trinityboringsolutions.com

Kerrville Texas Directional Boring: Soil, Interstate 10, Guadalupe River

Quick Answer: Kerrville is the incorporated county seat of Kerr County, so the city owns its streets; we take directional boring, also called horizontal directional drilling (HDD), beneath routes such as Memorial Boulevard. The Yukon main office is 492 road miles away, a factor for work along Loop 534 or near Center Point. The USDA soil survey maps Kerrville soil across 30 percent of the city, with bedrock near the surface in many areas. That ground can slow a bore and calls for checking the route before setting the drilling plan.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Kerrville bores at a glance

  • County seat of Kerr County, Texas. Population 25,141 (Census Bureau 2024 estimate).
  • Road distance from our Yukon, Oklahoma main office: 492 miles, about 9.6 hours of driving.
  • Ground: Kerrville soil is mapped on 30 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 48 percent of the area.
  • Highways inside the boundary: Interstate 10, Texas State Highway 27, Texas State Highway 16, FM 689 and Texas State Highway 173. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Guadalupe River, Quinlan Creek, Town Creek and Camp Meeting Creek.
  • Public water: City of Kerrville, surface water.
  • Electric: City of Kerrville municipal electric system.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring in Kerr County and Kerrville?

Kerrville is an incorporated city and the county seat of Kerr County, with a Census Bureau Vintage 2024 estimate of 25,141 residents. We take water and sewer lines, gas lines, electric conduit and fiber beneath routes such as Texas State Highway 27, Memorial Boulevard and Loop 534. The route and the line owner matter, especially where a service connection meets the City of Kerrville water system or electric system.

Our main office is in Yukon, Oklahoma, and Kerrville work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, and we have done directional boring since 1982; Kerr County crossings still call for site specific planning. We handle 3/4 inch service lines through 48 inch casing, with bore lengths from 10 feet to 5,000 feet, for routes such as those beneath Interstate 10 or the Guadalupe River.

Directional drill rig and crew working on a street beside a brick commercial building
Our drill and crew set up on a street beside a brick commercial building. Photos on this page are from our jobs in Oklahoma and Texas.

What does the Kerrville soil survey show about ground in Kerrville?

The USDA soil survey maps Kerrville soil across 30 percent of the city, with Krum soil covering 16 percent. Surface textures include silty clay at 33 percent and gravelly clay loam at 25 percent. About 40 inches down, bedrock is mapped across 47 percent of the area, while silty clay is mapped across 16 percent and sandy ground across 3 percent. The survey estimates average clay content at that depth at 38 percent. These are mapped soil patterns, not test borings, so a route near Memorial Boulevard still needs site specific planning.

USDA soil survey, inside the Kerrville city limitsWhat is mapped
Soil series mappedKerrville 30 percent, Krum 16 percent, Urban land (miscellaneous area) 11 percent, Nuvalde 9 percent and Eckrant 7 percent
Texture at the surfacesilty clay 33 percent, gravelly clay loam 25 percent and variable 11 percent
Texture about 40 inches downbedrock 47 percent, silty clay 16 percent and variable 11 percent
Engineering class about 40 inches downfat clay (CH) 20 percent, lean clay (CL) 17 percent and clean gravel (GP) 3 percent
Average clay content about 40 inches down38 percent
Bedrock mapped within 60 inches48 percent of the area (41 percent hard rock, 7 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils11 percent of the area
High corrosion risk for uncoated steel47 percent of the area
Mapped as urban land (disturbed fill)11 percent of the area

Bedrock is mapped within 60 inches across 48 percent of Kerrville, including hard bedrock across 41 percent and weathered bedrock across 7 percent. A typical mapped depth is 21 inches, so a bore may need slower rock drilling and close steering checks. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 11 percent of the city, relevant near the Guadalupe River. High steel corrosion risk is mapped across 47 percent, so the line owner should consider casing and tracer wire materials; Along Quinlan Creek, HDPE does not share the steel corrosion concern we consider when planning underground boring. The geologic map includes Cenozoic terrace deposits and Early Cretaceous sedimentary rock.

How do we drill Kerrville ground where bedrock is mapped?

Kerrville soil can combine clay with shallow bedrock, so we match the bit and drilling pace to the route. Near the Guadalupe River, we also plan the bore depth around the channel and the approach pits.

  1. Kerrville soil includes silty clay, which can cling to the reamer; we use staged reaming and plan the pull so the open hole is not left waiting.
  2. Where Kerrville bedrock is shallow, we slow the advance and select a bit for the material, checking depth and pitch as the bore moves.
  3. Near the gravelly Guadalupe River terraces, we keep the bore plan focused on hole stability and have the pipe ready before the final reaming pass.
  4. At a Kerrville street crossing, we track the drill head with a walkover locator, log depth and pitch, and pothole marked utilities before drilling near them.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What does a Kerrville bore have to cross near Interstate 10?

Interstate 10 runs 10.3 mapped roadway miles within Kerrville, alongside Texas State Highway 27, Texas State Highway 16 and other state routes. A bore beneath existing highway pavement is installed by boring or tunneling, not by opening the pavement. Memorial Boulevard is the city’s longest named street at 6.5 miles, followed by Loop 534 at 4.93 miles and Memorial Parkway at 4.89 miles. Main Street adds another route to check for buried lines, pavement and access for entry and exit pits.

CrossingTypeMapped extentWho has a say
Interstate 10Interstate10.3 roadway miles insideState highway office
Texas State Highway 27State highway12.2 roadway miles insideState highway office
Texas State Highway 16State highway6.2 roadway miles insideState highway office
FM 689State highway3.6 roadway miles insideState highway office
Texas State Highway 173State highway3.6 roadway miles insideState highway office
Loop 173State highway2.5 roadway miles insideState highway office
FM 1341State highway1.8 roadway miles insideState highway office
FM 738State highway1.2 roadway miles insideState highway office
Spur 100State highway1.2 roadway miles insideState highway office
FM 1338State highway1.1 roadway miles insideState highway office
RM 783State highway0.9 roadway miles insideState highway office
FM 394State highway0.8 roadway miles insideState highway office
FM 2771State highway0.5 roadway miles insideState highway office
Texas State Highway 39Highway nearby1.5 miles outsideState highway office
Swipe the table sideways to see every column.

No railroad is mapped inside Kerrville or within one mile outside its limits, and no street and rail crossings are mapped in the city. If a proposed route does reach a railroad, its owner must agree to the crossing; that agreement sets casing, depth and flagging. The Guadalupe River runs 6.96 channel miles through Kerrville, and 54 street crossings of named streams are mapped. Quinlan Creek and Town Creek are also mapped in the city, so a crossing plan must account for the channel and check for federal jurisdiction during planning.

Whose permission does a Kerrville bore in Kerr County need?

Kerrville’s city streets belong to the city, while Interstate 10, Texas State Highway 27 and the farm to market routes fall under TxDOT right of way rules. For those highways, the line owner, not the drilling contractor, files the utility permit through TxDOT’s online RULIS system, reviewed by the TxDOT San Antonio District. We prepare the bore plan and profile for the owner’s application and work under its permit. At Interstate 10, we follow TxDOT rules by boring or tunneling beneath existing highway pavement in Kerrville. Electric and communication lines need 60 inches of cover at crossings and 48 inches along the right of way; water lines need 60 inches at crossings and 36 inches along it. Pressurized sewer needs 60 inches at a crossing. The Guadalupe River and other water crossings are checked for U.S. Army Corps of Engineers jurisdiction during planning. A railroad route would also require an agreement from the railroad owner.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities are near the City of Kerrville system?

The City of Kerrville public water system uses surface water and reports 14,200 service connections serving 30,530 people. The city also owns its municipal electric system, with 23,927 customers reported to EIA. Those systems make line identification important near Memorial Boulevard and the Guadalupe River. Before an electric conduit bore, we confirm the line owner for the address rather than assume the city system serves every route.

Line ownerWhat it isSourceSize
City of KerrvillePublic water systemSurface water14,200 connections, 30,530 people served
City of Kerrville municipal electric systemCity owned electric systemReports to the U.S. Energy Information Administration23,927 customers reported
Kerrville Public Utility Board, Bandera Electric Cooperative, Central Texas Electric Cooperative and Pedernales Electric CooperativeElectric utilities reporting service in Kerr CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

American Community Survey 2019 to 2023 five year estimates put Kerrville’s median housing year at 1983. The estimates show 17 percent of housing built before 1960, 57 percent from 1960 to 1999 and 26 percent in 2000 or later. Replacement work along Main Street may involve older buried lines, while newer development can call for service extensions. We hydrovac pothole marked utilities on the bore path before drilling near them; at a water or electric crossing, the exposed line confirms its position and depth before the drill approaches.

Coiled black HDPE conduit fitted with a pulling grip staged on a lawn along a completed bore path
Coiled HDPE conduit fitted with a pulling grip, staged on a lawn along a finished bore path.

How far is Kerrville from Center Point and other nearby places?

Kerrville is the county seat of Kerr County, Texas, at an elevation of 1,630 feet and covers 22.92 square miles. ZIP code 78028 serves Kerrville, and we use that local identifier when coordinating underground work in Kerr County. Nearby Ingram is 6.9 miles northwest, and Center Point is 8.7 miles southeast; Comfort is 14.3 miles east. Trinity takes work across Texas, including Kerrville and nearby rural routes. The Yukon, Oklahoma main office is 492 road miles away, a 9.6 hour drive, which can affect mobilization for a bore near Kerrville Municipal Airport or along Texas State Highway 16.

Places near Kerrville

What would we bore near the Guadalupe River in Kerrville?

  • Highway crossing: A bore beneath Interstate 10 avoids opening the pavement, with the route planned to meet the highway permit and cover requirements.
  • Street service: Water or sewer under Memorial Boulevard can connect a building without cutting the traveled surface, with entry pits set off the pavement.
  • Fiber route: Conduit beneath Loop 534 can carry fiber across a road or driveway while keeping the paved crossing intact.
  • Creek crossing: A line beneath the Guadalupe River needs a planned depth below the channel and a jurisdiction check during planning.
  • Water service: A connection near the City of Kerrville water system starts with locating and exposing existing lines along the proposed path.
  • Park route: A bore near Louise Hays Park can carry water, sewer or conduit beneath a path or paved access without an open cut.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What drives the price of directional boring near Memorial Boulevard in Kerrville?

For a Kerrville quote, send the address or map pin, what will go underground, the pipe or conduit size and the footage; a sketch or plans help. A route on Memorial Boulevard or near Interstate 10 also helps show pavement, access and the likely crossings. That detail lets us review the actual bore path instead of treating every street as the same job.

Ground affects the work: Kerrville’s mapped shallow bedrock can mean slower drilling, while clay can build up on the reamer. Crossings matter too, from pavement on Interstate 10 to drainage or the Guadalupe River, as do exposed utilities, pits, excavator time and sand backfill. Pipe size and bore length change the equipment and reaming plan. Logistics also enter the price because Kerrville is 492 road miles from the Yukon office. High profile or emergency work near Guadalupe River can add planning needs, so we account for the crossing before boring.

Questions people ask about boring in Kerrville

Does Trinity take directional boring jobs in Kerr County, and who staffs Kerrville work?

Yes. We take directional boring work in Kerr County, with our own crews and partner contractor crews working from satellite yards we have vetted. You work with Trinity from the first call through the bore log, whichever crew is at the site. For a route near Memorial Boulevard, the address and scope help us plan the right equipment and access.

Can a replacement bore near Loop 534 work around older Kerrville utilities?

Yes. The American Community Survey 2019 to 2023 estimates put Kerrville’s median housing year at 1983, with 17 percent of homes built before 1960. Replacement routes near Loop 534 may meet older buried lines, so we use Texas811 marks and hydrovac potholing to expose marked utilities before drilling near them.

Do Kerrville bore pits near the Guadalupe River have groundwater or flood concerns?

The USDA soil survey does not map seasonal water tables within 60 inches in Kerrville, but it maps flood prone soils across 11 percent of the city. Near the Guadalupe River, we plan pit locations and bore depth around the channel. The river crossing is also checked for U.S. Army Corps of Engineers jurisdiction during planning.

Does Kerrville soil corrode steel, and what pipe can go in a bore?

The USDA soil survey maps high steel corrosion risk across 47 percent of Kerrville, so the line owner should consider casing and tracer wire materials. Along Quinlan Creek, HDPE does not share the steel corrosion concern we consider when planning underground boring. The suitable pipe depends on the line and design, including whether a route under Memorial Boulevard calls for casing.

What ground is under Kerrville soil about 40 inches down?

The USDA soil survey maps bedrock across 47 percent of Kerrville at about 40 inches, with silty clay mapped across 16 percent and sandy ground across 3 percent. Average clay content at that depth is 38 percent. These are mapped patterns, not test borings, so the exact route still needs review before choosing the drilling approach.

How much of Kerrville has bedrock mapped within five feet, and is it hard?

Bedrock is mapped within 60 inches across 48 percent of Kerrville. Hard bedrock is mapped across 41 percent and weathered bedrock across 7 percent, so a route may shift from soil drilling to slower rock drilling. Near Texas State Highway 27, the actual material and depth must guide the bore plan.

Does Trinity cover Ingram and rural sites outside Kerrville too?

We take work across Texas, including Kerrville, Ingram and rural routes outside the city limits. Ingram is 6.9 miles northwest of Kerrville, but each address has its own access, ground and crossing conditions. A route near Texas State Highway 16 or the Guadalupe River needs those details in the scope.

How early should I request Texas811 marks for a bore near Memorial Boulevard in Kerrville?

Count back at least two working days from the planned start near Memorial Boulevard, excluding Saturdays, Sundays and legal holidays. The request cannot be more than 14 days ahead, and a start more than 14 days after the original notice needs a new request. If marks wear off or move, have Texas811 refresh them before work continues.

What affects the cost of directional boring under Interstate 10 in Kerrville?

The route, footage, pipe or conduit size, Kerrville soil and rock, exposed utilities, pavement, creek crossings, pits and excavator time all affect the price. Interstate 10 work also brings highway planning and cover requirements into the scope. Mobilization matters because the Yukon main office is 492 road miles from Kerrville; there is no flat price that fits every crossing.

Where the Kerrville facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Kerrville

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Kerrville, Texas

Type the address of your job in Kerrville. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Kerrville

All counties: Texas county list.