trinityboringsolutions.com

Las Lomitas Texas Directional Boring: Delmita Soil, Mesquite Creek And CPKC Track

Quick Answer: The water provider for a Las Lomitas address needs confirmation before a bore, and AEP Texas Central and Medina Electric Cooperative report service in Jim Hogg County, so we confirm the line owner before planning conduit. We do directional boring, also called horizontal directional drilling (HDD), near Texas State Highway 16. Las Lomitas is 633 road miles from our Yukon office, and that distance matters for work near Mesquite Creek. Delmita soil covers much of the mapped area, while cemented material is common at about 40 inches, so crews plan the bore for changing ground.

Family Business Since 1965 Boring Since 1982 24 Hour Phone No Utility Strike in 25 Years

Las Lomitas bores at a glance

  • Unincorporated community in Jim Hogg County, Texas. Population 235 (2020 Census count).
  • Road distance from our Yukon, Oklahoma main office: 633 miles, about 12.7 hours of driving.
  • Ground: Delmita soil is mapped on 64 percent of the area, with cemented material about 40 inches down.
  • Rock: no bedrock is mapped in the top 60 inches.
  • Highways inside the boundary: Texas State Highway 16 and Texas State Highway 359. State permit office: TxDOT Pharr District.
  • Railroad track inside the boundary: none mapped.
  • Named streams inside the boundary: Mesquite Creek.
  • Texas811: locate request at least two working days before a bore and no more than 14 days ahead.
  • Range: 3/4 inch service lines to 48 inch casing, 10 feet to 5,000 feet.
  • Phone answered 24 hours a day: (405) 409-7423

Who does directional boring near the CPKC (Kansas City Southern) track in Las Lomitas?

We take directional boring work in Las Lomitas, an unincorporated community in Jim Hogg County with 235 people in the 2020 Census count. Water, sewer, gas, electric conduit and fiber lines can run beneath streets such as Robbie Drive or Lisa Street; we check the route and existing lines before drilling. That is how we plan a new service or a replacement without treating every address as if it has the same utilities.

Our main office is in Yukon, Oklahoma, and Las Lomitas work is done with our own crews and from satellite yards run by partner drilling contractors Trinity has personally vetted. For a short service near Robert Lane, we handle lines from 3/4 inch service lines up to 48 inch casing, with bore lengths from 10 feet to 5,000 feet. Our family business started in 1965 and has done directional boring since 1982; the scope near Texas State Highway 359 helps determine the right equipment.

Trinity Boring Solutions Vermeer D24x40 directional drill set up for a bore
Our Vermeer D24x40 directional drill set up for a bore. Photos on this page are from our jobs in Oklahoma and Texas.

What ground does a bore meet in Las Lomitas Delmita soil?

The USDA soil survey maps Delmita soil across 64 percent of Las Lomitas, with fine sandy loam common at the surface. At about 40 inches, 89 percent of the mapped area is cemented material and 11 percent is sandy clay loam. The survey also maps an average clay content of 25 percent at that depth and sandy ground across 10 percent of the area. We treat Las Lomitas mapped soil patterns as planning context, not test borings, when selecting an underground route. A bore near Robert Lane still needs a route plan that accounts for changes below the surface.

USDA soil survey, inside the Las Lomitas mapped community boundaryWhat is mapped
Soil series mappedDelmita 64 percent, Cuevitas 16 percent, Randado 9 percent and Nueces 8 percent
Texture at the surfacefine sandy loam 84 percent, loamy fine sand 9 percent and fine sand 8 percent
Texture about 40 inches downcemented material 89 percent and sandy clay loam 11 percent
Engineering class about 40 inches downclayey sand (SC) 11 percent
Average clay content about 40 inches down25 percent
Bedrock mapped within 60 inchesNone mapped
Seasonal water table within 60 inches0 percent of the area
Flood prone soils0 percent of the area
High corrosion risk for uncoated steel0 percent of the area

Bedrock is not mapped in the top five feet of the Las Lomitas area, but that does not rule out rock deeper down. The USDA soil survey maps no seasonal water table, flood prone soils or high steel corrosion risk in the area. The geologic map shows modern alluvium from the Holocene near active channels and the Goliad Formation from the Miocene below. Alluvium can include sand, silt, clay and gravel; the Goliad unit includes clay, sandstone, marl, caliche, limestone and conglomerate, so conditions can change along a bore.

How do crews handle cemented material in Las Lomitas?

The mapped cemented material at about 40 inches calls for a plan based on the actual route, not just the surface texture. Near Mesquite Creek, we track the drill head and control the bore path as conditions change.

  1. On a Robert Lane route, the survey’s fine sandy loam surface is only part of the picture; mapped cemented material at about 40 inches can change the cutting plan.
  2. Where Delmita soil gives way to sandier ground, staged reaming and drilling fluid help keep the hole supported while the pipe is prepared for pullback.
  3. Near a marked service on Robbie Drive, we hydrovac pothole the line before drilling close; surface paint gives its position, not its depth.
  4. At Mesquite Creek, the locator tracks the drill head from the surface while the crew records depth and pitch to keep the planned path on course.
Open bore pit in red Oklahoma dirt with white PVC conduit stub ups and an orange safety barrier
An open bore pit in red Oklahoma dirt with PVC conduit stubbed up and a safety barrier around it.

Where might a line go under Mesquite Creek in Las Lomitas?

Texas State Highway 16 and Texas State Highway 359 run inside the mapped Las Lomitas community boundary; Texas State Highway 285 is 0.9 miles outside it. A bore along a state route has to be planned for the highway right of way and pavement. The named streets include Robert Lane, at 1.22 miles, Robbie Drive, at 0.55 miles, and Los Palmos Lane, at 0.41 miles. Those routes give a coordinator specific places to check for existing lines and access before selecting a bore alignment.

CrossingTypeMapped extentWho has a say
Texas State Highway 16State highway4.7 roadway miles insideState highway office
Texas State Highway 359State highway1.5 roadway miles insideState highway office
Texas State Highway 285Highway nearby0.9 miles outsideState highway office
CPKC (Kansas City Southern)Railroad nearby0.5 miles outsideThe railroad
Mesquite CreekStream2.24 channel miles insideChecked for Corps of Engineers jurisdiction
Noriacitas CreekStream nearby0.7 miles outsideChecked for Corps of Engineers jurisdiction
Swipe the table sideways to see every column.

No railroad is mapped inside Las Lomitas, but CPKC (Kansas City Southern) track is 0.5 miles beyond the mapped community boundary; no street and rail crossing is mapped inside. Mesquite Creek runs 2.24 channel miles through the area, and three street crossings of named streams are mapped. Noriacitas Creek is 0.7 miles outside the boundary, and no lakes or ponds are mapped within one mile. A creek route needs a ground and jurisdiction check during planning.

Who approves a bore on Texas State Highway 16 in Jim Hogg County in Las Lomitas?

Las Lomitas has no city government, so streets and permits fall to the county or state rather than a city office. For work in the Texas State Highway 16 or Texas State Highway 359 right of way, the utility owner, not the driller, submits a utility permit application through TxDOT’s RULIS system. We prepare the bore plan and profile for that filing, and the TxDOT Pharr District reviews it. Highway cover requirements depend on the line type, and the district can set a different depth in the permit. A CPKC track crossing needs an agreement from the railroad owner; a Mesquite Creek route is checked for Corps jurisdiction during planning.

Read the rules for yourself: Texas Utilities Code Chapter 251 on notice to Texas811, the Texas811 questions and answers page, the TxDOT Utility Accommodation Rules, 43 TAC 21.40 and TxDOT utility permits in RULIS.

Which utilities serve addresses in Las Lomitas and Jim Hogg County?

Before planning a bore for a Las Lomitas address, we confirm the provider with the county or local water district. EPA drinking water records do not tie water systems to towns, and no system carries the community’s name, so the address is what must guide that check. AEP Texas Central and Medina Electric Cooperative report electric service in Jim Hogg County; we confirm the line owner for the specific address before planning an electric conduit bore near Lisa Street.

Line ownerWhat it isSourceSize
AEP Texas Central and Medina Electric CooperativeElectric utilities reporting service in Jim Hogg CountyEIA Form 861Confirm the line owner by address
Swipe the table sideways to see every column.

Housing figures are not published for a place as small as Las Lomitas, so there is no reliable local age breakdown to use for replacement planning. Lines may follow streets such as Robbie Drive, and a long service run can change where access and bore pits fit. Jim Hogg County averages 23.0 inches of precipitation a year, with September the wettest month at 4.5 inches on average. Before drilling near a marked line, we use hydrovac potholing to expose it; paint shows position, not depth.

Trinity Boring Solutions technician hydrovac daylighting along a commercial curbline during utility locating in Oklahoma City
Hydrovac daylighting along a commercial curb line in Oklahoma City to find the utilities before a bore.

Do you cover Las Lomitas and nearby Hebbronville?

Las Lomitas is an unincorporated community in Jim Hogg County, at an elevation of 560 feet and covering 3.95 square miles. Its ZIP code is 78361. Hebbronville, the county seat, is 1.7 miles southwest and has a population of 4,101; South Fork Estates is 6.0 miles southwest. From our Yukon, Oklahoma main office, the drive is 633 road miles and 12.7 hours. That distance matters when planning equipment and crew mobilization for a bore near Texas State Highway 16 or Mesquite Creek.

Places near Las Lomitas

Which jobs call for a bore near Robert Lane in Las Lomitas?

  • Highway crossing: A bore beneath Texas State Highway 16 can keep the pavement uncut while the line passes under the highway right of way.
  • Water service: A service near Robbie Drive needs the address specific water provider confirmed before the bore route is set.
  • Fiber conduit: A fiber route along Robert Lane can use directional boring to avoid opening the street surface along the planned path.
  • Creek crossing: A Mesquite Creek crossing needs a planned route and a check for U.S. Army Corps of Engineers jurisdiction.
  • Rail crossing: A route toward CPKC (Kansas City Southern) track needs an agreement with the railroad that owns it.
  • Street utility: A conduit bore near Lisa Street starts with locating and exposing marked lines along the proposed path.

More on each kind of work: water line boring, electric line boring, fiber optic boring, road, railroad and creek crossings and municipal boring.

What do you need to quote a bore near Texas State Highway 16 in Las Lomitas?

A map pin near Texas State Highway 16 matters because the route may sit in a state highway right of way; a pin by Mesquite Creek flags a different crossing to plan. Send the address, what is going in the ground, the pipe or conduit size and the footage. A sketch or plans help us set the route and identify the work to review.

An open route on a named street such as Lisa Street can be simpler to plan than a bore with several crossings. Price depends on length, pipe or conduit size, and the ground, including cemented material mapped at about 40 inches. Texas State Highway 16, a CPKC track crossing or Mesquite Creek can add coordination and exposure work. Pavement, pits, excavator time and sand backfill also affect the job. Mobilization reflects the 633 road miles from Yukon.

Questions people ask about boring in Las Lomitas

Does Trinity take directional boring jobs in Las Lomitas, Jim Hogg County, and who staffs them?

Yes. We take work in Las Lomitas and across Texas. Our crews do the drilling, with work also supported from satellite yards run by partner drilling contractors we have vetted. You work with Trinity from the first call through the bore log, including for a route near Texas State Highway 16.

How old are buried lines near Robbie Drive in Las Lomitas?

Public housing age figures are not published for Las Lomitas because the place is too small for a reliable survey sample. That means we cannot assume a Robbie Drive line is old or new from a townwide housing statistic. We locate and expose marked utilities along the proposed path before a replacement bore gets near them.

What ground is mapped for a bore through Delmita soil in Las Lomitas?

The USDA soil survey maps Delmita soil across 64 percent of Las Lomitas, commonly with fine sandy loam at the surface. At about 40 inches, cemented material covers 89 percent of the mapped area and sandy clay loam 11 percent. These are survey patterns, not test boring results, so the route still needs planning.

Can we tell from mapped soil patterns whether a bore in Las Lomitas will hit rock, or are test borings needed?

Bedrock is not mapped in the top five feet of the area, which does not rule out rock deeper down. The geologic map shows Holocene modern alluvium and the Miocene Goliad Formation, which includes sandstone and limestone among other materials. A bore near Mesquite Creek needs a route specific assessment rather than an assumption based on the map alone.

Who do we contact to approve a bore under Texas State Highway 16 in Las Lomitas?

The utility owner submits the right of way permit application through TxDOT’s RULIS system, and the TxDOT Pharr District reviews it. We prepare a bore plan and profile for the owner’s application. For a Texas State Highway 16 crossing, the permit sets the applicable requirements, including cover depth.

What does a bore under CPKC (Kansas City Southern) track near Las Lomitas need?

The crossing needs an agreement from CPKC (Kansas City Southern), which owns the track mapped 0.5 miles outside the community boundary. The railroad agreement sets crossing conditions such as casing, depth and flagging. If the route also uses highway right of way, TxDOT asks for a copy of that agreement.

What bore sizes and lengths can you handle near Lisa Street in Las Lomitas?

For a job near Lisa Street, we handle lines from 3/4 inch service lines up to 48 inch casing. Bore lengths range from 10 feet to 5,000 feet. The right setup depends on what the line carries, the ground along the route and crossings that need to be cleared or permitted.

How much Texas811 notice is needed for a bore near Robert Lane in Las Lomitas?

Paint near Robert Lane shows a marked line’s position, not its depth. Texas law requires a locate request at least 48 hours before excavation starts, excluding Saturdays, Sundays and legal holidays, and no earlier than 14 days ahead. If the start slips more than 14 days past the original notice, make a new request; worn or moved marks need refreshing through Texas811 before work continues.

What affects the cost of a bore near Texas State Highway 16 in Las Lomitas?

The route and scope determine the work. Length, line size, cemented material, pavement, utility crossings, creek work, pits and excavator time can all affect planning. A Texas State Highway 16 crossing may need permit coordination, while a route near Mesquite Creek brings a different crossing review. We account for the 633 road miles from Yukon when scheduling mobilization for boring work in Las Lomitas.

Where the Las Lomitas facts on this page come from

Darren Rice in a safety vest at the bore pit beside the Trinity Boring Solutions Ditch Witch directional drill, with drill rods racked, on the airfield at Will Rogers World Airport in Oklahoma City

About Trinity Boring Solutions

Trinity Boring Solutions is a family business in Yukon, Oklahoma, founded by Dean Rice in 1965 and owned today by Darren Rice, who started its directional boring side in 1982. The company bores across Oklahoma and Texas. No bore is too big or too small: 4 foot sidewalk sleeves to roughly 4,100 feet under the Arkansas River in Tulsa. Reach us at (405) 409-7423.

Get a Quote for a Bore in Las Lomitas

Send the address, what is going in, the size and the footage.

Trinity Boring Solutions
9102 NW Expressway, Yukon, OK 73099
(405) 409-7423 | darren@trinityboringsolutions.com

Trinity Boring Solutions | 24/7 Available ☎ Call (405) 409-7423 Free Quote

Free Bore Planner

Plan Your Bore in Las Lomitas, Texas

Type the address of your job in Las Lomitas. The Bore Planner opens an aerial map at that spot. Drop one pin where the bore starts and one where it ends, tell us what is going in and send the scope to our crew.

Talk to the crew that does the work

Fastest way to a number is a phone call. Tell us where the crossing is and what is going in the ground, and you will get a straight answer on the same call. Bores from 10 feet to 5,000 feet, 3/4 inch service line through 48 inch casing, anywhere in Oklahoma and Texas. We run 24/7 for main breaks and emergency repairs.

Call (405) 409-7423

Answered by a person, not a call center.

Would rather not call? Send the details and we will come back with a written quote.

Quick Quote In Page

County and State Pages for Las Lomitas

Same county: Guerra. All counties: Texas county list.