trinityboringsolutions.com

Lakeside City Texas Directional Boring: Winters Soil, FM 2380 and Lake Wichita

Quick Answer: FM 2380 is the main road obstacle, and we take directional boring, also called horizontal directional drilling (HDD), work in Lakeside City, Texas, for utility routes that need to pass beneath it. From our Yukon, Oklahoma main office, the 152 road miles matter for a Shoreline Drive mobilization. USDA mapping shows Winters soil across 34 percent of the town, while sandy clay is mapped at about 40 inches on 34 percent of its area. That clay can cling to a reamer, so we manage fluid and ream in stages through Winters soil.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Lakeside City bores at a glance

  • Incorporated city in Archer County, Texas. Population 1,306 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 152 miles, about 3 hours of driving.
  • Ground: Winters soil is mapped on 34 percent of the area, with sandy clay about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 42 percent of the area.
  • Highways inside the boundary: FM 2380 and Texas State Highway 79. State permit office: TxDOT Wichita Falls District.
  • Railroad track inside the boundary: none mapped.
  • Public water: City of Lakeside City, surface water bought from another system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring on Shoreline Drive in Lakeside City?

FM 2380 and Texas State Highway 79 are the state roads a utility route may need to pass beneath in Lakeside City, Archer County. The Census Bureau Vintage 2024 estimate puts the town at 1,306 people. Along Shoreline Drive, Royal Road and Edgewater Drive, we install water, sewer, gas, electric conduit and fiber lines for service routes and utility extensions.

Our main office is in Yukon, Oklahoma, and Lakeside City work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business began in 1965, and we have done directional boring since 1982; FM 2380 work falls under the TxDOT Wichita Falls District. Four decades of boring experience help us plan for Winters soil and the weathered bedrock mapped beneath parts of Lakeside City.

Trinity Boring Solutions directional boring crew, drill rig and hydrovac trailer staged along an airport service road at Will Rogers World Airport in Oklahoma City
Our boring crew, drill and hydrovac trailer staged along a service road at Will Rogers World Airport in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Winters soil in Lakeside City?

The USDA soil survey maps Winters soil across 34 percent of Lakeside City, with Winters loam on 0 to 1 percent slopes covering 18 percent and 1 to 3 percent slopes covering 16 percent. At about 40 inches below the surface, the survey maps sandy clay across 34 percent of the area, clay across 29 percent and bedrock across 28 percent. Average clay content at that depth is 42 percent, and heavy clay is mapped across 63 percent. These are mapped soil patterns, not test holes, so the bore plan still has to respond to the ground encountered.

USDA soil survey, inside the Lakeside City city limitsWhat is mapped
Soil series mappedWinters 34 percent, Bluegrove 27 percent, Kamay 11 percent, Vernon 10 percent and Port 5 percent
Texture at the surfaceloam 34 percent, fine sandy loam 28 percent and clay 14 percent
Texture about 40 inches downsandy clay 34 percent, clay 29 percent and bedrock 28 percent
Engineering class about 40 inches downlean clay (CL) 53 percent, fat clay (CH) 11 percent and elastic silt (MH) 4 percent
Average clay content about 40 inches down42 percent
Bedrock mapped within 60 inches42 percent of the area (0 percent hard rock, 42 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils5 percent of the area
High corrosion risk for uncoated steel90 percent of the area

The USDA soil survey maps bedrock within 60 inches across 42 percent of Lakeside City, and that mapped bedrock is weathered rather than hard. A soil bit may handle that material, but progress can slow where soil meets rock. A seasonal water table within 60 inches is not mapped, while flood prone soils cover 5 percent. High steel corrosion risk is mapped across 90 percent, so the line owner should consider casing and tracer wire protection. The mapped geologic unit is Water; no age is listed.

How do crews bore through sandy clay in Lakeside City?

Lakeside City has substantial clay at depth, including sandy clay and Winters loam. We set the bore around the actual route, keep the hole stable and protect nearby pavement while the drill advances.

  1. Before the drill nears a marked utility, we expose it with hydrovac; on Shoreline Drive, that shows the line’s depth rather than relying on paint alone.
  2. With heavy clay mapped across 63 percent of Lakeside City, we use controlled fluid, polymer and staged reaming to limit sticky cuttings and pipe grip.
  3. Where the survey maps weathered bedrock within five feet, we slow the advance and keep checking the transition from Winters soil into rock.
  4. We track the drill head from the surface and log depth and pitch, keeping the bore beneath streets such as Royal Road without cutting pavement.
Trinity Boring Solutions crew in hard hats at the exit pit with rock tooling on a sandstone bore in Guthrie, OK
Our crew at the exit pit with rock tooling on a sandstone bore in Guthrie, Oklahoma.

Where might a line have to go under FM 2380 in Lakeside City?

FM 2380 has 0.4 mapped roadway miles inside Lakeside City, and Texas State Highway 79 has 0.3. A utility route beneath either state road needs a bore plan suited to its right of way. Shoreline Drive is the longest named street at 1.74 miles in town, followed by Royal Road at 1.36 miles. Edwards Way and Edgewater Drive are also named streets on potential routes. Their pavement and driveways can stay intact when pits are placed beyond the crossing and the line is bored below.

CrossingTypeMapped extentWho has a say
FM 2380State highway0.4 roadway miles insideState highway office
Texas State Highway 79State highway0.3 roadway miles insideState highway office
Holliday CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Lake WichitaLake or pond1,024 acres, insideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Lakeside City or within one mile outside its limits, so a mapped rail crossing is not part of the local route picture. No named stream runs inside town, and public mapping shows no street crossing of a named stream there. Holliday Creek is 0.5 miles from the city limits, so a proposed creek route needs separate site review. Lake Wichita is inside the limits; a planned lake crossing is checked for federal water jurisdiction during planning.

Who approves a Lakeside City bore in Archer County?

FM 2380 and Texas State Highway 79 are state highways, so a bore in their right of way needs a TxDOT utility permit reviewed by the TxDOT Wichita Falls District. The utility that owns the line submits the application through TxDOT’s RULIS system; we provide the bore plan and profile and work under the owner’s permit. TxDOT requires highway installation by boring or tunneling beneath existing pavement, with the permit setting the applicable depth. Lakeside City is incorporated, so its streets, including Shoreline Drive, belong to the city. A proposed crossing near Holliday Creek is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Who owns the public water system, City of Lakeside City, in Lakeside City?

The City of Lakeside City public water system serves 1,091 people through 508 service connections and uses purchased surface water. That system is a key line owner to identify before planning work along Shoreline Drive or Royal Road. The county reports electric service from AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric Cooperative. We confirm the owner of a proposed electric conduit route before planning the bore, rather than assuming one provider serves every address.

Line ownerWhat it isSourceSize
City of Lakeside CityPublic water systemSurface water bought from another system508 connections, 1,091 people served
AEP Texas North, Oncor Electric Delivery Company, Texas-New Mexico Power and Tri-County Electric CooperativeElectric utilities reporting service in Archer CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The 2019 to 2023 American Community Survey five year estimates put Lakeside City’s median housing year at 1983, while loam surface soil matters to boring plans. The estimates show 83 percent of homes built from 1960 to 1999, 14 percent built in 2000 or later and 3 percent built before 1960. That mix can mean both replacement work on older services and new connections. Before drilling near a marked line along Edgewater Drive, we expose it by hydrovac so its depth is known.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

How far is Lakeside City from Pleasant Valley and our Yukon yard?

Lakeside City is in Archer County, covers 0.63 square miles and sits at an elevation of 979 feet. Its ZIP code is 76308. Wichita Falls lies 5.4 miles north, Pleasant Valley is 8.2 miles northwest, and Holliday is 8.6 miles west. Archer City, the county seat, is 17.1 miles south. Our Yukon, Oklahoma yard is 152 road miles away, about a 3.0 hour drive, which is part of planning mobilization for a bore on FM 2380 or Shoreline Drive.

Places near Lakeside City

What boring work comes up near Holliday Creek in Lakeside City?

  • Highway crossing: A water, sewer or conduit route under FM 2380 needs a bore plan for the state right of way and its pavement.
  • Water service: A connection near Shoreline Drive can be routed from the City of Lakeside City system while keeping the street surface intact.
  • Fiber route: A conduit bore along Royal Road can link service points while crews expose marked utilities before drilling near them.
  • Creek crossing: A proposed route near Holliday Creek needs depth planning and review for possible federal water jurisdiction.
  • Lake crossing: A line route involving Lake Wichita needs site review before crews plan a bore beneath the water.
  • Street service: A route along Edgewater Drive can serve a new connection or replace a line while leaving driveways uncut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a bore near Edgewater Drive in Lakeside City?

For a quote near Edgewater Drive, tell us where the work is, what will go in the ground, the pipe or conduit size and the footage. A map pin, street address or sketch can show how the route relates to FM 2380 or Shoreline Drive. Plans help us check pits, access and marked utilities before we scope the bore.

The scope sets the price: length and pipe size matter, as do sandy clay, weathered bedrock and the other ground mapped in Lakeside City. Crossings of FM 2380, pavement, and any concrete affect the plan, as do utilities that must be exposed, pits, excavator time and sand backfill. A route near Lake Wichita or Holliday Creek needs crossing review. Mobilization also reflects the 152 road miles from Yukon, and emergency or high profile work can change the job requirements.

Questions people ask about boring in Lakeside City

Does Trinity Boring Solutions take directional boring jobs in Archer County’s Lakeside City?

Yes. We take directional boring work in Lakeside City and staff it with our own crews or through satellite yards operated by partner drilling contractors we have vetted. From Shoreline Drive to FM 2380, you work with Trinity from the first call through the bore log, whichever crew is on site.

What ground should I expect in Lakeside City’s Winters soil?

Winters soil is mapped across 34 percent of Lakeside City. At about 40 inches below ground, sandy clay is mapped across 34 percent of the town and clay across 29 percent. That clay can stick to the reamer, so staged reaming and controlled drilling fluid help manage the bore.

Could a Lakeside City bore hit rock, and how much bedrock is mapped?

Yes, the USDA soil survey maps bedrock within five feet across 42 percent of Lakeside City. The mapped bedrock is weathered, and hard bedrock is not mapped within that depth. A bore may slow where it meets rock, so the drill plan must allow for changing ground near Winters soil.

Who approves a bore under FM 2380 in Lakeside City?

TxDOT reviews the utility permit for work in the FM 2380 right of way through its Wichita Falls District. The utility owner files through RULIS, while we provide the bore plan and profile and work under the permit issued to that owner. The state permit governs the highway crossing.

Can a line be bored beneath Holliday Creek near Lakeside City?

A creek crossing can be planned, but the route needs site review first. Holliday Creek is 0.5 miles from Lakeside City’s limits, so the crossing location and depth need to be considered. During planning, the proposed creek crossing is checked for U.S. Army Corps of Engineers jurisdiction.

Along FM 2380, who owns Lakeside City’s public water system, and does it use purchased surface water?

The City of Lakeside City owns the public water system, which uses purchased surface water. When planning boring near Shoreline Drive, we consider Lakeside City’s public water system scale: it serves 1,091 people through 508 service connections. Those system details help identify the water line owner before scoping a bore near Shoreline Drive or another local street.

Does Trinity cover Wichita Falls and rural sites outside Lakeside City?

Yes. We serve Oklahoma and Texas and take work across Texas, including Lakeside City, Wichita Falls and rural sites outside the town limits. Wichita Falls is 5.4 miles north of Lakeside City, and our Yukon yard is 152 road miles away, so mobilization is part of the job scope.

How much notice does Texas811 need for a Lakeside City bore on Shoreline Drive?

Paint on Shoreline Drive shows a marked line’s position, not its depth. Texas law requires a Texas811 request at least 48 hours before excavation, excluding weekends and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, submit a new request; have worn or moved marks refreshed before work continues.

What affects the cost of directional boring under FM 2380 in Lakeside City?

We price each job by scope, with Lakeside City 152 road miles from our Yukon main office informing the work plan. Bore length, pipe or conduit size, sandy clay, weathered bedrock, pavement and the number of exposed utilities all affect the work. A crossing under FM 2380 needs highway planning, and mobilization accounts for the 152 road miles from Yukon. Pits, equipment time, backfill and emergency conditions can also change the scope.

Where the Lakeside City facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Lakeside City

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Lakeside City, Texas

Type the address of your job in Lakeside City. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Lakeside City

Same county: Archer City · Scotland · Windthorst · Megargel. All counties: Texas county list.