Harper Texas Directional Boring: Purves Clay, US 290 and Pedernales River
Quick Answer: At Harper, we take directional boring, also called horizontal directional drilling (HDD), for routes beneath US 290 and the community’s roads. Harper is 481 road miles from our Yukon, Oklahoma main office, and Wendel Road’s 9.5 miles inside the mapped community make route length a planning detail. USDA maps show Purves soils across 43 percent of Harper; clay can cling to a reamer, so staged reaming and fluid control matter.
Harper bores at a glance
- Unincorporated community in Gillespie County, Texas. Population 1,332 (2020 Census count).
- Road distance from our Yukon, Oklahoma main office: 481 miles, about 9.5 hours of driving.
- Ground: Purves soil is mapped on 43 percent of the area, with bedrock about 40 inches down.
- Rock: bedrock is mapped within 60 inches on 93 percent of the area.
- Highways inside the boundary: US 290, RM 783 and FM 2093. State permit office: TxDOT Austin District.
- Railroad track inside the boundary: none mapped.
- Named streams inside the boundary: Pedernales River, Klein Branch, Banta Branch and Stevens Creek.
- Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
- Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
- Phone answered 24 hours a day: (405) 409-7423
Who does directional boring near US 290 in Harper?
The Census Bureau counted 1,332 people in Harper in the 2020 Census. We install water, sewer, gas, electric conduit and fiber, including routes beneath US 290 or along Wendel Road. As an unincorporated community in Gillespie County, Harper has no city government, so road and permit responsibilities rest with the county or state.
Our main office is in Yukon, Oklahoma, and Harper work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. We are a family business that started in 1965, and we have done directional boring since 1982. For a route along Wendel Road or beneath US 290, our equipment handles 3/4 inch service lines through 48 inch casing and bores from 10 feet to 5,000 feet.

What does the soil survey show about Purves soil in Harper?
The USDA soil survey maps Purves soils across 43 percent of Harper and Tarrant soils across 31 percent. Surface textures are clay across 52 percent and very cobbly clay across 31 percent. At about 40 inches below the surface, bedrock is the mapped texture across 91 percent of the area; the average clay content at that depth is 27 percent. With clay as Harper’s surface soil texture, we plan for no mapped sandy area at that depth during a bore. These are soil survey patterns, not test borings, so a planned route near Kramer Road still needs site specific evaluation.
| USDA soil survey, inside the Harper mapped community boundary | What is mapped |
|---|---|
| Soil series mapped | Purves 43 percent, Tarrant 31 percent, Tarpley 7 percent, Doss 7 percent and Boerne 4 percent |
| Texture at the surface | clay 52 percent, very cobbly clay 31 percent and silty clay 8 percent |
| Texture about 40 inches down | bedrock 91 percent, loam 4 percent and silty clay loam 3 percent |
| Engineering class about 40 inches down | lean clay (CL) 8 percent |
| Average clay content about 40 inches down | 27 percent |
| Bedrock mapped within 60 inches | 93 percent of the area (83 percent hard rock, 10 percent weathered rock) |
| Seasonal water table within 60 inches | 0 percent of the area |
| Flood prone soils | 6 percent of the area |
| High corrosion risk for uncoated steel | 93 percent of the area |
Bedrock is mapped within 60 inches across 93 percent of Harper, including hard bedrock across 83 percent and weathered bedrock across 10 percent. The USDA map lists Edwards Limestone of Albian age, so a bore may move from clay into hard rock and need rock tooling. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 6 percent. High steel corrosion risk is mapped across 93 percent, a concern for uncoated casing or tracer wire near Wendel Road; the line owner selects materials.
How do crews handle bedrock in Harper?
Purves clay and mapped Edwards Limestone can make one Harper bore shift from sticky soil to hard rock. We plan the tooling and fluid around the route, then track the drill head as it advances near local roads and utilities.
- Purves soils have clay at the surface, so we manage fluid and ream in stages to limit sticky cuttings and avoid leaving an open hole longer than needed.
- With bedrock mapped within 60 inches across 93 percent of Harper, we check the route for rock and select tooling suited to the ground near US 290.
- Before drilling near a marked line on Wendel Road, we hydrovac pothole to expose it; paint shows position, not depth.
- We track the drill head from the surface and log depth and pitch as a bore passes near the Pedernales River or a mapped street crossing.

What might a bore cross near the Pedernales River in Harper?
US 290, RM 783 and FM 2093 run inside Harper, with mapped roadway lengths of 6.9 miles, 10.1 miles and 5.7 miles respectively. Wendel Road is the longest named street at 9.5 miles, followed by Fiedler Road at 6.04 miles and Lange Road at 5.79 miles. A route under one of these roads needs a plan for its right of way and pavement. Existing highway pavement is bored or tunneled rather than cut open.
| Crossing | Type | Mapped extent | Who has a say |
|---|---|---|---|
| US 290 | US highway | 6.9 roadway miles inside | State highway office |
| RM 783 | State highway | 10.1 roadway miles inside | State highway office |
| FM 2093 | State highway | 5.7 roadway miles inside | State highway office |
| Pedernales River | Stream | 9.52 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Klein Branch | Stream | 7.95 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Banta Branch | Stream | 5.25 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Stevens Creek | Stream | 4.28 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Falls Prong | Stream | 3.42 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Pecan Creek | Stream | 2.46 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Indian Creek | Stream | 2.29 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Rogers Creek | Stream | 2.24 channel miles inside | Checked for Corps of Engineers jurisdiction |
| Nott Branch | Stream nearby | Along the boundary | Checked for Corps of Engineers jurisdiction |
| Threadgill Creek | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
| Brushy Branch | Stream nearby | 0.2 miles outside | Checked for Corps of Engineers jurisdiction |
No railroad is mapped inside Harper or within one mile outside the community, and no street and rail crossing is mapped. The Pedernales River runs 9.52 channel miles inside Harper; Klein Branch runs 7.95 miles, and Banta Branch runs 5.25 miles. Public records map 32 street crossings of named streams, so a route near one needs careful alignment. For boring near the Pedernales River, we plan around the stream setting; no lakes or ponds are mapped within one mile.
Who approves a bore on roads in Gillespie County in Harper?
Harper is an unincorporated community, so its streets do not belong to a city government; county or state authority depends on the road. For a bore in the US 290, RM 783 or FM 2093 right of way, electric and communication lines need at least 60 inches of cover below the lowest crossed grade, and 48 inches along the right of way. Water lines need 60 inches at crossings and 36 inches along it; pressurized sewer needs 60 inches at crossings. TxDOT’s Austin District reviews the permit. The line owner files in RULIS, and we prepare the bore plan and profile for that filing. Any river or creek route, including the Pedernales River, is checked for Corps jurisdiction during planning.
Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.
Which utilities should we check in Gillespie County in Harper?
EPA drinking water records do not match a provider to Harper, and no system carries the community’s name. Confirm the water provider for the specific address with the county or local water district before planning a bore near Wendel Road. AEP Texas North, Central Texas Electric Cooperative and Pedernales Electric Cooperative report electric service in Gillespie County, but the line owner must be confirmed for the address. We can hydrovac expose marked water and electric lines before drilling near them.
| Line owner | What it is | Source | Size |
|---|---|---|---|
| AEP Texas North, Central Texas Electric Cooperative and Pedernales Electric Cooperative | Electric utilities reporting service in Gillespie County | EIA Form 861 | Confirm the line owner by address |
Harper’s median housing year is 1990; for underground planning along US 290, we treat it as area housing context. Harper’s housing estimates in Gillespie County put 17 percent before 1960, 54 percent from 1960 to 1999, and 29 percent in 2000 or later; we use these figures as planning context. That mix can mean replacement work as well as new services along roads such as Lange Road. Before the drill approaches a marked utility, we pothole to check its depth; surface paint alone does not show how deep it lies.

Do you cover Harper and nearby Ingram?
Harper is an unincorporated community in Gillespie County at an elevation of 2,182 feet, covering 56.57 square miles. ZIP code 78631 serves the area. Ingram is 13.2 miles south, Kerrville is 17.9 miles southeast, and Fredericksburg, the county seat, is 23.7 miles east. Kerrville is the nearest larger city. From our Yukon yard, Harper is 481 road miles away and about a 9.5 hour drive, so distance is part of planning work near US 290.
Places near Harper
- Directional boring in Ingram: 13.2 miles south
- Directional boring in Kerrville: 17.9 miles southeast
- Directional boring in Fredericksburg: 23.7 miles east
- Directional boring in Center Point: 26.6 miles southeast
- Directional boring in Comfort: 29.9 miles southeast
Which jobs call for a bore along Wendel Road in Harper?
- Highway crossing: A bore beneath US 290 can carry water or electric conduit without cutting the existing pavement.
- Water service: A line along Wendel Road needs its provider confirmed for the address before we plan the route.
- Fiber route: Conduit along Lange Road can connect a service while the bore avoids open cuts across the road.
- Creek crossing: A route under the Pedernales River needs a profile that accounts for the channel and a jurisdiction check during planning.
- Electric conduit: Near Kramer Road, we expose marked utilities before drilling close to the line owner’s route.
- Acreage service: A long bore near Fiedler Road can carry water, sewer or conduit between separated service points.
More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.
What should I send for a Harper quote near Kramer Road?
For work near Kramer Road, start with the address or a map pin, then tell us what goes underground. Give the pipe or conduit size and the footage, such as a service route crossing US 290. A sketch or plans help us see the route, nearby utilities and any creek crossing before we scope the bore.
A bore near Kramer Road is simpler to plan when the route is clear, access is open and no pavement, utility or creek crossing complicates it. Price changes with length, pipe size, soil and rock, exposed utilities, pavement, drainage crossings, pits, excavator time and backfill. Harper’s Purves clay and limestone can affect drilling, while a US 290 crossing adds highway requirements. At 481 road miles from Yukon, mobilization also matters.
Questions people ask about boring in Harper
Does Trinity take directional boring jobs in Harper, Gillespie County, and who staffs them?
Yes. We take directional boring work in Harper, Gillespie County, with our own crews and partner contractor crews operating from satellite yards. For RM 783 planning, we coordinate with Trinity through the bore log, whichever crew is on site. For a route near US 290, we plan the crew and equipment around the ground and the line being installed.
What ground should I expect for a Harper bore in Purves soil?
The USDA soil survey maps Purves soils across 43 percent of Harper, with clay and very cobbly clay common at the surface. At about 40 inches down, bedrock is the mapped texture across 91 percent of the area. Those are mapped patterns, not test borings, so the route near Lange Road still needs site specific planning.
Is there rock on a Harper bore route, and how much bedrock is mapped?
Rock is widely mapped in Harper: bedrock is mapped within 60 inches across 93 percent of the area. Hard bedrock covers 83 percent and weathered bedrock 10 percent. The Edwards Limestone map unit is another reason to check the route before choosing tooling near US 290.
Who approves a Harper bore under US 290, and which state office reviews it?
TxDOT reviews a US 290 right of way utility permit through its Austin District. The utility owner submits the application in RULIS, while we provide the bore plan and profile and work under the owner’s permit. The permitted depth can depend on the line type and crossing conditions.
Can a utility line be bored under the Pedernales River in Harper?
A bore under the Pedernales River can be considered after the route is planned and the crossing is checked for U.S. Army Corps of Engineers jurisdiction. The river runs 9.52 channel miles inside Harper. Its banks and channel affect alignment and depth, so the planned profile needs to fit that specific crossing.
Which electric companies report service in Gillespie County for a Harper conduit bore?
AEP Texas North, Central Texas Electric Cooperative and Pedernales Electric Cooperative report electric service in Gillespie County. That does not identify the owner at every Harper address, so confirm the line owner and conduit specifications for the specific route before planning a bore near Wendel Road.
Can I reach Trinity after hours about an urgent bore near Lange Road in Harper?
Yes. Call (405) 409-7423; a person answers 24 hours a day. If the urgent work is near Lange Road, tell us the location and what line needs to go in so we can discuss the job scope and response needs.
How much 811 notice is needed before a Harper bore on Wendel Road?
For a bore on Wendel Road, Texas811 requires a locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If a Harper start slips more than 14 days past the original notice, we make a new request through the TxDOT Austin District. Before resuming a crossing on Wendel Road, we refresh any marks that wear off or move through Texas811.
What affects the price of a Harper directional bore under US 290?
The route and scope determine the price, not the highway name alone. Length, pipe or conduit size, Purves clay or limestone, utilities to expose, pavement, creek crossings, pits and equipment time all matter. A US 290 right of way crossing adds permit planning, and Harper’s distance from Yukon affects mobilization.
Where the Harper facts on this page come from
- USDA Natural Resources Conservation Service, Soil Data Access: soil survey map units inside Harper
- U.S. Census Bureau, TIGER/Line 2024: Harper boundary, roads, rail lines and streams
- U.S. Census Bureau, 2020 Census: Harper population count
- U.S. Census Bureau, American Community Survey 2019 to 2023: Harper housing units and year built
- Macrostrat geologic map compilation: map units under Harper
- U.S. Energy Information Administration, Form EIA 861: electric utilities serving Gillespie County
- U.S. Geological Survey, Elevation Point Query Service: Harper elevation
- OpenStreetMap road network through the OSRM router: road miles from Yukon, Oklahoma to Harper
- Texas Utilities Code Chapter 251, Underground Facility Damage Prevention and Safety
- TxDOT Utility Accommodation Rules, 43 Tex. Admin. Code 21.40: underground utilities
- Texas Department of Transportation: Right of Way Utility and Leasing Information System (RULIS) utility permits
Get a Quote for a Bore in Harper
Send the address, what is going in, the size and the footage.
Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com
Free Bore Planner
Plan Your Bore in Harper, Texas
Type the address of your job in Harper. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.
Talk to the crew that does the work
Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.
Answered by a person, not a call center.
Would rather not call? Send the details and we will come back with a written quote.
County and State Pages for Harper
Same county: Stonewall. All counties: Texas county list.