Knippa Texas Directional Boring: Clay, Frio River, Union Pacific Track

Quick Answer: Trinity Boring Solutions handles directional boring, also called horizontal directional drilling (HDD), in Knippa for routes near US 90 without opening the road surface. Knippa is 550 road miles from our Yukon, Oklahoma main office, and the Union Pacific Del Rio Subdivision is a local crossing to plan around. The USDA soil survey maps Knippa clay across 42 percent of the area, so sticky ground can build up on a reamer and needs staged passes. The Frio River and Avenue G are useful details to include when describing a route.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Knippa bores at a glance

  • Unincorporated community in Uvalde County, Texas. Population 606 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 550 miles, about 10.7 hours of driving.
  • Ground: Knippa soil is mapped on 46 percent of the area, with silty clay loam about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 4 percent of the area.
  • Highways inside the boundary: US 90 and FM 1049. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: Union Pacific, with 3 mapped street and rail crossings.
  • Named streams inside the boundary: Frio River.
  • Public water: Knippa Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Does Trinity handle directional boring near Avenue G in Knippa?

Trinity Boring Solutions takes directional boring work in Knippa, where a route near Avenue G must account for Knippa Water Supply Corporation lines and confirm the electric line owner. A 2020 Census count puts the community at 606 people. Water, sewer, gas, electric conduit and fiber lines can be routed along streets such as Main Street or across US 90, with existing utilities identified before drilling.

Our main office is in Yukon, Oklahoma, and Knippa work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our longest bore reached roughly 4,100 feet with 48 inch pipe under the Arkansas River in Tulsa. For a proposed Knippa service line near Avenue G, that is a different scale from the short route details we would first need to plan the work. Trinity is a family business started in 1965, with directional boring work dating to 1982.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What does the soil survey show beneath Knippa?

The USDA soil survey maps Knippa soil as the leading soil series in Knippa, covering 46 percent of the area. Knippa clay, 0 to 1 percent slopes, accounts for 42 percent of mapped ground, while Uvalde soil covers 28 percent. At about 40 inches below the surface, silty clay loam is mapped under 48 percent of the area, and clay loam under 28 percent. Surface clay accounts for 49 percent. These are mapped patterns, not test borings, so a proposed bore near Main Street still needs site specific planning.

USDA soil survey, inside the Knippa mapped community boundaryWhat is mapped
Soil series mappedKnippa 46 percent, Uvalde 28 percent, Atco 10 percent and Ingram 4 percent
Texture at the surfaceclay 49 percent, clay loam 28 percent and loam 12 percent
Texture about 40 inches downsilty clay loam 48 percent, clay loam 28 percent and sandy clay loam 10 percent
Engineering class about 40 inches downlean clay (CL) 88 percent
Average clay content about 40 inches down34 percent
Bedrock mapped within 60 inches4 percent of the area (4 percent hard rock, 0 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel83 percent of the area

The USDA soil survey maps bedrock within 60 inches in 4 percent of Knippa, so bedrock is not mapped in the top five feet across most mapped ground; that does not rule out rock deeper down. Seasonal water table is not mapped within 60 inches, while flood prone soils cover 9 percent, a reason to plan carefully near the Frio River. High steel corrosion risk is mapped across 83 percent, so the line owner should consider steel casing and tracer wire materials. The geologic map identifies Cenozoic Alluvium, undivided, and Late Cretaceous sedimentary units; alluvial gravel, sand, silt and clay can vary along drainage routes.

How do we drill Knippa silty clay loam?

We plan a Knippa bore around the mapped silty clay loam and clay, not a guessed soil profile. Near the Frio River, the route and fluid plan also account for drainage and the risk of disturbing the channel.

  1. We use a thinner drilling fluid and polymer in Knippa clay, then ream in stages so sticky ground is less likely to ball up on the reamer.
  2. Where the silty clay loam is heavy, we watch fluid returns near Avenue G and keep pressure controlled to avoid lifting pavement.
  3. We hydrovac expose marked utilities near Main Street before drilling close; locator paint shows where a line runs, not how deep it sits.
  4. At a Frio River crossing, we track the drill head from the surface, log depth and pitch, and plan the bore to stay beneath the channel.
Walkover locator at the edge of the wetland on a directional bore at the Cimarron site in Logan County, Oklahoma
Walkover locator at the edge of a wetland on a directional bore in Logan County, Oklahoma.

Where might a Knippa line pass under US 90?

A Knippa bore may need to pass beneath US 90 or FM 1049, both mapped inside the community boundary. US 90 has 1.8 roadway miles inside the boundary, and FM 1049 has 7.1. Avenue G is the longest named street at 1.5 miles, followed by Main Street at 0.84 miles and Private Road 3110 at 0.58 miles. Boring can keep pavement and driveways uncut, but the proposed entry and exit pits still need room beside the route.

CrossingTypeMapped extentWho has a say
US 90US highway1.8 roadway miles insideState highway office
FM 1049State highway7.1 roadway miles insideState highway office
Union PacificRailroad2.68 track miles insideThe railroad
Frio RiverStream6.13 channel miles insideChecked for Corps of Engineers jurisdiction
Dry Frio RiverStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Dinner CreekStream nearby0.5 miles outsideChecked for Corps of Engineers jurisdiction
Elm DrawStream nearby1 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

Union Pacific owns 2.68 track miles inside Knippa on the Del Rio Subdivision, and the mapped community has 3 street and rail crossings. A route beneath those tracks needs the railroad owner’s crossing agreement. The Frio River runs 6.13 channel miles inside the boundary, with 3 mapped street crossings of named streams. Around Knippa, we have no mapped lakes or ponds within one mile to account for when planning a bore. A river crossing needs a check for U.S. Army Corps of Engineers jurisdiction during planning.

Whose permission does a Knippa bore in Uvalde County need?

For a Knippa bore in Uvalde County, the road owner determines the applicable approval: county roads are under county authority, while US 90, FM 1049 and other state highway rights of way go through TxDOT. The utility owner, not the driller, files a TxDOT utility application in RULIS, and the TxDOT San Antonio District reviews it; we prepare the bore plan and profile for that filing. TxDOT cover rules include 60 inches below the lowest grade at highway crossings for electric and communication lines and water lines, and 60 inches for pressurized sewer. A Union Pacific track crossing needs the railroad owner’s agreement. A Frio River crossing is checked for federal jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve Knippa, including Knippa Water Supply Corporation?

Knippa Water Supply Corporation runs the local public water system, which draws from groundwater wells and serves 933 people through 311 service connections. Electric service reported in Uvalde County includes AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric Cooperative. Those county listings do not identify the provider at every Avenue G address, so we confirm the line owner before planning an electric conduit bore.

Line ownerWhat it isSourceSize
Knippa Water Supply CorporationPublic water systemGroundwater wells311 connections, 933 people served
AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Uvalde CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Knippa’s median housing year at 1993; 17 percent of homes were built before 1960, 74 percent from 1960 to 1999 and 9 percent in 2000 or later. A replacement bore along Main Street may encounter existing service lines, while a newer connection may need a different route. Before drilling near a marked line, we use hydrovac potholing to expose it; paint shows position, not depth.

Exposed underground utility line in a hand dug potholing pit before a directional bore in Oklahoma
An existing utility line exposed in a pothole before a directional bore in Oklahoma.

Do you cover Knippa near Uvalde soil?

Knippa is in Uvalde County, at an elevation of 990 feet, and covers 5.11 square miles within its mapped community boundary. ZIP code 78870 serves the area. Sabinal is 9.8 miles east, and Uvalde, the county seat and nearest larger city, is 10.7 miles southwest. Uvalde Estates is 15.5 miles southwest, D’Hanis is 21.9 miles east, and Utopia is 23.2 miles north. Knippa is 550 road miles and a 10.7 hour drive from our Yukon, Oklahoma main office, which can affect mobilization for a bore near Uvalde soil.

Places near Knippa

What boring work comes up near Private Road 3110 in Knippa?

  • Highway crossing: A bore beneath US 90 keeps the pavement uncut, with the entry and exit pits set outside the travel lanes.
  • Street service: A water or sewer route near Main Street can use a bore rather than opening the pavement along the street.
  • Water connection: A proposed service near Knippa Water Supply Corporation lines needs the existing water route identified before drilling.
  • Rail crossing: A route beneath the Union Pacific Del Rio Subdivision needs the railroad owner’s agreement and crossing conditions in the plan.
  • Creek crossing: A Frio River bore is planned below the channel, with jurisdiction checked during the crossing review.
  • Fiber conduit: A conduit route near Private Road 3110 needs marked utilities exposed before the drill approaches them.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

How do I get a quote for a Knippa bore near the Frio River?

Start with a map pin near the Frio River or a street such as Avenue G; the exact location shows whether the route approaches water, US 90 or Union Pacific track. For a Knippa bore, tell us what will go underground, along with the pipe or conduit size and footage. A sketch or plans help us assess the entry and exit pits and prepare a useful quote.

A straightforward service route along Avenue G with clear access and no mapped crossing may be simpler to plan than a route under US 90 or Union Pacific track. The price reflects bore length, pipe or conduit size, Knippa clay and possible rock, utilities to expose, pavement, creek crossings, pits, excavator time and sand backfill. Yukon is 550 road miles away, so we factor that distance into mobilization for Knippa work. High profile or emergency timing can add planning demands.

Questions people ask about boring in Knippa

Does Trinity take directional boring work in Uvalde County Knippa, and who staffs it?

Yes. Trinity takes directional boring work in Knippa, Uvalde County, using our own crews and satellite yards run by partner drilling contractors we have vetted. From your first call through the bore log, we stay involved in Knippa work regardless of which crew is on site. A proposed route near Avenue G still needs its lines located before drilling.

Who controls Private Road 3110 in Knippa, and can a bore avoid cutting it?

Knippa is an unincorporated community with no city government, so its streets are under county authority rather than a city. A bore near Private Road 3110 can pass beneath the road without cutting its surface, subject to the route and required approvals. The mapped community has 29.01 public road centerline miles, so the exact road owner and location matter.

How old are homes and buried lines near Main Street in Knippa?

The American Community Survey 2019 to 2023 estimates put Knippa’s median housing year at 1993, with 17 percent of homes built before 1960. That age can mean a replacement route near Main Street must account for existing lines that are not shown by housing data. We expose marked utilities with hydrovac before drilling near them.

Does Knippa soil corrode steel, and what pipe should a Knippa bore use?

The USDA soil survey maps high steel corrosion risk across 83 percent of Knippa. The line owner should weigh that concern when choosing steel casing or tracer wire materials. HDPE is not affected by soil corrosion, but the right pipe depends on the line and project near the Frio River or another route feature.

What ground does a bore pass through in Knippa soil near Knippa?

The USDA soil survey maps Knippa soil across 46 percent of the area, with silty clay loam under 48 percent at about 40 inches below the surface. Sticky clay can load onto a reamer, so staged reaming and a suitable fluid plan matter. These mapped patterns are not test borings for a route near US 90.

Will a Knippa bore hit rock near the Frio River?

It may, but the USDA soil survey maps bedrock within 60 inches in 4 percent of Knippa, so shallow bedrock is not mapped across most of the area. The geologic map identifies Cenozoic Alluvium, undivided, and Late Cretaceous sedimentary units. A site near the Frio River still needs a route plan that allows for changing ground.

How far is Knippa from Yukon, and does Uvalde soil change the job?

Knippa is 550 road miles and a 10.7 hour drive from our Yukon, Oklahoma main office, so mobilization is part of planning a bore near Uvalde soil. The mapped area includes clay and silty clay loam, which can affect reaming and fluid choices. The address, route length and crossings help us assess the work.

How much 811 notice does a bore near Avenue G in Knippa need?

For a bore near Avenue G, submit a Texas811 locate request at least 48 hours before excavation, excluding Saturdays, Sundays and legal holidays; Texas811 describes that as two working days. The request cannot be earlier than 14 days before work. If the start slips more than 14 days past the original notice, make a new request, and refresh worn or moved marks through Texas811 before continuing.

What affects the cost of directional boring under US 90 in Knippa?

The route and scope drive the price, not US 90 by itself. Length, pipe or conduit size, Knippa clay or rock, marked utilities to expose, pavement, a Frio River crossing, pits and equipment time all matter. A route beneath the highway may need more planning than an accessible service run, and mobilization reflects the distance from Yukon.

Where the Knippa facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Knippa

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Knippa, Texas

Type the address of your job in Knippa. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page