Jolly Texas Directional Boring: Kamay Silt Loam, BNSF Railway, US 82
Quick Answer: Jolly is 153 road miles from our Yukon yard, and Shawnee Trail jobs are handled by our crews or vetted partner crews. We do directional boring, also called horizontal directional drilling (HDD), for lines crossing BNSF Railway in Jolly, Texas. The USDA soil survey maps Kamay soil across much of town, with clay about 40 inches down that can grip a pipe. That ground calls for staged reaming and a same day pull once the hole is opened.
Jolly bores at a glance
- Incorporated city in Clay County, Texas. Population 180 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 153 miles, about 2.9 hours of driving.
- Ground: Kamay soil is mapped on 65 percent of the area, with clay about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 20 percent of the area.
- Highways inside the boundary: US 82, US 287 and FM 2393. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: BNSF Railway, with 2 mapped street and rail crossings.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Which contractor handles directional boring near BNSF Railway in Jolly?
Jolly is 153 road miles from our Yukon yard, and work on Gayle Street is staffed by our crews or vetted partner drilling contractors. The Census Bureau Vintage 2024 estimate puts Jolly at 180 people. We install water, sewer, gas, electric conduit and fiber, with routes planned along local streets such as Gayle Street or toward US 82 to reach the service connection.
Our main office is in Yukon, Oklahoma, and Jolly work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982. Four decades of boring helps us plan for Kamay soil, where clay below the surface can stick to a reamer and grip pipe.

What ground does the USDA map around Jolly and Kamay soil?
The USDA soil survey maps Kamay silt loam across 65 percent of Jolly. Bluegrove soil associations cover 20 percent, and Deandale silt loam covers 9 percent. The surface is mostly silt loam, while at about 40 inches the mapped texture is clay across 78 percent of the area. The average clay content at that depth is 42 percent. Those are mapped patterns, not test borings. The clay can cling to the reamer and tighten around the pipe, so the bore plan needs room for controlled reaming and fluid returns.
| USDA soil survey, inside the Jolly city limits | What is mapped |
|---|---|
| Soil series mapped | Kamay 65 percent, Bluegrove 20 percent, Deandale 9 percent and Renfrow 4 percent |
| Texture at the surface | silt loam 76 percent and loam 24 percent |
| Texture about 40 inches down | clay 78 percent and bedrock 20 percent |
| Engineering class about 40 inches down | lean clay (CL) 76 percent and fat clay (CH) 4 percent |
| Average clay content about 40 inches down | 42 percent |
| Bedrock mapped within 60 inches | 20 percent of the area (0 percent hard rock, 20 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 2 percent of the area |
| High corrosion risk for uncoated steel | 98 percent of the area |
Bedrock is mapped within 40 inches across 20 percent of Jolly, and the mapped bedrock within 60 inches is weathered rather than hard. A soil bit may suit that ground, though the soil to rock contact can steer the head off line. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 2 percent of the area. High steel corrosion risk is mapped across 98 percent, so the line owner should consider casing and tracer wire coatings. The geologic map names the Cisuralian Petrolia Formation, with mudstone and sandstone that can vary along a route.
How do we bore through Jolly clay and Kamay soil?
On Gayle Street, we plan for silt loam near the surface and sticky clay below it. The mapped mix guides the setup, but the bore path and exposed utilities guide the work in the field.
- Ream the Kamay clay in stages and use a thinner fluid with polymer so sticky cuttings do not build up on the reamer.
- Keep fluid pressure controlled beneath Shawnee Trail pavement, where shallow silt loam can soften and wash out if over flushed.
- Expose marked lines along Gayle Street with hydrovac before the drill approaches, since surface paint does not show burial depth.
- Track the head from the surface and record depth and pitch, especially where the mapped 20 percent bedrock area meets soil.

Where might a Jolly bore pass under Bennett Creek or local roads?
US 82 and US 287 each have 1.1 mapped roadway miles inside Jolly, and FM 2393 has 3.2. A route along any of them needs to account for the highway right of way and pavement. Shawnee Trail is the longest named street at 0.5 mile in town. Gayle Street and Dunn Street each have 0.32 mile mapped. Boring can keep pavement, driveways and sidewalks uncut, with pits placed in dirt on either side of the crossing.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 82 | US highway | 1.1 roadway miles inside | State highway office |
| US 287 | US highway | 1.1 roadway miles inside | State highway office |
| FM 2393 | State highway | 3.2 roadway miles inside | State highway office |
| BNSF Railway | Railroad | 0.71 track miles inside | The railroad |
| Bennett Creek | Stream nearby | 0.7 miles outside | Checked for Corps of Engineers jurisdiction |
BNSF Railway owns 0.71 track miles inside Jolly, and public mapping shows 2 street and rail crossings. A bore under the track needs an agreement with BNSF Railway that sets casing, depth and flagging. No named stream is mapped inside town, but Bennett Creek is 0.7 mile from the city limits. No mapped street crosses a named stream inside Jolly, and there are no lakes or ponds within one mile. A planned creek crossing needs a check for federal waterway jurisdiction.
Do I need a permit to bore under US 82 in Jolly?
US 82 is a state highway, so work in its right of way needs a TxDOT utility permit reviewed by the Wichita Falls District. The utility that owns the line submits the application through TxDOT RULIS; we provide the bore plan and profile and work under the utility owner’s permit. US 287 and FM 2393 are also state roads in Jolly. City streets such as Shawnee Trail belong to the incorporated city. A BNSF Railway crossing needs the railroad’s agreement, and a Bennett Creek crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
What lines and services should we check in Clay County and Jolly?
The water provider for a specific Jolly address could not be matched from EPA drinking water records, so confirm it with the city, Clay County or the local water district before planning a bore. Electric utilities reporting service in Clay County are Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative. That countywide list does not identify the provider for every address, so confirm the line owner before an electric conduit bore near Shawnee Trail.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative | Electric utilities reporting service in Clay County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Jolly’s median housing year at 1977. The survey estimates 12 percent of homes were built before 1960, 81 percent from 1960 to 1999 and 7 percent in 2000 or later. A bore along Gayle Street could serve a replacement line or a newer service, but the address and plans determine the scope. We hydrovac pothole marked utilities on the route before drilling near them because paint shows position, not depth.

What is near Jolly, including Henrietta?
Jolly is an incorporated city in Clay County at an elevation of 1,019 feet, covering 0.98 square mile. Its ZIP codes are 76305, 76310 and 76365. Dean is 4.1 miles northwest, Henrietta is 9.9 miles southeast, and Wichita Falls is 10.4 miles west. Henrietta is the county seat, while Wichita Falls is the nearest larger city listed. From the Yukon yard, the drive is 153 road miles and 2.9 hours, which is part of planning crew mobilization for a Jolly bore.
Places near Jolly
- Directional boring in Dean: 4.1 miles northwest
- Directional boring in Henrietta: 9.9 miles southeast
- Directional boring in Wichita Falls: 10.4 miles west
- Directional boring in Lakeside City: 11.4 miles west
- Directional boring in Petrolia: 11.7 miles northeast
What boring work comes up around Gayle Street in Jolly?
- Highway crossing: A route beneath US 82 or US 287 uses a bore plan that accounts for pavement and the TxDOT right of way.
- Street service: A water or sewer line along Gayle Street can pass beneath the street surface rather than cut across it.
- Fiber conduit: A conduit route near Shawnee Trail needs marked utilities exposed before the drill approaches the crossing.
- Rail crossing: A line beneath the BNSF Railway track needs the railroad agreement to set casing, depth and flagging.
- Drainage crossing: A route near Bennett Creek needs channel depth planning and a jurisdiction check before the crossing is designed.
- Electric conduit: On a route near Dunn Street, confirm the address specific electric owner before choosing conduit specifications.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a Jolly bore near Shawnee Trail?
For a quote near Shawnee Trail, start with the address or map pin. Tell us what will go in the ground, such as water line or fiber conduit, then give the pipe or conduit size and the footage. A sketch or plans help show whether the route approaches US 82, BNSF Railway or a drainage crossing.
The 153 road miles from Yukon are part of mobilization planning for a Jolly job. Kamay clay and the mapped weathered bedrock can affect drilling time and reaming. A crossing of US 82 or BNSF Railway adds planning and coordination, while concrete or pavement, exposed utilities, pits, excavator time and sand backfill also shape the scope. Creek or drainage crossings and emergency timing can change the work plan. We price the specific route and installation details, not just the footage.
Questions people ask about boring in Jolly
Does Trinity Boring Solutions take directional boring work in Jolly, Clay County?
Yes. We take directional boring work in Jolly, and our own crews and vetted partner drilling contractors handle the field work. The Yukon office remains your point of contact from the first call through the bore log. For a route near Shawnee Trail, provide the location and line details so we can plan the job.
Is rock mapped under Jolly, and how much of the city has bedrock?
Yes, bedrock is mapped within 60 inches across 20 percent of Jolly, and it is mapped as weathered rather than hard. The USDA soil survey also places bedrock within 40 inches across that same share. Near Kamay soil, a soil bit may work in weathered material, but the soil to rock boundary can affect steering.
Who approves a bore under US 82 in Jolly, and which state office reviews it?
TxDOT reviews a utility permit for work in the US 82 right of way through its Wichita Falls District. The utility owner submits the application in TxDOT RULIS, and we prepare the bore plan and profile for work under that permit. The same process applies to the US 287 and FM 2393 right of way in town.
What does a bore under BNSF Railway in Jolly require?
A bore beneath the 0.71 track miles owned by BNSF Railway in Jolly needs an agreement with the railroad. That agreement sets casing, depth and flagging for the crossing. Public mapping shows 2 street and rail crossings in town, so the exact bore route and railroad requirements need to be established before the work is planned.
Can a line be bored under Bennett Creek near Jolly?
A bore under Bennett Creek can be considered if the route and ground support it. The creek is mapped 0.7 mile from Jolly’s limits, not inside town. During planning, a creek crossing is checked for U.S. Army Corps of Engineers jurisdiction, and the bore depth is planned to stay beneath the channel.
Who owns electric lines in Jolly, Clay County, and who confirms conduit specs?
Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative report electric service in Clay County. That does not identify the provider at every Jolly address. Confirm the line owner for the specific location and check conduit specifications with that owner before planning an electric conduit bore along Gayle Street or elsewhere.
Does Trinity cover Dean and rural sites outside Jolly?
Yes. We take work across Texas, including Jolly, nearby Dean and rural sites outside the city limits. Dean is 4.1 miles northwest of Jolly, and routes beyond town may have different access or mobilization needs. Send the location and proposed line details so we can review the site and scope.
How much notice does Texas811 need for a bore near Shawnee Trail in Jolly?
For a Shawnee Trail bore, plan around the ticket’s 20 day window and request marks at least two working days before excavation. Texas law sets 48 hours, excluding weekends and legal holidays, and a request cannot be made more than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed before work continues.
What affects the cost of directional boring near US 82 in Jolly?
The US 82 route, Kamay clay, pipe or conduit size and bore length all affect the scope. Pricing also considers the 153 road mile mobilization from Yukon, utilities that must be exposed, pavement, pits, excavator time, backfill and any crossing of BNSF Railway or drainage. A map pin and plans help identify those conditions.
Where the Jolly facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Jolly
- U.S. Census Bureau, TIGER/Line 2024: Jolly boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Jolly
- U.S. Census Bureau, American Community Survey 2019 to 2023: Jolly housing units and year built
- Macrostrat geologic map compilation: map units under Jolly
- U.S. Department of Transportation, North American Rail Network: track owners in Clay County
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Clay County
- U.S. Geological Survey, Elevation Point Query Service: Jolly elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Jolly
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Jolly
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Jolly, Texas
Type the address of your job in Jolly. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Jolly
Same county: Byers · Bellevue. All counties: Texas county list.
