet and covers 1.34 square miles. For work in Campbell, ZIP code 75422 helps us identify the service area when coordinating underground project details. Neylandville is 4.9 miles northwest, Cumby is 6.8 miles east, and Commerce, the nearest larger city, is 7.2 miles northeast. Greenville, the county seat, is 9.3 miles west. Campbell is 242 road miles from our Yukon, Oklahoma main office, a 4.9 hour drive, so distance is part of mobilization planning for work near Interstate 30 or Caney Creek.

Places near Campbell

What kinds of bores come up near Campbell’s Caney Creek?

  • Highway crossing: A bore beneath Interstate 30 keeps the line below the road surface, with the utility owner arranging the TxDOT permit.
  • Water service: A connection near Main Street can be planned from the Campbell Water Supply Corporation system after the specific line route is confirmed.
  • Fiber conduit: A route beside Patterson can use a bore to avoid cutting the street surface, with marked utilities exposed along the path.
  • Creek crossing: A Caney Creek route needs depth planning beneath the channel and a check for federal jurisdiction during planning.
  • Rail crossing: A bore beneath CPKC (Kansas City Southern) track requires the railroad owner’s agreement for the crossing conditions.
  • Utility replacement: Along Ocean Drive, a replacement route can be planned around existing marked lines and exposed before the drill approaches.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Campbell bore near Interstate 30?

Start with the map pin, because a point on Main Street differs from a route beside Caney Creek or across CPKC track. For Campbell street planning, tell us what goes in the ground, the pipe or conduit size, and the footage. A sketch or plans help us see the proposed path and crossings before we scope the work.

A short, clear route through Rader soil with no pavement, track or creek crossing is simpler to plan than a route with several obstacles. Length, pipe size, sticky clay, marked utilities, pavement on Interstate 30, a CPKC crossing and creek work at Caney Creek all affect the scope. Pit needs, excavator time, backfill and the 242 road miles from Yukon also matter. When Campbell work is high profile or emergency related, we build in added planning for the underground scope.

Questions people ask about boring in Campbell

Does Trinity take directional boring jobs in Campbell and Hunt County?

Yes. We take Campbell work in Hunt County and staff it with our own crews or crews at partner contractor satellite yards that we have vetted. For a Campbell project, we stay with you from the first call through the bore log, independent of which crew is at the site. Main Street and Caney Creek are examples of local features a proposed route may need to address.

Who controls Campbell streets, and can a bore avoid cutting Ocean Drive?

Because Campbell is incorporated, we account for city ownership when planning boring work beneath its streets. A directional bore can pass beneath Ocean Drive without opening the street surface, subject to the route and utility clearances. We expose marked utilities along the bore path before drilling near them, since paint on the pavement does not show their depth.

Could older lines near Patterson need replacement bores in Campbell?

They could. The American Community Survey 2019 to 2023 estimates put the median housing year at 1987, with 13 percent of homes built before 1960. A replacement near Patterson may need to account for existing lines and connections. We expose marked utilities before the drill approaches, then plan the new route around what is found.

Can groundwater or flood prone ground affect bore pits near Campbell’s Caney Creek?

Yes. A seasonal water table within 40 inches is mapped across 41 percent of Campbell, so pits near Caney Creek may collect water and need pumping. Flood prone soils cover 4 percent of the mapped area. We consider channel depth and pit placement when laying out a creek crossing.

Does Rader soil in Campbell create a corrosion issue for steel pipe?

The soil survey maps high steel corrosion risk across 85 percent of Campbell. That is a concern for uncoated steel casing and tracer wire, so the line owner selects any needed coating. HDPE is not affected by this soil corrosion risk. Rader fine sandy loam is the largest mapped soil series, covering 35 percent.

What ground does a bore pass through in Campbell’s Rader soil?

The USDA soil survey maps Rader fine sandy loam across 35 percent of Campbell. At about 40 inches, clay is mapped across 53 percent and sandy clay across 35 percent, with average clay content of 42 percent. Sticky clay can ball on a reamer or grip pipe, so staged reaming and fluid control matter.

What bore sizes and lengths can Trinity handle near Deadline in Campbell?

We handle lines from 3/4 inch service lines to 48 inch casing, and bore lengths from 10 feet to 5,000 feet. A route near Deadline still needs a site specific plan for access, soil and marked utilities. Share the proposed line, size and footage so we can assess the work.

How early should I request 811 marks for work by Main Street in Campbell?

Count back at least two working days from the planned start for a Texas811 locate request; Saturdays, Sundays and legal holidays do not count. The ticket cannot be requested more than 14 days ahead, and it remains valid for 20 days after the planned start. If the start slips beyond that period, make a new request. Have worn or moved marks refreshed through Texas811 before work continues near Main Street.

What affects the cost of a directional bore near Interstate 30 in Campbell?

The route and scope decide the price, not footage alone. Length, pipe size, Campbell’s clay, the number of utilities to expose, pavement at Interstate 30, a CPKC crossing and Caney Creek work can change the plan. Pit and excavator needs, backfill, emergency timing and mobilization from Yukon also affect the job.

Where the Campbell facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Campbell

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Campbell, Texas

Type the address of your job in Campbell. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Campbell

Same county: Caddo Mills · Royse City · West Tawakoni · Quinlan · Wolfe City · Poetry · Celeste · Hawk Cove · Union Valley. All counties: Texas county list.