Byers Texas Directional Boring: Teller Loam, Texas State Highway 79, Wichita River
Quick Answer: Teller loam is mapped across much of Byers; the sandy clay loam at about 40 inches can hold an open hole, while clay may cling to the reamer. We install water, sewer, gas, electric conduit and fiber by directional boring, also called horizontal directional drilling (HDD), including beneath Texas State Highway 79 where the route allows. Byers is 125 road miles from our Yukon, Oklahoma main office, so mobilization is part of planning for work near Main Street. The mapped Teller soil calls for staged reaming and a ready pipe pull.
Byers bores at a glance
- Incorporated city in Clay County, Texas. Population 475 (Census Bureau 2024 estimate).
- Road distance from our Yukon, Oklahoma main office: 125 miles, about 2.8 hours of driving.
- Ground: Teller soil is mapped on 60 percent of the area, with sandy clay loam about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 29 percent of the area.
- Highways inside the boundary: Texas State Highway 79 and FM 171. State permit office: TxDOT Wichita Falls District.
- Railroad track inside the boundary: none mapped.
- Public water: City of Byers, surface water bought from another system.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Does anyone do directional boring near the Wichita River in Byers?
Teller loam is common in Byers, and clay in the soil can stick to drilling tools. We take directional boring work in Byers, Clay County, where the Census Bureau Vintage 2024 estimate puts the population at 475. A water service near Main Street or fiber conduit along Texas State Highway 79 can be installed by bore, as can sewer, gas and electric conduit where the route fits.
Our main office is in Yukon, Oklahoma, and Byers work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. A 3/4 inch service line near Prospect Street and a 48 inch casing beneath Texas State Highway 79 show the span of work we take on. Our family business started in 1965, and we have done directional boring since 1982.

What is Teller soil like to bore in Byers?
The USDA soil survey maps Teller as 60% of the soil series in Byers. Teller loam, on 1 to 3 percent slopes, covers 50% of the mapped area, and the survey lists loam as the surface texture across 96%. At about 40 inches, sandy clay loam is mapped under 60% of the area, with an average clay content of 32%. That mix can hold a bore hole open, but clay can cling to a reamer and grip pipe. We use Byers’ Teller, Stoneburg, and Renfrow soil mapping as planning context, not as a substitute for test borings.
| USDA soil survey, inside the Byers city limits | What is mapped |
|---|---|
| Soil series mapped | Teller 60 percent, Stoneburg 28 percent and Renfrow 8 percent |
| Texture at the surface | loam 96 percent |
| Texture about 40 inches down | sandy clay loam 60 percent, bedrock 29 percent and clay 8 percent |
| Engineering class about 40 inches down | lean clay (CL) 60 percent and fat clay (CH) 8 percent |
| Average clay content about 40 inches down | 32 percent |
| Bedrock mapped within 60 inches | 29 percent of the area (2 percent hard rock, 28 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 0 percent of the area |
| High corrosion risk for uncoated steel | 8 percent of the area |
The USDA soil survey maps bedrock within 60 inches across 29% of Byers, mostly weathered bedrock; hard bedrock is mapped under 2%. A typical depth is 36 inches, so a route may meet rock sooner than expected. Seasonal water tables and flood prone soils are not mapped. High steel corrosion risk covers 8%, a concern for uncoated steel casing or tracer wire; the line owner selects any coating. The Cenozoic Red clay loam decomposition residuum with local gypsum rubble can grade into shale or limestone, so we watch the soil to rock contact.
What does it take to bore sandy clay loam in Byers?
Byers has sandy clay loam mapped at about 40 inches and bedrock in part of the mapped area. We adjust the reaming and fluid plan to the ground along the route, not just the street name.
- Teller loam and clay can cling to the reamer, so we use thinner drilling fluid, ream in stages and plan to pull pipe the day the hole is opened.
- With bedrock mapped within 60 inches under part of Byers, we check depth and pitch as the bore approaches changes from soil into rock.
- Before the drill nears a marked line along Prospect Street, we hydrovac pothole to expose it; paint shows its position, not its depth.
- A proposed route near Bailey Creek calls for checking the channel and planning the bore depth; the Wichita River is also close to the city limits.

What does a bore have to cross in Byers near Texas State Highway 79?
Texas State Highway 79 runs 1.6 mapped roadway miles inside Byers, and FM 171 runs 1.2. A route beneath either road needs to account for the state right of way and the line being installed. Main Street is the longest named street at 1.04 miles; Charlie Road runs 0.64 miles and Prospect Street 0.53. Those streets offer possible bore routes for utilities, but the actual path and marked lines determine where pits can go and what the drill must avoid.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| Texas State Highway 79 | State highway | 1.6 roadway miles inside | State highway office |
| FM 171 | State highway | 1.2 roadway miles inside | State highway office |
| Wichita River | Stream nearby | 0.6 miles outside | Checked for Corps of Engineers jurisdiction |
| Bailey Creek | Stream nearby | 0.9 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Byers or within one mile outside the city limits, so there is no mapped track route to plan around. The Wichita River is 0.6 miles outside the limits and Bailey Creek is 0.9 miles outside; neither is mapped inside the city. No street crossing of a named stream is mapped in Byers, and no lakes or ponds are mapped within one mile. A proposed route toward the Wichita River still needs a channel crossing review during planning.
Do I need a permit to bore in Clay County near Byers?
Byers is an incorporated city, so its city streets belong to the city itself; Texas State Highway 79 and FM 171 are state roads. For work in either highway right of way, the line owner, not the driller, submits the utility permit through TxDOT’s RULIS system. TxDOT’s Wichita Falls District reviews it, and we provide the bore plan and profile for the utility owner’s filing. The permit sets the route and cover. Electric and communication crossings need 60 inches below the lowest crossed grade; water crossings need 60 inches, and pressurized sewer crossings need 60 inches. The district may set a different depth.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Who owns the water lines near the City of Byers?
The City of Byers public water system uses purchased surface water and serves 446 people through 288 service connections. For electric service, Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative report service in Clay County; that does not establish which provider serves a particular address. We confirm the line owner before planning an electric conduit bore near Texas State Highway 79, so the correct line and specifications are checked.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| City of Byers | Public water system | Surface water bought from another system | 288 connections, 446 people served |
| Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative | Electric utilities reporting service in Clay County | EIA Form 861 | Confirm the line owner by address |
The American Community Survey 2019 to 2023 five year estimates put Byers’s median housing year at 1972; 40% of homes were built before 1960, while 8% date to 2000 or later. That mix can mean replacing older lines as well as adding new services near Prospect Street. Before drilling near a marked utility, we expose it with hydrovac potholing because locate paint shows position, not depth. For a planned bore beneath Prospect Street, marked lines on that path would be exposed first.

How far is Byers from Dean and our Yukon office?
Byers is in Clay County, at an elevation of 1,011 feet, and covers 0.99 square miles. Its ZIP code is 76357. Petrolia is 4.5 miles southwest, Dean is 16.0 miles southwest, and Jolly is 16.2 miles southwest. Henrietta, the county seat, is 17.6 miles south; Burkburnett is 21.5 miles west and is the nearest larger city listed. From our Yukon, Oklahoma main office, the road distance is 125 miles and the drive is 2.8 hours, a factor in mobilization for a Byers job.
Places near Byers
- Directional boring in Petrolia: 4.5 miles southwest
- Directional boring in Dean: 16 miles southwest
- Directional boring in Jolly: 16.2 miles southwest
- Directional boring in Henrietta: 17.6 miles south
- Directional boring in Cashion Community: 18.3 miles west
- Directional boring in Burkburnett: 21.5 miles west
What would we bore near the Wichita River in Byers?
- Highway crossing: A water or communication line beneath Texas State Highway 79 needs a planned route under the travel lanes and the cover set in the permit.
- Water service: A new connection near Main Street can be bored from a pit on each side, keeping the pavement uncut.
- Fiber conduit: A run along Prospect Street can pass beneath the street surface rather than opening a trench across it.
- Creek approach: A route toward Bailey Creek needs a planned depth and a check for federal jurisdiction during crossing planning.
- Electric conduit: Before a bore near FM 171, we confirm the line owner and expose marked utilities on the planned path.
- Service line: A small 3/4 inch line near Charlie Road is within the job range we handle, subject to the route and ground.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What drives the price of a bore near Main Street in Byers?
Start with where: an address or map pin near Main Street or Prospect Street. Tell us what is going in the ground, such as a water service, then the pipe or conduit size and footage. A sketch or plans showing the route toward Texas State Highway 79 help us see the crossings and pit locations before we set the scope.
The ground affects the work: Teller loam and the mapped sandy clay loam may need staged reaming, while a route that meets bedrock takes more planning. Crossings matter too, including Texas State Highway 79, pavement, marked utilities and any drainage route. Logistics include pit space, excavator time, backfill and mobilization from Yukon, 125 road miles away. High profile or emergency work along Texas State Highway 79 can also change our boring scope. The route and installation details set the price.
Questions people ask about boring in Byers
Does Trinity take directional boring jobs in Byers and Clay County?
Yes. We take directional boring work in Byers, Clay County, and the customer works with Trinity through the bore log even if a partner contractor’s crew is on site. Our own crews and vetted partner crews staff the work. A proposed run near Main Street can be planned around the actual route, soil and marked utilities.
Who approves a bore under Texas State Highway 79 in Byers?
TxDOT reviews the highway utility permit through its Wichita Falls District. The utility line owner submits the application in RULIS, not the drilling contractor; we provide the bore plan and profile. For Texas State Highway 79, the permit sets the route and required cover for the line being installed.
Can a line be bored under the Wichita River near Byers?
A crossing may be possible, but the route and ground need to be reviewed first. The Wichita River is 0.6 miles outside Byers, and a river crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The depth and bore path depend on the channel and the proposed line.
Who runs the public water system in Byers, and where does its water come from?
The City of Byers owns its public water system and uses purchased surface water, so we coordinate utility planning along Main Street before boring. Public records list 446 people served through 288 service connections. For a proposed water line near Main Street, the system owner and connection details are part of defining the bore route.
Which electric provider serves my address in Byers, Clay County?
Oncor Electric Delivery Company, Texas-New Mexico Power and Wise Electric Cooperative report electric service in Clay County, but those records do not identify the provider for every Byers address. We confirm the line owner before planning conduit near Texas State Highway 79, and the owner can confirm conduit specifications.
Does Byers control Prospect Street, and can a bore avoid cutting it?
Because Byers is incorporated, we treat Main Street as a city street when planning a bore and coordinating the crossing. Directional boring can place a line beneath Prospect Street without cutting the pavement when the route and site conditions allow. We plan the pits on the sides of the crossing and expose marked utilities before drilling near them.
How far is Byers from Yukon, and does Burkburnett affect the job?
Byers is 125 road miles and a 2.8 hour drive from our Yukon, Oklahoma main office. Burkburnett is 21.5 miles west of Byers, but the job’s mobilization is based on the route from Yukon. Distance, access near Texas State Highway 79 and the work scope all factor into planning.
How much Texas811 notice is needed for a bore near Main Street in Byers?
Texas law requires the locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days before it. Texas811 describes that as at least two working days. If a Main Street start slips more than 14 days past the original notice, make a new request; worn or moved marks must be refreshed through Texas811 before work continues.
What affects the cost of directional boring in Byers under Texas State Highway 79?
The price depends on the route and scope, not just footage. Teller loam and possible bedrock affect drilling; a Texas State Highway 79 crossing adds right of way planning. Pipe size, line exposure, pavement, drainage, pits, backfill, equipment time and mobilization from Yukon also shape the work. Along FM 171, high profile or emergency work can change our boring scope.
Where the Byers facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Byers
- U.S. Census Bureau, TIGER/Line 2024: Byers boundary, roads, rail lines and streams
- U.S. Census Bureau, Vintage 2024 population estimates: Byers
- U.S. Census Bureau, American Community Survey 2019 to 2023: Byers housing units and year built
- Macrostrat geologic map compilation: map units under Byers
- U.S. EPA Safe Drinking Water Information System: public water systems serving Byers
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Clay County
- U.S. Geological Survey, Elevation Point Query Service: Byers elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Byers
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Byers
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Byers, Texas
Type the address of your job in Byers. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Byers
Same county: Bellevue. All counties: Texas county list.