trinityboringsolutions.com

Utopia Texas Directional Boring: Pratley Clay, RM 187 And Sabinal River

Quick Answer: Can we get a line beneath RM 187 or the Sabinal River without cutting the surface? Yes, Trinity Boring Solutions does directional boring, also called horizontal directional drilling (HDD), in Utopia, Texas, for those crossings. Utopia is 521 road miles from our Yukon, Oklahoma main office, and Chaney Lane is one local route to consider. Pratley clay is mapped across 20 percent of the community, so sticky clay can call for staged reaming and careful fluid control.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Utopia bores at a glance

  • Unincorporated community in Uvalde County, Texas. Population 225 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 521 miles, about 10.6 hours of driving.
  • Ground: Pratley soil is mapped on 20 percent of the area, with bedrock about 40 inches down.
  • Rock: bedrock is mapped within 60 inches on 61 percent of the area.
  • Highways inside the boundary: RM 187 and RM 1050. State permit office: TxDOT San Antonio District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Sabinal River and Little Creek.
  • Public water: Utopia Water Supply Corporation, groundwater wells.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who can I call for directional boring under RM 187 in Utopia?

Trinity Boring Solutions takes directional boring work in Utopia, Uvalde County, including service runs near RM 187. Can we get a line beneath RM 187 or the Sabinal River without cutting the surface? Yes, we can plan a bore for water, sewer, gas, electric conduit or fiber along streets such as Lee Street. The Census Bureau counted 225 people in Utopia in the 2020 Census.

Our main office is in Yukon, Oklahoma, and Utopia work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. Our family business started in 1965, with directional boring added in 1982; our range from 3/4 inch service lines to 48 inch casing can suit a small Lee Street service or a larger RM 187 crossing.

Ditch Witch JT922 compact directional drill beside the Trinity Boring Solutions truck at NE 24th Street in Oklahoma City
Our Ditch Witch JT922 compact directional drill beside the Trinity truck on a sleeve bore at NE 24th Street in Oklahoma City. Photos on this page are from our jobs in Oklahoma and Texas.

How does Pratley soil affect a directional bore in Utopia?

Pratley clay and Kavett clay are prominent mapped soils for a bore in Utopia, at 20 percent and 19 percent of the community area. The USDA soil survey also maps Castroville clay loam at 17 percent and Topia clay at 15 percent. At about 40 inches below the surface, bedrock is mapped in 41 percent of the area, cemented material in 20 percent and clay in 18 percent. Clay covers 56 percent of the surface, while sandy ground is mapped across 1 percent. We treat mapped Pratley and Kavett soil patterns around Utopia as planning references, not test borings.

USDA soil survey, inside the Utopia mapped community boundaryWhat is mapped
Soil series mappedPratley 20 percent, Kavett 19 percent, Castroville 17 percent, Topia 15 percent and Valco 7 percent
Texture at the surfaceclay 56 percent, clay loam 24 percent and loam 10 percent
Texture about 40 inches downbedrock 41 percent, cemented material 20 percent and clay 18 percent
Engineering class about 40 inches downlean clay (CL) 31 percent and clayey sand (SC) 7 percent
Average clay content about 40 inches down31 percent
Bedrock mapped within 60 inches61 percent of the area (26 percent hard rock, 35 percent weathered rock)
Seasonal water table within 60 inches0 percent of the area
Flood prone soils9 percent of the area
High corrosion risk for uncoated steel78 percent of the area

The USDA soil survey maps bedrock within 60 inches across 61 percent of Utopia, including hard bedrock in 26 percent and weathered bedrock in 35 percent; typical bedrock depth is 28 inches. Glen Rose Formation limestone, dolostone and marl is mapped here and is Albian in age. Seasonal water tables are not mapped within 60 inches, while flood prone soils cover 9 percent. High steel corrosion risk is mapped across 78 percent, so the line owner should weigh casing and tracer wire materials; HDPE is another line material to consider.

How do crews handle Utopia bedrock and clay during a bore?

We plan Utopia bores around Pratley clay, shallow mapped bedrock and the route, then track the drill head from the surface and record depth and pitch as it advances.

  1. Pratley clay can cling to the reamer, so we use a thinner drilling fluid and staged reaming, with the Lee Street pipe ready before opening the final hole.
  2. With bedrock mapped at typical depths of 28 inches in Utopia, we watch depth and pitch closely as the drill moves between soil and rock.
  3. Before approaching a marked water line near Utopia Water Supply Corporation, we hydrovac pothole it to establish its depth rather than relying on paint alone.
  4. At a Sabinal River crossing, we plan the bore to pass below the channel and check whether the route falls under U.S. Army Corps of Engineers jurisdiction.
Rock bit on the drill rod at the front of a Vermeer D24x40 S3 with broken sandstone at the entry of a rock bore in Guthrie, OK
Rock bit on the drill rod with broken sandstone at the entry of a rock bore in Guthrie, Oklahoma.

What is in the way of a new line near Utopia’s Sabinal River?

RM 187 has 1.6 mapped roadway miles inside the Utopia community boundary, and RM 1050 has 0.1. Nearby routes through the community include Chaney Lane, with 1.34 miles, Lee Street, with 1.15 miles, and River View Drive, with 0.84 miles. A bore beneath one of these roads can leave its pavement uncut, with entry and exit pits placed off the traveled surface where the site allows.

CrossingTypeMapped extentWho has a say
RM 187State highway1.6 roadway miles insideState highway office
RM 1050State highway0.1 roadway miles insideState highway office
Sabinal RiverStream1.29 channel miles insideChecked for Corps of Engineers jurisdiction
Little CreekStream0.9 channel miles insideChecked for Corps of Engineers jurisdiction
West Sabinal RiverStream nearbyAlong the boundaryChecked for Corps of Engineers jurisdiction
Bravo CreekStream nearby0.4 miles outsideChecked for Corps of Engineers jurisdiction
Spring BranchStream nearby0.9 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Utopia or within 1 mile outside the community boundary, so a local rail crossing is not shown. The Sabinal River runs 1.29 channel miles inside the community, and Little Creek runs 0.9; public maps show 3 street crossings of named streams. We check routes near Sabinal River and Little Creek; no lakes or ponds are mapped within 1 mile. A Sabinal River crossing needs route planning around the channel and a check for federal water jurisdiction.

Who approves a bore near Utopia in Uvalde County?

Utopia has no city government, so its community streets are not approved by a city; RM 187 and RM 1050 are state highways, and Uvalde County is the local county. For work in state highway right of way, the utility owner applies for the TxDOT utility permit through RULIS, with review by the TxDOT San Antonio District; we prepare the bore plan and profile for the owner’s application. Under RM 187, electric or communication lines need 60 inches of cover at a crossing, while water lines need 60 inches and pressurized sewer lines need 60 inches. We confirm with TxDOT San Antonio District whether a different depth applies to Utopia crossings. A Sabinal River crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Whose lines are already buried near Utopia Water Supply Corporation?

Utopia Water Supply Corporation’s public system uses groundwater wells and reports 260 service connections serving 780 people. Before a bore near its lines, we use hydrovac potholing to expose marked utilities, because surface marks show position but not depth. AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric Cooperative report electric service in Uvalde County; the electric line owner needs confirmation for a conduit route along Chaney Lane.

Line ownerWhat it isSourceSize
Utopia Water Supply CorporationPublic water systemGroundwater wells260 connections, 780 people served
AEP Texas Central, Bandera Electric Cooperative, Medina Electric Cooperative and Rio Grande Electric CooperativeElectric utilities reporting service in Uvalde CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

The American Community Survey 2019 to 2023 five year estimates put Utopia’s median housing year at 1992; 29 percent of homes were built before 1960, 48 percent from 1960 to 1999 and 23 percent in 2000 or later. That mix can mean replacing older service lines as well as adding new ones near Lee Street. We pothole marked lines on the planned path before the drill approaches them.

Trinity Boring Solutions crew running a 2 inch conduit directional bore with airport hangars and a parked jet in the background in Oklahoma City
Our crew running a 2 inch conduit bore near the hangars at an Oklahoma City airport.

Do you cover Utopia, Sabinal and nearby rural sites?

Utopia is in Uvalde County at an elevation of 1,427 feet, with a mapped area of 2.95 square miles and ZIP code 78884. Leakey is 16.6 miles northwest, Sabinal is 21.1 miles south, and Knippa is 23.2 miles south. Hondo, the nearest larger city, is 28.2 miles southeast; Uvalde, the county seat, is 32.4 miles southwest. Our Yukon, Oklahoma yard is 521 road miles away, a 10.6 hour drive, so distance is part of planning crew mobilization for a Chaney Lane or rural route job.

Places near Utopia

Which jobs call for a bore near Utopia’s Lee Street?

  • Highway crossing: A route beneath RM 187 uses a bore under the roadway, with depth and the TxDOT right of way permit tied to the utility owner’s plan.
  • Water service: A new line near Lee Street can connect toward Utopia Water Supply Corporation service, with marked existing lines exposed before drilling.
  • Fiber drop: A fiber route along Chaney Lane can pass beneath pavement without cutting the street surface, subject to the planned path and site access.
  • Creek crossing: A line beneath the Sabinal River needs a path planned under the channel and a jurisdiction check during planning.
  • Electric conduit: A conduit route near RM 1050 starts with confirming the electric line owner because several utilities report service in Uvalde County.
  • Rural service: A long service run toward Leakey can be scoped by map pin, footage and line size before crew mobilization from Yukon.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What should I send for a Utopia bore near Chaney Lane?

For a Chaney Lane quote, first send the address or map pin so we can place the route. Tell us what is going underground, such as water near Utopia Water Supply Corporation lines or fiber along Lee Street. Then give the pipe or conduit size and footage; a sketch or plans can clarify a crossing beneath RM 187.

A short, accessible service route through clay may be simpler to plan than a crossing beneath RM 187 or the Sabinal River. The route length and pipe size matter, as do Pratley clay, mapped bedrock, marked utilities to expose, pavement, creek crossings, pits and excavator time. Utopia’s 521 road miles from Yukon also affect mobilization. High profile or emergency timing can add planning demands, and each route needs its own scope.

Questions people ask about boring in Utopia

Does Trinity Boring Solutions take Uvalde County jobs in Utopia, and who staffs them?

Yes, we take directional boring work in Utopia and serve Uvalde County with our own crews or from satellite yards run by vetted drilling contractor partners. For Uvalde County work, we stay involved from the first call through the bore log and coordinate with whichever crew is assigned. A route near RM 187 can be planned around the road and its right of way.

Does Pratley soil in Utopia create a corrosion concern, and what pipe can I use?

The soil survey maps high steel corrosion risk across 78 percent of Utopia, so the line owner should consider the material for steel casing and tracer wire. In Utopia’s clay and Pratley soils, we specify HDPE because soil corrosion does not affect it. Near a Chaney Lane route, confirm the pipe and any protective materials with the line owner before the bore plan is set.

What ground does a bore pass through in Utopia’s Pratley soil?

The USDA soil survey maps Pratley clay across 20 percent of Utopia, with Kavett clay at 19 percent and Castroville clay loam at 17 percent. At about 40 inches down, bedrock is mapped in 41 percent of the area, cemented material in 20 percent and clay in 18 percent. A bore near Lee Street still needs site specific planning.

Is there rock on a Utopia bore route, and how much bedrock is mapped?

Yes, bedrock is mapped within the top five feet across 61 percent of Utopia; hard bedrock is mapped in 26 percent and weathered bedrock in 35 percent. Typical bedrock depth is 28 inches. Along RM 187, the exact route can shift between soil and rock, so drill tracking and steering checks matter.

Who approves a Utopia bore under RM 187, and which TxDOT office reviews it?

The utility owner applies for a right of way permit through TxDOT’s RULIS system, and the TxDOT San Antonio District reviews work on RM 187. We provide the bore plan and profile for that application and work under the permit issued to the utility owner. The required cover depends on the type of line and the crossing.

Can you bore a line beneath the Sabinal River in Utopia?

A bore beneath the Sabinal River can be planned to pass below the channel rather than cutting across its bed. The river has 1.29 channel miles inside Utopia, and the crossing is checked for U.S. Army Corps of Engineers jurisdiction during planning. The route, access and existing utilities still need review.

Does Trinity cover Leakey and rural sites outside Utopia?

Yes, we take work in Utopia, Leakey and rural sites outside the mapped community boundary. Leakey is 16.6 miles northwest of Utopia, and our main office in Yukon is 521 road miles away. Send the location and route details so we can account for the job scope and mobilization.

How much Texas811 notice do I need for a Utopia bore on Chaney Lane?

Count back at least two working days from the planned start on Chaney Lane, excluding Saturdays, Sundays and legal holidays; do not request the locate earlier than 14 days before work. The ticket has a 20 day life. If marks wear off or move, have them refreshed through Texas811 before work continues.

What affects the cost of a directional bore under RM 187 in Utopia?

The route length and pipe size are part of the scope, along with Pratley clay, bedrock, utility potholing, pavement, creek crossings, pits and equipment time. A bore under RM 187 may also involve a highway permit and its cover requirements. Utopia’s distance from Yukon affects mobilization, while emergency timing can add planning needs.

Where the Utopia facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Utopia

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Utopia, Texas

Type the address of your job in Utopia. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Utopia

Same county: Uvalde · Uvalde Estates. All counties: Texas county list.